National Highway G234 Shexian html Section 4 (including ring road) commercial toll road project winning bid
Project Overview
1. Project Overview:
The main line of the project starts from the south of Pandian Township, Pingshe Highway, intersects with the original Pingshe Highway, starting at pile number K0+000, the route crosses the Handan Chang Railway to the east, passes through Nanzhai Village, and intersects with National Highway G309 in the north of Baiyuling Village, and rebuilds 5.3 kilometers to the southwest. Through Jingdian Town, it deviates from National Highway G309 in the north of Gengle Town, , and passes through Qinglan Expressway, through Zhaogang Village, Zhai The route of Shangcun East and Shangqian Qingzhang River turns to the southeast, passes through the east of Ci Village, the east of Zhuang Shang Village, and the east of Huyu Village, and is newly built along the north bank of Qingzhang River, passing through the north of Lianquan Village, north of Linwang Village, Xida Town, and north of Dongda Village, and crosses the Qingzhang River again in the north of Taizhuang Village, passing through Taizhuang Village, west of Hezhang Village, west of Huanglongkou Village, and west of Baiqi Village, finally Baipan Bridge connects with the Henan section, with the end point number K58+395.496, and the total length of the main line of is 58.395 kilometers and (of which the remodeled section is 5.3 kilometers long and the newly built section is 53.095 kilometers long). The branch line starts from the interchange of Zi Village, with the starting point pile number ZK0+000. It goes south through the newly built Qinglan Expressway double line, spans the existing Qinglan Expressway, and finally reaches the east of Chunshuling Village, connecting with National Highway G309, with the end point pile number ZK3+722.525, and the total length of the branch line is 3.723 kilometers.
2. Section division:
3. Planned construction period: LJ9 and LJ12 sections planned construction period 18 months, and other sections planned construction period 15 months. Defect liability period is 2 years.
National Highway G234 Shexian html Section 4 (including ring road) commercial toll road project winning bid
Project Overview
1. Project Overview:
The main line of the project starts from the south of Pandian Township, Pingshe Highway, intersects with the original Pingshe Highway, starting at pile number K0+000, the route crosses the Handan Chang Railway to the east, passes through Nanzhai Village, and intersects with National Highway G309 in the north of Baiyuling Village, and rebuilds 5.3 kilometers to the southwest. Through Jingdian Town, it deviates from National Highway G309 in the north of Gengle Town, , and passes through Qinglan Expressway, through Zhaogang Village, Zhai The route of Shangcun East and Shangqian Qingzhang River turns to the southeast, passes through the east of Ci Village, the east of Zhuang Shang Village, and the east of Huyu Village, and is newly built along the north bank of Qingzhang River, passing through the north of Lianquan Village, north of Linwang Village, Xida Town, and north of Dongda Village, and crosses the Qingzhang River again in the north of Taizhuang Village, passing through Taizhuang Village, west of Hezhang Village, west of Huanglongkou Village, and west of Baiqi Village, finally Baipan Bridge connects with the Henan section, with the end point number K58+395.496, and the total length of the main line of is 58.395 kilometers and (of which the remodeled section is 5.3 kilometers long and the newly built section is 53.095 kilometers long). The branch line starts from the interchange of Zi Village, with the starting point pile number ZK0+000. It goes south through the newly built Qinglan Expressway double line, spans the existing Qinglan Expressway, and finally reaches the east of Chunshuling Village, connecting with National Highway G309, with the end point pile number ZK3+722.525, and the total length of the branch line is 3.723 kilometers.
2. Section division:
3. Planned construction period: LJ9 and LJ12 sections planned construction period 18 months, and other sections planned construction period 15 months. Defect liability period is 2 years.
Winning Information
LJ1
First place:
Hebei Xiangda Road and Bridge Engineering Co., Ltd.
Bidding Quotation: 88211624.02 yuan
Second place:
Jiangxi Tianfeng Construction Group Co., Ltd.
Bidding Quotation: 89881455.46 yuan
Third place:
Bidding Quotation: 89881455.46 yuan
Third place:
Changchun Municipal Construction (Group) Co., Ltd.
Bidding Quotation: 90732605 yuan
LJ2
First place:
Hebei Guangtai Road Bridge Engineering Group Co., Ltd.
Bidding Quotation: 116266697.48 yuan
Second place:
chengde Road Bridge Construction General Company
bid quotation: 116315304.47 yuan
third place:
Zhongjiao No. 4 Highway Engineering Bureau Co., Ltd.
bid quotation: 116359865.41 yuan
LJ3
first place:
Zhejiang Zhengfang Transportation Construction Co., Ltd.
bid quotation: 207068789.71 yuan
0 second place:
Yueyang Highway and Bridge Infrastructure Corporation
Bidding Quotation: 207142877.55 yuan
Third place:
Guangdong Guanyue Road and Bridge Co., Ltd.
