project is located in the core area of Fengxian New City , facing Wenyao Road in the east, Miaojing Central River in the south, Jiefang East Road in the north, and Dingfeng Road in the west, and is close to Fengxian landmark - Shanghai Fish ( Jinhai Lake ). The total construction area is about 87,050.67 square meters, and there are 487 residential units (of which 448 are available for sale). There are 5 basic apartment types (3 high-rise apartment types, 2 superimposed apartment types), with a total area of 83-159 square meters.
★ Latest progress ★

At present, the stacked villa of the project has completed the structural capping, and the high-rise building is built to eight floors on average. The marketing center is planned to open grandly on August 27.
Fengfa Guanlanxuan (Shanghai Fengxian Bay 13-02 Spark Fire Plot)

project is located in the Spark Fire Development Zone, Fengxian District, from Hainong Highway in the east, Lianxiang Road in the west, from the south to plot 13-06, and from Xinhuhang Highway in the north. The total construction area is 84,877.72 square meters, and the total construction area is 651,816.65 square meters. The project floor area ratio is 1.5.
★ Latest progress ★

Currently, the southern district is in the underground structure construction stage, and the northern district is in the main structure construction stage.
Fengfa Youyanxuan (E09E-01 area plot of Unit 21, Fengxian New City, Fengxian District)

project is located in Fengpu Street, Fengxian District, from the east to Linan Road (planned road), from Zhangwengmiao Road in the south to Yunan Road in the west to Ningqing Road in the north. The total construction area is 90,641.27 square meters, the total construction area is 57,402.28 square meters, and the project floor area ratio is 2.5.
★ Latest progress ★

foundation pit enclosure pile project has been completed, and is currently in the stage of earth excavation and first support construction.
New construction project of Fengxian District Public Health Center

project is located in the E01-04 plot of Unit E01-04, FXC1-0021, Fengxian New City, and is divided into three units: public health center, ancillary facilities, and basement. Among them, the functions of the public health center will be integrated into four parts, namely business management, public services, the Center for Disease Control and Prevention Laboratory and Blood Station. The total construction area of the project is 35,181.17 square meters, of which the above-ground construction area is 21,961.51 square meters and the underground construction area is 13,219.66 square meters.
★ Latest progress ★

Currently, the excavation of the foundation pits in the first and second areas of the underground garage has been completed. The bottom plate construction of the first and second areas of the underground garage is currently underway. The project is expected to be completed in March 2024.
Jinbi Huijingyuan (Relocation resettlement housing project of 02A-06A, Unit 15, Nanqiao New City, Fengxian District)

project is located in Jinhui Town, Fengxian District. It is located in Jinhui Town, Fengxian District. It is located in Jinbi Road in the east, Huiyi Road in the south, Daye Highway in the north, and on the west side is planned construction land. The total construction area is 116,607.02 square meters, the total construction area is 80,556.57 square meters, and the building floor area ratio is 2.28.
★ Latest progress ★

on-site construction has been basically completed and is currently in the acceptance stage of various special projects.
Unit 16 Jinshui Liyuan Kindergarten (tentative name) New construction project

project is located on the east side of Jinshuiyuan Middle School, the north side of Guangfeng Road, and the south side of Jinshui Liyuan Community. The construction scale is a 15-class kindergarten with a land area of 7,744 square meters and a construction area of 6,800 square meters. The construction content mainly includes children's teaching rooms, activity rooms, living rooms, office rooms, canteens, distribution rooms, doormen and other auxiliary rooms, as well as outdoor overall projects such as event venues, roads, greening, and walls.
★ Latest progress ★

At present, the insulation construction in the project has been completed and the finely decorated model room is under construction. The roof waterproofing and insulation have been completed, the manganese, magnesium, aluminum plates have been laid, and partial edge collection has been closed. exterior wall real stone paint spraying is completed, and partial repair is underway. The scaffolding is about to be removed and the outdoor project is about to be launched. The overall physical workload is planned to be completed on September 30.
Shanghai Fengxian Jingfa Commercial Plaza project

Project is adjacent to the river channel in the east, Canal North Road in the south, Chenqiao Road in the west (planned not built), and Jiuhualiyuan Phase I and II communities in the north.The main building on the ground is a multi-story commercial building, and the underground floor is partly a civil defense area, which is usually a parking garage, with a garage floor height of 5.5 meters. The first floor is a shopping mall with a floor height of 5.4 meters, and the second floor and above are shopping malls with a floor height of 4.2 meters. After the project is completed, it will greatly facilitate the lives of surrounding residents.
★ Latest progress ★

The main structure has been completed on July 30, and curtain wall, HVAC, fire protection and other units have entered the site for subsequent construction.
Jiuhualiyuan Phase 5 (Jiuhua Jinyuan)

project is located in Fengpu Street, facing the planned river channel in the east, the planned canal road in the south, the plot 07A-01 in the west, and the north canal north. The residential building area is about 54,694.38 square meters, including 4 high-rise residential buildings, and 1 supporting commercial and property supporting housing, etc., with a total investment of about 789.0191 million yuan, and 522 households can be resettled.
★ Latest progress ★

