On June 8, we learned from relevant channels that a new rubber and plastic products production project will be built at No. 1387 Lingang Road, Yinzhu Street Office, West Coast New District, Qingdao, with a total investment of 2 million yuan.

2024/06/3006:36:32 hotcomm 1394
htmlOn June 8, we learned from relevant channels that a new rubber and plastic products production project will be built at No. 1387, Lingang Road, Yinzhu Street Office, West Coast New District, Qingdao, with a total investment of 2 million yuan. The east side of the

project is Maoyuan Industrial Park, the west and north sides are Taifa Group, the south side is Lingang Road, and across the road is Qingdao Maohua Special Vehicle Co., Ltd.

1# workshop rents an existing workshop, a brick-concrete structure factory building, with a building area of ​​2,400 square meters, and entrance doors on the west and north sides of the workshop. The workshop is mainly a rubber product production workshop, with closed batching, mixing, kneading, and extrusion rooms. and sealed vulcanization room, etc.; 2# workshop brick-concrete structure factory building, with a workshop building area of ​​2100 m2, is mainly a plastic product production workshop, with a separate injection molding area, finished product area, etc.; 3# workshop brick-concrete structure factory building, with a workshop building area of ​​2500 m2, Mainly equipped with assembly area, finished product area, etc.; the office has a brick-concrete structure with a construction area of ​​600 square meters. The products of the

project are solid rubber rings, rubber powder rings, and plastic spokes.

① Solid rubber ring: used for dynamic seals (piston seals, piston rod seals) and static seals (axial seals) of hydraulic and pneumatic components. Its function is to isolate parts that require liquid substances in transmission parts from the external environment to prevent liquid substances from seeping leakage and acts as a seal. Used in diesel engine crankshafts, gearboxes, differentials, shock absorbers, pipe interfaces, ends, flanges and other parts of seawater desalination equipment.

② Rubber powder ring: used as dock fenders, shock absorption and buffering when yachts go ashore; the project only produces C2913 rubber parts manufacturing, C2919 other rubber products manufacturing and C2929 plastic parts and other plastic products manufacturing. The company signs a letter of commitment and does not Produces tires.

The batching and mixing process of rubber powder rings will produce batching dust, waste mineral oil barrels, collection dust, waste bags, noise, etc. The vulcanization process will produce sulfurization waste gas (mainly VOCs, odor concentration), waste activated carbon, waste sediment, waste lubricating oil, waste mineral oil barrels, noise, etc. The ingredient dust of the

project is collected and processed by a bag dust collector. Together with the collected sulfurized waste gas, it is processed by a set of "water spray + two-stage series activated carbon adsorption" device and then discharged through a 15m exhaust pipe P1. The waste gas The treatment will produce waste activated carbon, waste sediment, waste bags and dust collected by bag dust collectors.

The solid rubber ring batching process will produce batching dust (particulate matter), ordinary waste packaging materials, hazardous waste packaging materials, collected dust, waste bags, noise, etc. The feeding and internal refining processes will produce internal refining feeding dust, internal refining waste gas, waste activated carbon, waste sediment, collected dust, waste bags, waste lubricating oil, waste mineral oil barrels, and equipment noise. The refining process will produce refining waste gas, waste activated carbon, waste sediment, waste lubricating oil, waste mineral oil barrels, noise, etc. The extrusion process will produce extrusion waste gas, waste activated carbon, waste sediment, waste lubricating oil, waste mineral oil barrels, noise, etc. The vulcanization process will produce sulfurization waste gas, waste activated carbon, waste sediment, waste lubricating oil, waste mineral oil barrels, noise, etc. The batching dust, internal refining waste gas and internal refining feed dust of the

project are collected and processed by a bag dust collector. Then, together with the collected refining waste gas, extrusion waste gas and sulfurization waste gas, they are passed through a set of "water spray + secondary series activated carbon" After treatment by the "adsorption" device, it is discharged through a 15m exhaust pipe P1. The waste gas treatment will produce waste activated carbon, waste sediment, waste bags and dust collected by the bag dust collector.

The plastic spoke injection molding process will produce waste gas, waste activated carbon, waste hydraulic oil, waste mineral oil barrels, noise, etc. There are a total of 60 employees in the

project. There is no canteen or accommodation in the factory. The working system is three shifts, one shift works 8 hours, and the annual working day is 300 days.

On June 8, we learned from relevant channels that a new rubber and plastic products production project will be built at No. 1387 Lingang Road, Yinzhu Street Office, West Coast New District, Qingdao, with a total investment of 2 million yuan. - DayDayNews

Within 500m outside the factory boundary are Taifa Penang, Yongshunda Community, and Dongjiazhuang Village. Among them, the project for sale is Gongyuan Jingyue Mansion, which is relatively close.

hotcomm Category Latest News