I joined the hotel project department of xxx Development Co., Ltd. on March 11, 2014. It has been more than ten months. As an on-site representative of the real estate developer, I am mainly responsible for the management of water, electricity, fire protection, gas, water supply, power supply, lighting, and decoration on the project. Under the strong leadership of the company leaders and the assistance of relevant colleagues, the work was completed very smoothly, and the relevant management work was relatively in place. Here is a summary of this year's work:
1. Study humbly, work hard, and successfully complete the task!
(1) At the beginning of 2014, it started with the decoration of the sales department and began to integrate into the role of the engineering department. Since it was once Mainly engaged in the supervision of water and electricity for a long time; I am still very lacking in decoration management. However, with the assistance of engineering department manager and the person in charge of the decoration unit, I finally found the entry point and grasped the key points of the work (selection of decoration materials and construction technology in place) and difficulties (decoration safety and project progress). In early September, the overall decoration of the sales department was successfully completed. Basically, the decoration style met the design requirements, but there were some unsatisfactory aspects. The main work contents of
(2) in 2014 include: successfully completing the decoration of the sales department and office; completing the factory pricing of main water and electricity materials and purchasing some materials for buildings 1# to 5# according to the project progress; completing the decoration of the elevator front room and entrance lobby of building 1#2#; completing the outdoor lighting project construction of building 1#2#; completing the installation of one household and one meter for electricity in building 1#2#, and solving the problem of public utility in building 1#2#. Electricity problem; completed the regional water supply in Building 1#2#, installed the basement non-negative pressure (medium pressure) water supply equipment ; completed the indoor water and electricity project in Building 1#2#; completed the indoor gas supporting facilities in Building 1#2#; completed the acceptance of the fire protection project in Building 1#2#, and completed the acceptance of the fire protection project in Building 3#4#5# Installation of basement sprinklers and fire hydrants; assist in completing other tasks assigned by company leaders (such as signboard production, house number security, anti-collision strip production, etc.).
(3) Since I stepped into the xxx ·xxxx project, in line with my usual style of doing things, I always keep in mind the saving of project costs and , and actively cooperate with various business arrangements arranged by the company. Work hard in the workplace and not be afraid of difficulties; unites colleagues, is willing to help others, has an inclusive mentality, and actively integrates into the work of the company team; starts from small things, is meticulous, and does his best to be satisfied until he is satisfied, and can set a good example. The key to all work is persistence, implementation, and proactive completion of various tasks assigned by leaders. I have played my due role in my position, I am worthy of this job, and I am worthy of my colleagues and leaders who care about me.
2. Main experience and gains
After working in this position for nearly a year, I have completed some work and achieved certain results. In summary, I have the following experiences and gains:
(1) Only by correcting your position can you work better; always keep in mind that as an on-site representative of real estate development company stationed at the construction site, you are directly under the command of the Minister of Engineering, and you must complete the tasks assigned by Minister He of the Engineering Department to the letter. Success, have the courage to report difficulties encountered to leaders, and jointly negotiate reasonable solutions to solve them.
(2) Only by actively integrating into the group can we work better. We must unite colleagues and have the courage to help others. I have also assisted colleagues in the company to complete some non-professional tasks on many occasions. It is my consistent aim to make everyone feel friendly. Only by doing things first and being a good person with high quality can we establish a good reputation within a group and create a harmonious small group.
(3) Only by adhering to principles and implementing company systems will you be able to perform with ease in the work process. In the past year, there has been basically no case of arriving late or leaving early, let alone being absent from work.Now that I have come to this job, I must determine my own code of conduct in accordance with the company's relevant systems. This is inseparable from my many years of work experience. Because I have become accustomed to this state, many colleagues do not understand me. In fact, the same principle applies to colleagues and the company. Colleagues are my brothers and sisters, and the company is a warm home.
