1. Bidding conditions

This bidding project, the installation of elevators in the student dormitories of Xiamen No. 1 Middle School, Haicang Campus (Construction) (re-bidding) (Project name) has been approved by Xiamen Municipal Development and Reform Commission (Name of project approval, approval or filing agency ) Based on the letter from the Xiamen Municipal Development and Reform Commission regarding the project budget for installing elevators in the student dormitories of Xiamen No. 1 Middle School, Haicang Campus, Xiamen Development and Reform Commission approved the construction, Xiamen Development and Reform Society Letter [2021] No. 365 (approval name and number), the construction unit For Fujian Province Xiamen No. 1 Middle School , construction funds come from financial investment and financing projects. The bidder is Fujian Province Xiamen No. 1 Middle School, and the entrusted bidding agent unit is Xiamen Pragmatic Purchasing Co., Ltd. This project has met the bidding conditions, and the construction of the project is now open to public bidding.

2. Project Overview and Bidding Scope

2.1. Project construction location: No. 99 Dongfu South Road, Haicang District;

2.2. Project construction scale: The project mainly includes student dormitories 5#, 6# and 7 of Xiamen No. 1 Middle School Haicang Campus. #Each building in the dormitory building has 2 new elevators, a total of 6 new elevators, with a construction area of ​​750 square meters and an area of ​​100 square meters. Planned building height: 5# 6#38.2m (from outside to the cornice, plus the width of the cornice overhang) 7#33.4m (from outside to the cornice, plus the width of the cornice overhang), fire building height: 5#38.575m (from outside to The average height from the cornice to the ridge) 6#38.713m (the average height from the outside to the cornice and the ridge) 7#33.775m (the average height from the outside to the cornice and the ridge). Among them, 5# 6#: tenth floor, 7#: nine floors. 5# 6#: The first floor is 4.8 meters high, the second floor is 4.5 meters high, and the third to tenth floors are 3.3 meters high. 7#: The first floor is 4.5 meters high, and the second to ninth floors are 3.3 meters high. The total investment estimate of the project is 12.0074 million yuan, including 7.29693647 yuan in civil construction costs. ;

2.3. Tender scope and content:

(1) Project category: House construction;

(2) Tender type: general contracting ;

(3) Tender scope and content: Main construction content Xiamen No. 1 Middle School Haicang Campus Each of the student dormitories 5#, 6#, and 7# has 2 new elevators, for a total of 6 new elevators. For details, please refer to the design drawings and bill of quantities; among them, the relevant data used to determine the qualifications and levels of the enterprise: the building area is 750 square meters, and the number of building floors: nine to ten floors above ground. 5# 6#: tenth floor, 7#: nine floors. 5# 6#: The first floor is 4.8 meters high, the second floor is 4.5 meters high, and the third to tenth floors are 3.3 meters high. 7#: The first floor is 4.5 meters high, and the second to ninth floors are 3.3 meters high. Planned building height: 5# 6#38.2m (from outside to the cornice, plus the width of the cornice overhang) 7#33.4m (from outside to the cornice, plus the width of the cornice overhang), fire building height: 5#38.575m (from outside to The average height from the cornice to the ridge) 6#38.713m (the average height from the outside to the cornice and the ridge) 7#33.775m (the average height from the outside to the cornice and the ridge). The individual budget is 7.29693647 yuan. , among which, this bidding project does not apply building information model (BIM) technology [the investment approval of fiscal investment and financing bidding projects or the investment plan of state-owned self-financing bidding projects should include building information model (BIM) technology costs Application];

Among them, the relevant data used to determine the qualifications and grades of enterprises: / (Characteristic descriptions stipulated in the corresponding grades in the scope of contracted projects in accordance with the "Construction Industry Enterprise Qualification Standards");

Related data used to determine the grade of registered construction engineers Data: / (according to the characteristic description stipulated in the corresponding scale standards in the "Registered Construction Engineers' Professional Project Scale Standards (Trial)");

Relevant data used to determine the performance of similar projects: / (according to the "Fujian Province Housing Construction and Municipal Infrastructure The description of project characteristic indicators specified in the "Project Specialty Classification Standard (Trial)" is applicable to projects that are allowed to set similar project performance);

