official account: Construction engineer Shi Liangyu
Previous issue answers: 1: A 2: C 3: C 4: ABCD 5: BCD
1. [Single choice question] When designing a cast-in-place concrete box beam bracket, the load used to calculate strength and verify stiffness is ().
A, the self-weight of concrete box beams
B, the load of construction materials and equipment
C, the load of concrete
D, the horizontal impact load of concrete
2, [Single choice question] Where river seepage is very small, the flow rate is ≤3.0m/s, and the stones can be used for local materials, ( ) cofferdams should be used.
A, soil
B, soil bag
C, lead wire cage
D, rock pile soil
3, [Single choice question] prestressed tensioning equipment should be verified, and its verification period shall not exceed ( ) and shall not exceed ( ) tensile operations.
A, 100
B, 150
C, 200
D, 400
4, [Multiple choice question] The track structure is a structure composed of ( ) and so on.
A, rail
B, turntable
C, track bed
D, sleeper
E, power supply circuit
5, [Multiple choice question] When designing prestressed concrete structure formwork, prestressing should be considered after ( ), etc.
A, upper arch of component
B, support bolt displacement
C, non- elastic deformation of component
D, embedded part displacement
E, elastic compression of component
answer comment area and see you next time~