After buying a second-hand house, most bathrooms in old houses not only have no partitions, but also no planning. If the layout is unreasonable or looks dirty, they usually want to be renovated. Under normal circumstances, the position of the bathroom in second-hand houses cannot be changed. But the space can be changed. For details, please see the introduction provided by the editor.
Whether the bathroom in a second-hand house needs to be renovated
It is recommended to renovate it, of course it depends on the personal budget.
Many items in a second-hand house have been used by the previous owner. As long as they are not very old, there is actually no need to replace them with new ones. However, for the bathroom, some toilets, showers, basin cabinets, etc. are all items that need to be removed. , it is very necessary to replace it with a new one. Old-fashioned bathrooms not only smell strong and pungent, but may also have problems such as water leakage and unsatisfactory functions. Therefore, when buying a second-hand house, it is very necessary for the owner to renovate and replace the bathroom with a new one.
Can the bathroom be changed when renovating a second-hand house?
The location of the bathroom cannot be changed at will when renovating a second-hand house. It is actually possible to change the space setting of the bathroom, but you should consider whether it can be changed based on the size of your bathroom. As long as it is waterproof and the drainage of the sewer pipes is considered. If the property management does not issue a construction permit, it can require the relevant documents to be produced.
9-day bathroom renovation process
Day 1: ① Start of demolition ② On-site garbage removal
Day 2: ① Construction of water and electricity pipelines ② Drainage protection ③ Wall mortar leveling
Day 3: ① Arrival of wall and floor tiles ② Arrival of sanitary ware
4 days: ① Wall and floor waterproofing construction
Day 5: ① Floor closed water test ② Shower room water blocking site
Day 6: ① Floor closed water test
Day 7: ① Waterproof closed water acceptance ② Acceptance qualified Back floor and wall tiles
Day 8: ① Ceiling installation ② Sanitary ware installation ③ Small hardware installation
Day 9: ① Shower room installation ② Cleaning ③ Finished product protection and exit ④ Completion acceptance
Source: website q2d
Author: Qiangrou
Note: The editor publishes this article mainly to disseminate information and expand information sources for readers. If the editor infringes upon your legal rights, please contact the editor with proof, and the editor will safeguard your legal rights as soon as possible