2.4. bidding control price (i.e. maximum bid limit price , the same below): Bidding deadline is announced 5 days before. For bidding projects that apply Building Information Modeling (BIM) technology, the BIM technology application fee will be released together;

2.5. Construction period requirements: the total construction period is 50 calendar days, and the quota construction period is /calendar day (applicable to the country or our province) Projects with specified construction period); The construction period requirements of each key node are (if any) /;

2.6. Bid section division (if any): 1 bid section;

2.7. Quality requirements: Qualified.

3. Bidder qualification requirements and review methods

3.1. This bidding project requires bidders to have a valid general contracting qualification of no less than level three construction projects and a "Construction Enterprise Safety Production License". (Projects that do not require qualifications are subject to the regulations)

3.2. The bidder who intends to serve as the project leader (i.e. project manager, the same below) of this bidding project must have a valid professional qualification of no less than a registered construction engineer in the second level of construction engineering. , and have a valid safety production assessment certificate (B certificate). (Projects that do not require qualifications are subject to its regulations)

3.3. The bidder's credit evaluation results for the Xiamen Municipal Construction Bureau's construction of market credit supervision system are: The credit evaluation grade for 2022 is / level. If a consortium bid is formed in accordance with Item 13, Item 3.1 of the Attachment to the Instructions for Bidding, the comprehensive credit evaluation rating of the consortium bidder shall be determined in accordance with Item 3.1, Item 13 of the Attachment to the Instructions for Bidding; Item 3.2 If a consortium is formed to bid, the enterprise with the lowest comprehensive credit rating among the consortium members shall determine the comprehensive credit rating of the consortium bidder.

3.4. Consortium bidding:

3.4.1 According to the "Xiamen Municipal Construction Bureau's Notice on Measures to Promote Revenue and Performance of Enterprises in the Construction Industry Investment Promotion" (Xiamen Construction [2021] No. 138), this bidding project allows non-local A registered construction enterprise and its subsidiaries registered in Xiamen [wholly owned or controlled by the enterprise (holding refers to a shareholding ratio of more than 50%)] or associated enterprises registered in Xiamen [associated enterprises refer to the enterprise ultimately owned by the same group ( company) (holding refers to holding a shareholding ratio of more than 50%)], a consortium undertaking the same contracting content is formed to participate in the bidding. If a consortium of professional units undertaking the same contracting content forms a consortium, the unit with a lower qualification level shall be selected. Determine qualification level. Among them:

(1) The consortium agreement should clearly indicate that the above-mentioned subsidiary or affiliated enterprise shall be the leader of the consortium.

(2) The consortium agreement should make it clear that the performance and credit of the consortium bidder shall be based on the performance and credit of the consortium leader or the remaining members of the consortium. The aforementioned performance refers to the performance of similar projects in the bidder's qualification requirements (referred to as "enterprise performance", the same below) and the similar project performance of the project leader required by the bid evaluation method (referred to as "personnel performance", the same below), and credit refers to the bidder's performance. Among the qualification requirements are the credit evaluation results of the construction market credit supervision system of the Xiamen Municipal Construction Bureau and the comprehensive credit evaluation scores of construction enterprises in Fujian Province (combined and referred to as "credit", the same below).

If the consortium agreement is not specified in accordance with the above requirements, the performance and credit of the consortium bidder shall be based on the performance and credit of the consortium members with corporate performance; if the consortium agreement is not specified in accordance with the above requirements and each consortium If all parties to the consortium have provided performance that meets the requirements of the bidding documents, the performance and credit of the consortium bidder shall be based on the performance and credit of the consortium leader.

(3) The consortium bidder shall submit in the bidding documents evidence of the parent-subsidiary or affiliated enterprise relationship between the parties to the consortium.

3.4.2 This bidding project does not accept consortium bids other than those in 3.4.1. If the tenderer accepts a consortium bid, / shall be the leader of the voluntary consortium. The number of consortium bidder members shall not exceed /, and each party shall have the corresponding qualifications and conditions for the contract content of the bidding project it undertakes; If the professional units contracting the content form a consortium, the qualification level shall be determined according to the unit with the lower qualification level.