Bidding Quotation: 207173122.4 yuan
LJ4
First place:
Tianjin Xin Road and Bridge Construction Engineering Co., Ltd.
Bidding Quotation: 89215305.39 yuan
Second place:
Tianjin Chengjiandao Bridge Engineering Co., Ltd.
Bidding Quotation: 89592511.5 yuan
Third place:
Longjian Road Bridge Co., Ltd.
Bidding Quotation: 89837390.25 yuan html l2
LJ5
First place:
Zhejiang Quzhou Transportation Construction Group Co., Ltd.
Bidding quotation: 84371210.13 yuan
Second place:
Jiangxi Zhongxin Road Bridge Group Co., Ltd.
Bidding quotation: 84413648.05 yuan
Third place:
Tianjin Second City Zheng Highway Engineering Co., Ltd.
Bidding Quotation: 84494057.1 yuan
LJ6
First place:
Hebei Construction Group Co., Ltd.
Bidding Quotation: 159518225.93 yuan
Second place:
Detong Construction Group Co., Ltd.
Bidding Quotation: 15956412 1.71 yuan
third place:
Shaanxi Jitai Group Road and Bridge Co., Ltd.
Bidding quotation: 159763974.95 yuan
LJ7
first place:
Jiangxi Zhongmei Construction Group Co., Ltd.
Bidding quotation: 115508897.7 yuan
second place:
Jiangxi Modern Road and Bridge Engineering Group Co., Ltd.
Bidding Quotation: 115865822.73 yuan
Third place:
Weinan Huatong Road and Bridge Engineering Co., Ltd.
Bidding Quotation: 115922331.28 yuan
LJ8
First place:
Heilongjiang Longjian Road and Bridge Fourth Engineering Co., Ltd.
Bidding Quotation Bid quotation: 105348979.32 yuan
second place:
Sichuan Road and Bridge Engineering Co., Ltd.
Bid quotation: 106073532.84 yuan
third place:
Jiangsu Transportation Engineering Group Co., Ltd.
Bid quotation: 106100014.77 yuan
LJ9
html l5 first place:
China Railway Tunnel Engineering Bureau Co., Ltd.
bid quotation: 429120156 yuan
second place:
China Railway Second Highway Engineering Bureau Co., Ltd.
bid quotation: 429579450 yuan
third place:
China Railway Twenty-three Bureau Group Co., Ltd.
bid quotation:
China Railway Twenty-three Bureau Group Co., Ltd.
bid quotation: 429856798 yuan
LJ10
first place:
Yichun Tongda Road and Bridge Construction Co., Ltd.
Bidding quotation: 98675102 yuan
second place:
Zhongjiao Second Public Bureau Sixth Engineering Co., Ltd.
Bidding quotation: 104307779.8 yuan
third place:
Fujian Jintong Construction Group Co., Ltd.
Bidding quotation: 105957595 yuan
LJ11
First place:
baoding Shencheng Road and Bridge Co., Ltd.
Bidding quotation: 135801146.41 yuan
Second place:
cangzhou Road and Bridge Engineering Company
Bidding quotation: 135801146.41 yuan
Second place:
cangzhou Road and Bridge Engineering Company
Bidding quotation: 13 6049378.7 yuan
third place:
Zhejiang Shuntong Road Bridge Engineering Co., Ltd.
Bidding quotation: 137200635.99 yuan
LJ12
first place:
Zhongjian Road Bridge Group Co., Ltd.
Bidding quotation: 126561171.54 yuan
second place:
Guizhou Highway Engineering Group Co., Ltd.
Bidding quotation: 126648000.83 yuan
Third place:
Guangxi Road and Bridge Engineering Group Co., Ltd.
Bidding quotation: 126698497.58 yuan
LJ13
First place:
Hebei Guangtong Road and Bridge Group Co., Ltd.
Bidding quotation:
HEbei Guangtong Road and Bridge Group Co., Ltd.
Bidding quotation : 149892359 yuan
second place:
Yulin Changsheng Group Road and Bridge Engineering Construction Co., Ltd.
Bidding quotation: 162216835 yuan
Third place:
Henan Yutong Shengding Engineering Construction Co., Ltd.
Bidding quotation: 163231661 yuan
Public announcement date: 2018/8/27 8:30:00-2018/8/29 17:30:00
Source: Hebei Provincial Transportation Network
Website:
http://www.hbsjtt.gov.cn/index.html