Currently, the main structure of the 4 buildings have been completed, the interior decoration project has been completed 80%, the overall outdoor project has been completed 50%, the exterior wall paint project is under construction, and the overall project has taken shape. The physical project is planned to be completed by the end of August, and the completion filing and delivery are completed in December 2022.
Fengxian New City Unit 11 Nangang Road Kindergarten (tentative name) New construction project

project is located in the C03-04 plot of Unit 11, Fengxian New City, from Jinhaoliyuan to Baifeng Road in the east, west to Dongbaichun Road in the west, and north to Jinhaoliyuan. The land area is 7264.5 square meters and the construction area is 6866.62 square meters. There are 5 childcare classes, 10 kindergarten classes, 1 multi-functional activity room, and 1 teacher's restaurant. The construction content mainly includes children's teaching rooms, activity rooms, living rooms, office rooms, canteens, distribution rooms, garbage rooms, doormen and other auxiliary rooms, as well as outdoor overall projects such as activity venues, roads, greening, and fences, and simultaneously implement power, water supply and drainage, gas and other pipeline projects.
★ Latest progress ★

Currently the project is in the main structure construction stage. The first layer has been completed and the second layer has been 50% completed. It is planned to complete the structural acceptance in October 2022 and complete the construction in March 2023.
"Nanqiaoyuan" Nanqiao Academy Sports Field and underground parking garage reconstruction project

project ends at the Punan Canal in the north, Nanqiao Road in the west, Xinjian Middle Road in the south, and Renmin Road in the east. The main functions are parking and rooftop sports fields. It is mainly a single-story parking building. The building adopts a frame structure and has a building height of 3.5 meters. The upper floor, the underground floor and the first floor of this project are arranged with car parking areas and pick-up areas. The underground floor is a car parking area and some charging areas and equipment rooms. There are 360 car parking spaces, including 45 charging spaces. The fully buried civil air defense basement is set on the first floor of the underground. The roof on the ground is a basketball court, and the playground and runway on the east side are.
★ Latest progress ★

Currently the project is in the overall outdoor and interior decoration, equipment installation and debugging stages, and 95% of the total progress has been completed.
Nanqiao Catholic Hall Moving Project

project is located in Unit 04, Fengxian New City, with a plot 14-04 in the east, a public green space in the south, a plot 14-06 in the west, and a canal road in the north. The project consists of 2 units, Catholic church and distribution rooms. The Catholic church has a construction area of 3517.74 square meters, a two-story frame structure, a building height of 23.5 meters. The first floor is a chapel, a mass hall and an auxiliary building. The auxiliary building has doormen, conference rooms, lounges, reception halls, equipment rooms, etc. The project site area is 6821.5 square meters, and there are 19 motor vehicle parking spaces and 81 non-motor vehicle parking spaces.
★ Latest progress ★

Currently the project is in the main structure construction stage, the second-story frame structure has been completed, and the remaining mesh roof and tower are expected to be completed in early October. After the structure construction is completed, it will enter the decoration construction stage and is planned to be completed in March 2023.
"San Gu" urban renewal project

project starts from Jiefang Road in the south, Xinjian Middle Road in the north, Chengxiang Road in the west, and Guhuayuan Road in the east. At present, it contains two plots (the area plot of 09-04B, Fengxian New City, Fengxian District, and the area plot of 09-02, Fengxian New City, Fengxian District). The total construction area is 87,865.75 square meters, of which the 09-04B plot is 13,168.20 square meters, and the floor area ratio is 1.5; the 09-02 plot is 37,578.24 square meters, and the floor area ratio is 1.2.
★ Latest progress ★

Meigu Meiku Bonded Warehousing and Trade Port Project

project is located in the comprehensive bonded area of Fengxian District, from Fengke Road to the east, from Yuannan Road to the south (planned), from Nanzhugang Road to the west, and from Central Avenue to the north. The total land area is 130,956.1 square meters and the total construction area is 134,823.81 square meters. It integrates components into international logistics, warehousing, trade, office, display, and services. The project focuses on related industries such as "beautiful and healthy", "smart manufacturing", and "cross-border e-commerce", and creates a new benchmark for bonded logistics in Shanghai, mainly providing R&D and design, circulation and processing , import and export transaction display, bonded warehousing and supply chain financial services.
★ Latest progress ★

Currently, rooms 1, 2 and 7 are in the steel structure hoisting stage, room 8 is unloading platform in the formwork system erecting, and other rooms are in the foundation construction stage.
The sun is scorching, the heat waves are rolling
can't stop project construction "Fast and Passion"
Here
Let's say to the front-line builder who is stuck at his post in high temperature and scorching heat
: Thank you!
Report: Fengfa Group
Editor: Wu Yan