3.5. This bidding project applies the comprehensive credit evaluation score of construction enterprises in Fujian Province. For projects that apply the comprehensive credit evaluation scores of construction companies in Fujian Province, the bidder's corporate quarterly credit score is in the housing construction category.If the comprehensive credit evaluation score of construction enterprises in Fujian Province is applied, the bidder's corporate quarterly credit score shall not be less than 60 points; if a consortium bid is formed in accordance with Item 13, Clause 3.1 of the Appendix to the Bidding Instructions, the bidder's corporate quarterly credit score shall be based on the Appendix of the Bidding Instructions. Item 13, Article 3.1, stipulates that the enterprise quarterly credit score of the consortium bidder shall be determined; if a consortium bid is formed in accordance with Article 3.2, Item 13, of the Appendix to the Bidding Instructions, the enterprise quarterly credit score of the consortium bidder shall be based on the construction project Construction general contracting qualifications are determined by the lowest enterprise quarterly credit score among consortium members. The bidder's corporate quarterly credit score can be queried through the Fujian Provincial Construction Enterprise Credit Comprehensive Evaluation System (log in from the "Fujian Provincial Housing and Urban-Rural Construction Comprehensive Supervision Service Platform" on the Fujian Housing and Urban-Rural Development Network).

3.6. Requirements for bidders' "similar project performance": /; "similar project performance" refers to: within the five years preceding the date when this bidding project was published in the legal media (including the date when this bidding project was published in the legal media) The date of announcement) is completed and has passed the completion acceptance/.

3.7. Each bidder can bid for / (specific number) of the above-mentioned bids in this bidding project, but a maximum of / (specific number) bids are allowed to be successful. (Applicable to bidding projects in sub-bidding sections)

3.8. Other qualification requirements: None.

3.9. This bidding project uses the post-qualification review method to review the qualifications of the bidders.

3.10. This bidding project does not require bidders to pay a wage deposit for migrant workers during the bidding period.

3.11. This bidding project does not require the winning bidder to establish a branch (subsidiary) in the project location. The winning bidder shall perform tax obligations in accordance with the law.

4. Obtaining bidding documents

Anyone who is interested in participating in the bidding, please use the Xiamen construction project electronic bidding trading platform (website) from 2022-07-13 12:00:00 to 2022-07-25 23:59:00 : http://117.25.161.110:7070/xmjy/login) (Name and URL of the public resource electronic trading platform) Free download of electronic bidding documents and other related information in an anonymous manner. The electronic bidding documents of this bidding project are opened using the electronic signature system (version: V3.6.4 and above) (name and version number of the electronic bidding document preparation tool software). After obtaining the bidding documents, the bidder should check the legality and validity of the bidding documents. Legal and valid bidding documents should have the electronic seal of the bidder and the bidding agency; if the bidder does not have an electronic seal, it must be accompanied by the bidder's authorization of the bidding agency. Book.

5. Bid evaluation method

The bid evaluation method used in this bidding project: Simple bid evaluation method.

6. Submission of bid deposit

6.1. Time for submission of bid deposit: before the bid deadline.

6.2. The amount of bid deposit submitted: 100,000 yuan.

6.3. How to submit the bid deposit: For details, please refer to the attached table before bidding instructions.

7. Submission of bid documents

7.1. The deadline for submission of bid documents (bidding deadline, the same below): 2022-07-26 10:15:00. Bidders should pass the Xiamen Construction Engineering Electronic Bidding before the deadline. The bidding trading platform submits electronic bidding documents;

7.2. The public resources electronic trading platform will reject bid documents that are delivered after the due date.

8. The medium for publishing the announcement is

. This bidding announcement is also on the China Bidding and Tendering Public Service Platform (http://www.cebpubservice.com/), the Fujian Provincial Public Resources Transaction Electronic Public Service Platform (ggzyfw.fj.gov.cn, Published on ggzyfw.fujian.gov.cn) and Xiamen Public Resource Trading Network (http://zyjy.as.xm.gov.cn/).

9. Contact information

Tenderer: Xiamen No. 1 Middle School, Fujian Province

Address: No. 93, Wenyuan Road, Siming District, Xiamen

Contact person: Tian Peng

Tendering agency: Xiamen Pragmatic Purchasing Co., Ltd.

Address: Xiamen Si Unit 702, Building 1, Bus Building, No. 221-1, Lianyue Road, Ming District