(4) Only by establishing a sense of service and strengthening communication and coordination can we complete the work better. Every time the company leader assigns a task, we will do our best to complete it. Being able to share the leaders' worries and solve their problems is the minimum criterion we should have as employees. As the link between the company and the construction unit, our service awareness plays a vital role. Under the premise of taking national regulations and company interests as the guide, we will solve problems for construction units, make suggestions, and solve some actual cases on the construction site to achieve a win-win situation.
3. Care about your job and perform your duties conscientiously
(1) After such an intense and orderly year, I feel that my work has reached a new level and I have integrated into this group step by step. I am grateful to my colleagues in the company for their support and the company leaders’ love, which makes me more and more confident in the work ahead. In the cold weather, I believe that after a year of running-in, the communication barriers with various construction units have basically been cleared. I also have a tacit understanding with my colleagues and can successfully complete the tasks assigned by the company leaders.
(2) now reports the main work achievements of this year as follows:
1. In line with optimizing the plan, saving project costs, and implementing work experience into specific details is the main purpose of my coming to this project. First, optimize the drainage system of the bathroom on the same floor. According to the design requirements, each bathroom will cost more than 200 yuan; the use of silencer spiral pipes to cancel the double riser sewage system, one system can save more than 10,000 yuan in materials and labor; indoor lighting lines The street light wires were changed from three-core to two-core wires, saving more than 200 yuan in materials and labor per household. It is recommended to use energy-saving LED light sources for all outdoor lighting work and use timer control, which saves both electricity bills and labor management costs.
2. Provide reasonable solutions to solve related problems encountered during construction. After learning that the basement of Building 4# could not be completed ahead of schedule, it was impossible to carry out the construction work of the high-end room special transformer . With the assistance of the construction unit, a reasonable power supply plan was adopted to ensure the smooth operation of power and public power in Buildings 1#2#. Temporarily installed fire water tank on the roof of building 4#, and temporarily led the pipe to the roof, ensuring the smooth acceptance of the fire protection project of building 1#2#.
3. Assist colleagues to solve project-related problems. Regarding the overload of the street lamps constructed by the landscaping unit, which caused multiple trips and insurance burnouts, we went to the site to analyze the reasons and issued a reasonable solution, which was to divide the control into multiple loops to ensure that the three-phase balance of and met the requirements. This was unanimously praised by Zhang Gong from the Engineering Department and the garden construction workers. Assisted Engineer Yang from the Engineering Department to complete the construction leveling work of the basement equipment room, and accompanied Engineer Yang to the site for guidance.
(3) Summary: In this year's work, I came into contact with many new things, created many new problems, and encountered many problems. They were implemented and solved one by one during the work. The specific things are implemented as follows:
1. When I first came, I was not familiar with the company's processes. In line with the determination to save costs for the company, I began to propose optimization plans in March: the drainage system on the same floor adopts universal specifications, reduces one ventilation pipe, and changes the lighting circuit. The three-core lamp cord was changed to two-core. When I proposed it, no one supported it, and some people thought I was trying to show off my abilities. The construction company, the supervisor, and the relevant personnel of the company all disagreed with my plan. Even my old colleagues called me and asked me to be more cautious in handling the matter. However, I did not back down. I presented the facts and reasoned. I led a team of people from the company to Xiangtan to inspect and analyze the relevant issues for everyone. principles and advanced technology, so as to gain everyone's consent and understanding; finally, I went to Xiangtan Design Institute for filing and explanation, and at the same time provided them with the engineering drawings I had done before for review. While gaining understanding, they also agreed with my approach; finally, the design institute issued design changes to solve all the concerns everyone had, but the approval time has already arrived in June.
2. When they learned that the high-end distribution room in Building 4# would not be able to operate normally at the end of the year, the construction unit was a little discouraged. If we separately pull two lines from the 630KVA transformer to Building 1#2# to ensure power and public lighting, it would cost tens of thousands of yuan in cables and labor. At the same time, the construction party asked us to get a visa for processing, and there are no redundant pre-embedded wire conduits. The company leaders asked us to solve the difficulties without increasing costs. I went to the site for inspection and checked the construction drawings. At the same time, I negotiated with the construction party on the solution. At the same time, I came up with a solution that did not increase the cost of the construction party to solve the problem of public lighting and power supply for Building 1#2#. That is to make reasonable use of the commercial meters we have installed in shopping malls and sales departments, and negotiate with the Electric Power Design Institute and the power supply department to solve the timely use plan. It has been running normally for more than a month now and can basically meet the relevant requirements.
