Source: Supervision Engineer
Supervision signature term specifications
1 Construction quality acceptance technical data general table
1, "Starting Report" review opinions are filled in: Construction preparation work is completed, and construction is approved.
2, "List of Main Managers of Engineering Project Construction Enterprises" review opinions: Agree to the qualification review.
3, " Construction Organization Design (Construction Plan) Approval Form" The supervision unit fills in the review opinions: After review, the construction organization design complies with relevant specifications, standards, drawings and contract requirements, and agree to implement the construction organization design according to this.
4. "Construction Technology Briefing Record" supervision unit fills in the inspection conclusion: Meet the requirements.
5, "New Materials, New Processes, New Technology, New Equipment Application Application Approval Form" Fill in the review opinion: Agree.
6. Fill in the acceptance conclusion of the supervision unit of "Concealed Project Acceptance Record": Agree to conceal and enter the next process.
7. "Project Report and Inspection Form" supervision unit fills in the opinions: Comply with the design requirements and specifications, and pass the acceptance.
8, "Project Completion Acceptance Report Form" supervision unit fills in the opinions: After pre-acceptance, this project complies with the current laws, regulations, design documents and relevant quality acceptance specifications, standards and construction contract requirements. This project is pre-accepted.
9, “Examination Record for Unboxing of Main Equipment” verification conclusion: Agree with the inspection results of the construction unit.
10, "Sub-item, sub-partition (sub-partition) projects pass the acceptance signing form": each sub-partition project meets the construction quality acceptance specification requirements; the quality control data and safety and function inspection (testing) reports are complete and qualified; the visual quality is good.
11. "Evaluation of project quality by all parties participating in the project completion acceptance" conclusion: The unit project completion acceptance is qualified.
12, "×× Project Visual Quality Inspection Record" verification conclusion: agree to the inspection results of the construction unit and pass the acceptance.
13, "Construction Site Quality Management Inspection Record" verification conclusion: After verification, the above items meet the requirements.
14, "×× Sub-project Quality Acceptance Record" Supervision Unit Acceptance Conclusion Box: Pass. Fill in the acceptance conclusion column: Agree with the construction unit’s inspection conclusion and pass the acceptance.
15. "Sub-sub-division project quality acceptance record" sub-project name column acceptance opinions: each sub-division project is accepted by qualified; the quality control data column is filled in: the quality control information of each sub-division project is complete; the safety and function inspection report column is filled in: the construction unit evaluation is agreed; the visual quality acceptance column is filled in: the construction unit evaluation is agreed; the supervision unit column is filled in: each sub-division project meets the specification requirements, the quality control data and safety and function inspection (testing) reports are complete, qualified, the visual quality is good, the construction unit evaluation results are approved, and the acceptance is qualified.
16, "Unit (Subunit) Project Quality Completion Acceptance Record" acceptance conclusion is filled in the branch project column: After acceptance by various professional branch projects, the project quality meets the acceptance standards;
Quality control data column is filled in: After inspection, the quality control data meets the relevant specification requirements;
Safety and main usage functions and random inspection conclusions Fill in the fruit column: The safety and main functions are checked to meet the requirements, and the use projects of × are all met in random inspections; fill in the visual quality acceptance column: The visual quality acceptance is good; fill in the comprehensive acceptance column: After comprehensive acceptance of this project, each sub-item project meets the design requirements, the construction quality meets the relevant quality acceptance specifications and standards, and the unit project is completed and accepted.
17, "Unit (Subunit) Project Quality Control Data Verification Record" conclusion column: After the project quality control data verification, the project data is complete and effective, and various construction tests, system debugging records, etc. comply with relevant specifications and agreed to the completion acceptance.
18. "Unit (sub-unit) project safety and function inspection data inspection and plan random inspection records" fill in the random inspection results: qualified; fill in the conclusion column: Check the safety and functional information of this project, basically meet the requirements, and conduct sampling inspections on the main functions of the unit project. The inspection results are qualified, meet the use function, and agree to the completion acceptance.
19. The quality evaluation column of "Unit (Subunit) Project Visual Perception Quality Inspection Record" is in the good or general grid; the comprehensive evaluation of visual perceptual quality is good; the conclusion is: the comprehensive evaluation of engineering visual perceptual quality is good and the acceptance is qualified.
2 Project quality control data table
1, "Steel Structure ×× Project Quality Control Data Verification Form" Supervision Unit Inspection Conclusion Fill in: The project data is complete and effective, and various construction tests, construction records, etc. meet the specification requirements.
2. "Summary of inspection and acceptance records of raw materials, steel components, and accessories" supervision verification conclusion: pass; inspection conclusion of supervision unit: complete records and meet the requirements.
3, "The acceptance record of the entry inspection and acceptance of this material, steel components, and accessories" acceptance results are filled in: qualified; the verification conclusion of the supervision unit is filled in: Comply with the design requirements and the provisions of " Steel Structure Engineering Construction Quality Acceptance Specification " (GB50205).
