Zhao Youping Zhang Liyuan
[Global Network Report Reporter Zhao Youping Zhang Liyuan] A "big event" happened in Taiwan at 4 pm today (6th), and the main media on the island sent messages.
Please read the report:
Taiwan "Central News Agency": Suhua reform is opened to traffic, Suao to Hualien has shortened nearly an hour ↓
![Zhao Youping Zhang Liyuan [Global Network Report Reporter Zhao Youping Zhang Liyuan] A](https://cdn-dd.lujuba.top/img/loading.gif)
![Zhao Youping Zhang Liyuan [Global Network Report Reporter Zhao Youping Zhang Liyuan] A](https://cdn-dd.lujuba.top/img/loading.gif)
Taiwan "United News Network": Su Zhenchang announced that Suhua reform will be opened to traffic, and will be opened to traffic from 4 pm ↓
![Zhao Youping Zhang Liyuan [Global Network Report Reporter Zhao Youping Zhang Liyuan] A](https://cdn-dd.lujuba.top/img/loading.gif)
![Zhao Youping Zhang Liyuan [Global Network Report Reporter Zhao Youping Zhang Liyuan] A](https://cdn-dd.lujuba.top/img/loading.gif)
Taiwan "Sanli News Network": After 3228 days of hard work! Su Zhenchang announced that "Suhua reform" will be opened to traffic at 4 pm ↓
![Zhao Youping Zhang Liyuan [Global Network Report Reporter Zhao Youping Zhang Liyuan] A](https://cdn-dd.lujuba.top/img/loading.gif)
Taiwan "Liberty Times": After 3228 days of completion of the last mile, Prime Minister Su announced that Suhua reform will be opened to traffic↓
To sum up, the above news expresses this meaning: After nearly 9 years of construction, Taiwan finally repaired three sections of 38.8 kilometers, and the entire line will be opened to traffic at 4 pm this afternoon. The "Suhua Reform" mentioned in the news refers to the improvement plan for the mountainous section of Taiwan Line 9 Suhua Highway . It is divided into three sections: Suao to Dong'ao (Section A), Nan'ao to Heping (Section B) and Hezhong to Daqingshui (Section C). The improvement length is 38.8 kilometers. Among them, Suao to Dong'ao (Section A) has been opened to traffic on February 5, 2018, and today it is the BC section. After the full line was opened to traffic, the distance from Suao to Hualien was shortened by 18.6 kilometers, saving 59 minutes of driving time.
![Zhao Youping Zhang Liyuan [Global Network Report Reporter Zhao Youping Zhang Liyuan] A](https://cdn-dd.lujuba.top/img/loading.gif)
Schematic diagram of the third section of the "Suhuahua Reform". Source: Hong Kong media