2022 first-class cost engineer prediction test point case: precautions for the preparation of bid documents, create a finishing point prediction, hold on to like + forward + review continue to update, click on my avatar on the Wendang version and send a private message to me: 2022
1, be familiar with the drawings and bidding documents requirements
2, on-site investigation, understand the actual situation
3, clarify the scope of bidding - figure out what Party A really needs
htmlm l3
4. Inquiry on materials and equipment - the unit price needs to be customized by the company, and he is responsible for
5. Preparation of technical bids
6. Calculate bid quotations (based on bidding documents, technical plans, drawings, market prices, relevant quotas and pricing specifications )
7. The difference between the project volume of the bidding documents and the actual project volume
8. Comprehensive unit price: Bidder risk, if you report the wrong one, you are unlucky!
9. Measures items: The quantity of the list can be adjusted, and the unit price is also the comprehensive unit price.
10. Material unit price and equipment unit price: as a backup quotation, the total price is not included.
11. Total price of professional projects: temporary estimated amount is included in the total price.
12, daily work : The tentative total price is included in the total price.
13. The bidder's price quotation method cannot be changed, otherwise the bid will be cancelled!
14. The total price must include fees and taxes.
15. Pay attention to blocking price or maximum price limit, exceeding the scrap price.
Quotation Strategy:
(1) Bidding strategy is the bidder's business strategy. Survival, competitive, and profitable.
(2) Bidding skills: unbalanced quotation, multi-program quotation, sudden price reduction method, loss first and then profit, promise preferential conditions, etc.
Bid margin
does not exceed 2% of the estimated bid price and does not exceed 800,000.
Bid submission:
(1) Submit on time, if you are too late, you will refuse to accept it.
(remember: not aborted bid)
(2) Participate in the bid opening, authorization letter, ID card.