4. "Summary of qualified certificate documents for raw materials, steel components, and accessories" Supervision unit fills in the inspection conclusion: ××The qualification certificate documents are complete and the inspection is qualified.
5, "Inspection Report, Re-Inspection, Re-Inspection Report Summary Table" Supervision Unit Fill in the Inspection Conclusion: The inspection institute has complete ×× quality inspection report documents and pass the re-examination results.
6. "Inspection records of inspection and witnessing safety and functions of steel structure branch (sub-division) projects" inspection conclusion of the supervision unit: complete inspections of safety and function inspection and witnessing test items.
7, "Bake record of welding materials ( welding rod , welding wire , flux)" supervision unit's inspection conclusion item: Meet the requirements.
8, "Othermal, accessories pre-(post) heat treatment record" supervision unit fills in the inspection conclusion: meet the requirements.
3 Construction and Structural Engineering Safety and Function Inspection or Random Inspection Record
1, "Roof Water Drying and Storage Test Record" Supervision Conclusion Fill in: Comply with the design and specification requirements.
2, "Basement Waterproof Effect Inspection Record" Supervision Conclusion Fill in: Comply with the design and specification requirements.
3, "Flow-splashing and water storage test records of bathrooms, kitchens, balconies and other floors with waterproofing requirements" Fill in the supervision conclusion: Comply with the design and specification requirements.
4, "Pumping (wind) channel inspection record" conclusion item: Comply with the design and specification requirements.
5, "Summary of conclusions of the airtightness, watertightness, and wind pressure resistance test report for curtain wall and external windows" fill in the conclusions of the test report:
test result is qualified.
6, "Observation record for settlement from start to finish" conclusion: meet the requirements.
7, "Summary of Conclusions of Interior Environmental Inspection Report of Civil Construction Projects" fill in the conclusions of the inspection report: The indoor environmental quality of the project is qualified.
4 Sub-item inspection batch quality acceptance record
1. Whenever the sub-item inspection batch quality acceptance record form encounters the acceptance opinion column of the supervision unit: pass; fill in the acceptance conclusion of the supervision unit: After inspection, it meets the design and specification requirements and is qualified.
2. Whenever the quality acceptance record form of the inspection batch of the sub-projects is encountered, it is filled in the acceptance record column of the supervision unit: after inspection, it meets the design and specification requirements; fill in the acceptance conclusion column of the supervision unit: agree to the evaluation results of the construction unit and pass the acceptance.
5 Basic requirements for compliance review
1. All tables used in engineering projects should be uniformly used for provincial or municipal tables and should not be mixed; when there are insufficient provincial and municipal tables, self-made tables must be submitted to the provincial and municipal stations for filing.
2. The full name of the project name column at the header should be filled in, which is consistent with the project name in the contract or bidding documents.
3. The names of each responsible subject should be written in the full name, which is the same as the unit name on the contract signature and seal. The project manager column should be filled in: the signer or the representative appointed by the signer in the contract form is consistent.
4. Check whether the content of various materials, data and acceptance signatures are true, complete and standardized.
5. When there is no project content in the table, you should make a diagonal line; when qualitative projects meet the requirements of the specifications, you should mark them with the correct marks, and when they do not meet the requirements, you should use the method of marking them with the cross.
6. The engineering materials are printed on A4 format paper. The signature column shall not be printed. Each signer shall sign separately and shall not be replaced by the information officer. The signature must be clearly identifiable.
7. The writing and signature of engineering materials should be written using carbon ink with strong durability and blue black ink. It should not be written using red, pure blue ink, ballpoint pen, pencil, etc. that are prone to fading.
8. Any supervisor of the unqualified data review should be returned in a timely manner and the reporting unit should be required to make rectification within a time limit.
9. Adhere to the principle of synchronizing project data filling and project progress.
10. Matters not covered shall be subject to the relevant current regulations issued by the construction administrative department or authorized unit. The main control project and general project are accepted, and the strength of concrete and mortar specimens is determined after the test report is released, and all other projects have been accepted. Note "Agree to acceptance and carry out the next process construction" or "acceptance is qualified". Professional supervision engineer professional technical person in charge of construction unit signed.
sub-project acceptance should be noted:
1. It is to check whether the inspection batch covers the entire project with missing parts;
2. It is to check whether the inspection batch has concrete and mortar strength requirements, and whether it can meet the specifications after the age period;
3. It is to unify the information of the inspection batch , and register and organize it in turn for convenient management.
Professional supervision engineers of the supervision unit (professional person in charge of the construction unit) should review items one by one, fill in "qualified or meet the requirements" for the approval items, and do not fill in the items that do not agree for the time being, and they will be accepted after being processed, but should be marked. Indicate the opinions on acceptance and non-acceptance. If you agree to the acceptance and sign and confirm, please point out any problems if you do not agree to the acceptance and clarify the handling opinions and completion time.