Basic information
Building type | Standard hospital and health station | |
Current status html ml3 | in use | |
Land area | 89,671.5㎡ | |
Building area | Total construction area 37,506㎡ | |
Total beds | 1478 beds | |
html l0 Building height | 6.5m | |
Building floors | https://www. tml1 design start and end time | March 11, 2022-March 20, 2022 |
Completion time | March 24, 2022 | Open operation time | April 2022 |
Trust unit | Decheng District Urban and Rural Construction Bureau | |
Main medical operation unit | Dezhou Municipal Hospital | |
Dezhou Provincial Architectural Design Research Institute Co., Ltd. | ||
Construction unit | donghai Construction Group Co., Ltd. |
Overall design
This project is the Fangca Hospital of Decheng District, Dezhou City, Shandong Province, Xinhe Road Health Station Project , located north of Xinhe Road, Decheng District, Dezhou City, Shandong Province and west of Jiefang South Avenue. The first floor of the above ground floor of the Fangca Hospital in Decheng District is 11,034.00 ㎡; the second floor of the above ground floor of the Health Station in Xinhe Road, Decheng District is 25,862.6 ㎡. All use prefabricated and lightweight steel structures. (As shown in Figures 1 to 2)

Figure 1-Southeastward Aerial View

Figure 2-Planning General Plan
This project is divided into two parts: Square Hospital and Health Station . Among them, there are 5 nursing units in the square cabin hospital, with a total of 1,518 beds. Each nursing unit is laid out according to the medical process of infectious diseases. It is basically divided into clean areas, restricted areas (semi-clean areas), isolation areas (semi-polluted areas and polluted areas). Buffering rooms and isolation measures are set up between the corresponding areas. The streamlines between medical staff and patients are strictly divided, and special routes for cleaning logistics and pollution logistics are set up, and they do not intersect each other.
Health Station is divided into isolation rooms, medical rooms, and service rooms, with a total of 936 beds. (As shown in Figures 3 to 4)

Figure 3-Functional Partitioning Figure

Figure 4-Flowerline Analysis Figure
Architectural Design
Square Cabin Hospital has a total of 5 nursing units and 518 beds, each nursing unit contains 8 to 10 "ward cabins". Layout is carried out according to the medical procedures of infectious diseases, and the basic divisions are divided into clean areas, restricted areas (semi-clean areas), and isolation areas (semi-polluted areas and polluted areas). Buffer rooms and isolation measures are set up between the corresponding areas.
patients enter the isolation observation ward through the patient corridor for isolation observation. Medical staff set up sanitary entrance rooms and sanitary entrance rooms from the entrances and exits of the polluted area from the cleaning area. Sanitation is divided into inlet and outlet streamlines, and between men and women.
The specific entry process is: cleaning area enters the contaminated area through one dressing (wear work clothes), second dressing (wear protective equipment, wear protective supplies), and buffer zone; the return process is: take off protective clothing, buffer transition room (take off protective clothing and other protective supplies), and return to the cleaning area. After the pollution protection supplies in the undressing buffered area of the observation ward are packaged, they are stored together with the waste generated in the observation ward in the garbage temporary storage room in the observation ward area, and the medical waste from the disposal room is packaged and shipped out directly.
The bathrooms and wash basins used by patients are all set inside a single "ward cabin". Each ward has about 1 finished toilet, 1 shower room and 1 wash basin, respectively, and considering the needs of the elderly, the weak, the sick and the disabled, some finished toilets and shower rooms are equipped with handrails.
This project adopts a modular and standardized design. Boxes, boards or components with the same functions should be versatile and interchangeable. The appearance is neat and beautiful, and its thermal insulation, sound insulation, waterproof, fireproof and other properties meet the requirements of the current national standards and specifications.
The roof takes effective sealing measures to avoid rainwater leakage. The roof is made of waterproof reinforcement measures such as laying waterproof rolls ; the gaps between the boxes should be filled with rubber strips with a width of 5 to 10mm greater than the gap, or other supporting products should be filled with sealed.
A barrier-free ramp is set up at the entrance and exit of the patient; the door for patients has no threshold, which meets the wheelchair access requirements, the width of the patient's access door meets the requirements of the flat bed, and the net width is not less than 1.10m. When designing specific projects, barrier-free facilities comply with the relevant provisions of " Accessibility Design Specification " (GB 50763-2012). All inner windows are not open, and the transfer window has interlocking function. (As shown in Figures 5 to 6)

