2022 first-class cost engineer prediction test point pricing: engineering pricing information, a finishing touch prediction, long press and like + forward + evaluation continue to be updated, click on my avatar on the Wendang version and send a private message to me: 2022
Project pricing information mainly includes three categories: price information, engineering cost index and engineering cost index.
1. Price information
is generally not processed by the system, and can also be called data.
(1) Manual price information
1) The physical engineering quantity manual price information
is an object according to the different division standards of the construction project, and the unit physical engineering quantity manual price information reflected.
2) Construction work labor cost information
is classified according to the type of work of construction workers, reflecting the unit wage price of units of different types of work.
(2) Material price information
Material price information release should disclose information on material category, specifications, unit price (whether it includes tax and tax rate), supply area, supply unit, and release date.
(3) Construction tool price information
main content is construction machinery price information, which is divided into two parts: equipment market price information and equipment rental market price information.
The latter is more important for pricing. The published machinery price information should include the type of machinery, specifications and models, supplier name, rental unit price, release date and other contents.
2. Engineering Cost Index (2021 Revised)
Engineering Cost Index is an index that reflects the degree of impact of price changes on engineering cost in a certain period, including the market price index of human resources and machine, single project cost index, and construction project cost comprehensive index.
3. Project cost index
The cost value after unified format and standardization is based on various cost information of completed or under construction projects. It can be used to analyze the cost of completed or under construction projects and to calculate the basis for the proposed projects.