2022 first-class construction engineer economic gold test site construction drawing budget review content, first-built academic master notes, long press and like + forward + evaluation continue to be updated, click on my avatar on the Wendang version and send a private message to me: 2022
1. Review whether the preparation of the construction drawing budget complies with the current relevant laws, regulations and regulations of the national, industry, and local governments.
2. Review the accuracy of project volume calculation, the consistency between project volume calculation rules and pricing specification rules or quota rules.
3. Review whether various pricing basis is used properly during the preparation of the construction drawing budget, and whether the various rates are calculated correctly; the review basis mainly includes construction drawing design materials, relevant quotas, construction organization design, relevant cost document regulations and technical specifications, regulations, etc.
4. Check whether the market price selection of various factors is reasonable.
5. Review whether the construction drawing budget exceeds the design estimate and conduct deviation analysis.
Filtering and Review Method
"Filtering" is summarized into three unilateral basic indicators: project volume, price, and employment. Advantages: Simple and easy to understand, easy to master,
review speed is fast, easy to find problems. However, the reasons for the problem still need to be reviewed. Applicable: Review residential projects
or projects that do not meet the conditions for comprehensive review.
Key Review Method The advantages are highlighting key points, short review time and good results. Applicable: Large project volume and high cost.