Figure 5-typical unit floor plan

Figure 6-typical unit streamline analysis diagram
Click to view: [Depin Medical Co., Ltd.] Create a smarter nursing system overall solution for Chinese hospitals
si
structural design
Decheng District Fangcai Hospital is a floor-level prefabricated light steel mechanism system , and the structural design has a service life of 5 years . The above-ground structure adopts a box structure, and the foundation uses raft foundation . The project has a north-south length of 153m and an east-west length of 103m, making it an ultra-long structure.
This project is a temporary disaster prevention building for the response to the new coronavirus pneumonia . The construction period is tight, the time is short and the tasks are heavy. In order to ensure the smooth delivery of the project on schedule, the construction site will directly lay the 250mm gravel cushion layer after the current site is leveled and compacted as the foundation of the building.
Because this project is located in Dezhou, Shandong, according to the experience of the surrounding project, the soil bearing capacity of the site is poor. In order to reduce the impact of uneven site and consider the construction period requirements, and reduce the workload of on-site steel bar processing and support molds, the foundation adopts a 250mm thick raft foundation, and a double-layer bidirectional steel bar mesh is installed, without a post-pouring strip, raft uses C30 early-strength fast hard concrete, and at the same time, the addition of expansion agent, low-hydration hot cement, and strict control of the water-cement ratio and other measures to reduce raft cracking. The superstructure adopts a modular box structure, with a standard module size of 3m×6m×3m, and is assembled on site after the strength of the foundation concrete meets the installation and construction requirements. The box structure and the foundation are connected through embedded parts that are pre-embedded in advance.
water supply and drainage design
water supply system is vertically unzoned and is directly supplied by the municipal water supply pipeline network, with a water supply pressure of 0.20MPa. A backflow preventer is installed before the water supply system in the polluted area is connected; the water supply system in the semi-polluted area and the safety area adopts the municipal direct supply method. The system uses standardized, integrated and highly assembled equipment, pipeline systems and accessories; the equipment adopts integrated bathrooms, integrated shower rooms and other facilities, and reserves a group of extended interfaces and space; the pipeline systems and accessories are preferred to use pipes that are easy to install and disassemble and reusable.
wash basin uses a small volumetric electric water heater (Xiaochubao) to prepare domestic water. The concentrated shower hot water is prepared by an electric water heater.
separate drinking water utensils are set up in the contaminated area and in the cleaning area.
Install purification and sterilization devices at the outlet of the drainage vent pipe of the drainage system in the contaminated area for processing.The air-conditioned condensate water in the polluted area is indirectly drained to the sewage pipes. The drainage of the medical area and the drainage of the ward are discharged into the sewage treatment station for treatment. The secondary biochemical treatment should be used to meet the requirements of the environmental impact assessment report and then discharged into the urban sewage pipeline and sent to the urban sewage treatment plant for further treatment. The sewage inspection well uses a sealed plastic drainage inspection well, and the inspection well should be equipped with an anti-fall net.
sewage treatment facilities are closed, and exhaust gas should be collected, disinfected and discharged after uniform collection. According to the actual conditions on site, the finished septic tank and disinfection tank are made of reinforced concrete. A fire hose reel water supply system is installed inside, which contains a 19mm fire hose reel, a length of 30m, and comes with a vacuum destroyer.
Indoors, according to the serious hazard level Class A fire, the portable ammonium phosphate dry powder fire extinguisher is added. The minimum configuration of a single fire extinguisher is 3A, and the maximum protection distance shall not be greater than 15m. CT, network computer rooms and other areas that are not suitable for water protection are all set up for heptafluoropropane gas fire extinguishing system. Adopt a prefabricated fire extinguishing system of heptafluoropropane.
outdoor fire hydrant Its water source is provided by two municipal water supply channels, and the pipeline network is arranged in a ring shape. Outdoor fire hydrants should be evenly arranged around the building, with the spacing not greater than 120m, the roadside should not be greater than 2m, and the exterior wall or edge of the building should not be less than 5m. Outdoor fire hydrants are arranged on the domestic water supply pipe network according to the distance of no more than 120m.
L
Ventiation and air conditioning design
,
Air conditioning system
1 Health Station
1 Health Station
Hygienic Station isolation point sets heat pump split air conditioning, refrigeration in summer and heating in winter.
2 Square hospital
sets a heat pump split air conditioner, which can be refrigerated in summer and heated in winter. The split air conditioner is equipped with auxiliary electric heating. The condensate in the air-conditioning system cannot be discharged at will. It should be discharged indirectly into the toilet, floor drain or sink drain pipe of the ward bathroom, and should be centrally treated with dirt, sewage and wastewater before being discharged. Some refrigerant pipes are too long and require special treatment. The layout of condensate pipelines should avoid the interconnection of clean areas and semi-polluted areas and polluted areas.
fresh air system uses digital direct expansion fresh air unit .
2,
Ventilation system
1 Health Station ventilation
Health Station isolation point and other major functional rooms have exterior windows, which can be used for natural ventilation. The public bathroom is equipped with a dedicated exhaust shaft and a ventilator with a check device, and a centralized unpowered ventilator is installed on the roof.
2 Square Hospital Ventilation
In order to ensure the orderly flow of airflow, form a reasonable pressure gradient, and avoid cross-infection, this project uses ventilation system design in accordance with the "Code for Building Design of Infectious Disease Hospitals" (GB50849-2014).
clean area design fresh air volume 3 times /h, and semi-polluted areas and polluted areas design fresh air volume 6 times /h.
sets up a mechanical air supply and exhaust system to make the building airflow organization form an orderly pressure gradient from the clean area (doctor's passage) to the semi-polluted area (medical corridor), and then to the polluted area (negative pressure ward). The difference in air supply and exhaust volume maintains the air pressure gradient in each area to prevent infectious air from seeping from the gap from the ward to the cleaning area and outdoors.
negative pressure ward uses airflow tissue that is sent up and discharged from the upper and lower. air supply vent is located in the ward corridor area, with a top air supply vent; 4 lower air exhaust vents with a bottom of 100mm from the ground are each installed on the outside of the bed head of the bed; so that the clean air can first flow through the possible working area of the Chinese medicine personnel in the room, and then flow through the source of infection and enter the air exhaust vent to prevent short circuits of the air supply and exhaust. The lower exhaust outlet at the bottom of the ward bathroom is 100mm away from the ground, which discharges the bathroom odor.
Each ward and clinic air exhaust branch is equipped with a multi-condition air control unit (with its own electric closed air valve), which can be turned off separately to disinfect the room. All air supply and exhaust ports are equipped with a capsule square constant air volume valve to ensure constant air volume in each room.
sets up delivery and exhaust units according to the supply methods of layered and partitions to reduce the ward ventilation operation system, which is conducive to layered and partitioned operation management and reduces operating costs.
All air supply systems are equipped with initial, medium and sub-high efficiency filters in the positive pressure section of blower to ensure clean air supply.
Install a fresh air inlet electrostatic dust removal air purification device at the fresh air inlet (negative pressure section) of the fresh air unit, with the initial resistance ≤ 30Pa. The fresh air inlet type electrostatic dust removal air purification device and the fresh air unit are connected to the joint control, and are turned on and stopped delayed. All exhaust systems in
contaminated and semi-polluted areas are equipped with initial, medium-effect filters and high-efficiency filters in the negative pressure section of exhaust fan , and pipeline-type ozone-free ultraviolet sterilization lamps are installed in the negative pressure section of the exhaust fan to be linked to the exhaust fan. To reduce exhaust air pollution or backflow affects the indoor environment during shutdown.
blower and exhaust fan are both installed outdoors on the first floor. The feeding and exhaust fans are arranged horizontally, and the minimum horizontal distance between the edges of the two should be greater than 20m. When the horizontal distance is less than 20m, the exhaust outlet should be higher than the air inlet and should not be less than 6m. The exhaust port should be no less than 3m higher than the roof, and the air port should be equipped with a conical hood and hood to discharge at high altitude. All delivery and exhaust fans of
use digital energy-saving centrifugal fan chassis. Fan equipment should be purchased for backup equipment so that the equipment failure can be replaced in time.