3. The installation of the outdoor roof signboard took a lot of effort. The construction environment of Building 1#2# was relatively poor. At the same time, the civil construction unit was in the finishing stage. The transportation of materials, the erection and rectification of the steel frame required multi-faceted coordination. Especially for safety issues, the construction unit was required to wear safety belts. Now the effect at night basically meets the design requirements. The real-life lighting effect at night is sent to QQ space and has been praised by many people. There are many things that
(4) manages, so there are inevitably some shortcomings, but I am still full of confidence in getting the approval of the company leaders; one thing I have always been worried about is that the gas construction operation monopolizes the industry and the construction progress cannot be controlled. The follow-up work must be made up during the construction after the year.
Four, xxxx year work plan and arrangement
(1) A new year, a new beginning, I will work hard under the guidance of the company's leaders, dig deep into the potential, and do a good job in temporary water and electricity management on the construction site. There are indeed some shortcomings in the past year, and there are still some unsatisfactory places. This year as The focus is to strengthen the temporary water and electricity management at the construction site, so that no small details are missed, and the incoming and outgoing bills are clear, so that company leaders can directly understand the first-hand information of the construction site, and make the temporary water and electricity management transparent and standardized. The civil infrastructure construction of
(two)6#7# building has started in the next few years. I will mainly follow up on these matters in the following days. I will go to the site with the supervisor Liao Gong to conduct quality and safety inspections, especially to provide high-quality on-site office services for the construction unit. Go to the construction site at least twice a day to inspect the work and try to nip problems in the bud. Solve various related issues raised by the construction unit in a timely manner, manage one thing with full responsibility, and devote yourself wholeheartedly to the work of civil engineering pre-embedding.Put forward rational suggestions for water and electricity pre-embedding work to minimize losses and reduce project cost considerations.
(three) The decoration of the entrance lobby and elevator front room of Building 3#4#5#; the decoration of Building 1# model room; the decoration of fashionable business hotel is also the focus of my work. I mainly cooperate with the designer to select materials and find out the prices of materials in the market. We must achieve the purchasing purpose of and compare with others without losing money. ; Strictly follow the "Quality Acceptance Code for Building Decoration and Decoration Projects" (GB50210- 2001) to strengthen supervision; strengthen safety management, especially fire and theft prevention requirements; cooperate with designers to complete the design work of business hotels and preparatory work for the hotel, so as to spend the least money and accomplish more things. The construction of weak current in the
(four) community is also a project that affects the owner's construction function and is related to the taste and grade of the community. I will work with the weak current unit to systematically plan the overall layout and modify the areas that were not perfected in the early stage. Especially for projects that require repeated rectification, we will try to reduce the cost to the minimum and implement the content in accordance with the contract requirements. The weak current system is relatively complex. Since there are no complete design drawings, it is difficult to supervise. However, I will take reasonable measures and refer to the same requirements of Xiangtan City higher-grade real estate for layout, so as not to fall behind and make up for the design deficiencies.
(5) I will do my best to assist colleagues in the company to complete other tasks that require cooperation. We can also discuss technical issues in power supply, water supply, and elevators. I can also make suggestions for water and electricity optimization in landscaping to make up for some defects that occurred in the early stage. I will also handle matters related to water, electricity, and equipment pre-embedding during the civil construction process. Achieve unity and assistance among colleagues, and work together to create a high-quality commercial and residential community.
Conclusion:
has been working for nearly a year. Although I have improved my communication skills at work, enriched some professional knowledge, and accumulated some work experience, I still have to improve my understanding in future work, cultivate my communication skills, and use my professional knowledge and work experience to do my best for the development of the company. I hope that the company leaders will give me more understanding and greater support, and contribute to the completion of the xxx ·xxx project