Electrical and intelligent design
,
Low voltage distribution system
power supply power supply is powered by outdoor box transformer. |
Diesel generator is an emergency power supply for particularly important loads in the primary load, and the power supply time is no less than 24h. |
Intelligent system and other important places are also equipped with an uninterruptible power supply, and the continuous power supply time of the battery pack is not less than 15 minutes.
,
Lighting system
Lighting uses LED light sources, and the color temperature is between 3000K and 4000K. The ward should take measures to prevent the lamp from glareing to bedridden patients. The lighting fixtures in the ward and clean rooms are made of clean and airtight lamps and are installed in the ceiling.
.
Building lightning protection, grounding and security protection
) | square hospitals are equipped with secondary lightning protection buildings, and measures to prevent direct lightning strikes and induction lightning are set respectively; electronic information systems set lightning electromagnetic pulse protection measures according to level D. |
uses metal frames and metal roof as lightning protection devices, and uses electrically penetrated metal frames as the lead-down line; uses a common grounding electrode, and requires that grounding resistance is not greater than 1Ω. |
grounding type uses the TN-S system, and the power cable is repeatedly grounded at the inlet line.
,
Intelligent system
) | Intelligent design of the square hospital mainly includes: integrated wiring system, security prevention system, visual intercom system , information publishing system and other contents. |
Fire alarm system: Use independent fire alarm detector. |

id
logo design
project to make two levels of logo guidance system in the campus and building . The identification guide in the hospital area must clearly point to the location of the "emergency isolation point" and avoid crossing with other people when setting up the patient's medical treatment path; the identification guide in the building must clearly define the name of the room, the cleaning area, the semi-contaminated area, the boundaries of the contaminated area, as well as instructions and regulations for putting on and taking off protective supplies.
Source: "Compilation of Cases for Construction of Case Hospitals in New Coronavirus Pneumonia (version 1.0)"
Zhuyitai, together with industry experts, mainstream medical architectural design institutes, general contractors and various special suppliers in the country, launched the industry's first "Compilation of Cases for Construction of Case Hospitals in New Coronavirus Pneumonia (version 1.0)", covering 31 excellent temporary hospital construction cases in 15 provinces, municipalities and autonomous regions, as well as related construction specifications and excellent supplier products lists, with content exceeding 100,000 words.