The professional qualifications of the second-level construction engineer are subject to a unified national syllabus, and each province, autonomous region, and municipality directly sets the topic and organizes the examination system. At the same time, candidates can also choose

2024/05/0605:37:36 hotcomm 1145

The professional qualification of the second-level construction engineer follows a unified national syllabus, and each province, autonomous region, and municipality directly sets the topic and organizes the examination system. At the same time, candidates can also choose to take the national unified examination for the professional qualification of second-level construction engineers. The national unified examination will organize the questions and examinations uniformly by the state. Persons who have obtained the construction engineer's professional qualification certificate and meet the registration conditions will obtain the second-level construction engineer registration certificate and practice seal after registration. Only registered construction engineers can be employed to practice.

The professional qualifications of the second-level construction engineer are subject to a unified national syllabus, and each province, autonomous region, and municipality directly sets the topic and organizes the examination system. At the same time, candidates can also choose  - DayDayNews

Therefore, for those engaged in the engineering industry, the Level 2 Construction Engineer Certificate is essential. Below we have found 100 more classic questions for the second construction law subjects. You can find your own shortcomings through the connections between these exercises. Due to limited space, not all answers and explanations have been written. Those who want the full version can follow and send me a private message to get it. Follow Xiao Zhang and share more exam tips! Okay, without further ado, let’s get to the topic!

The professional qualifications of the second-level construction engineer are subject to a unified national syllabus, and each province, autonomous region, and municipality directly sets the topic and organizes the examination system. At the same time, candidates can also choose  - DayDayNews

1. Multiple choice question

1. Among the following statements about the effectiveness of laws and regulations, which one is incorrect ().

A. The effectiveness of laws is greater than that of administrative regulations

B. The effectiveness of local regulations is greater than that of local government regulations

C. Under normal circumstances, new laws on the same matter take precedence over old laws

D. The effectiveness of administrative regulations is greater than that of local regulations

2. Regarding construction activities In terms of civil and commercial legal relations, the correct statement is ().

A. Civil and commercial legal relationships in construction activities are not relationships between equal subjects

B. Civil and commercial relationships in construction activities are mainly non-property relationships

C. Punitive liability is the main form of liability in civil and commercial relationships in construction activities

D. In construction activities, the contractual relationship between the construction unit and the construction enterprise belongs to the civil and commercial legal relationship

3. According to the "General Principles of Civil Law", the classification of legal persons in China does not include ().

A. For-profit legal person B. Non-profit legal person

C. Corporate legal person D. Special legal person

4. The following are special legal persons ( ).

A. Public institutions B. Social groups C. Social service agencies D. Community neighborhood committees

5. Regarding agency, the correct statement is ( ).

A. For subagency with the consent of the principal, the agent will no longer bear the responsibility

B. If there are several agents for the same agency matter, the leader should be selected

C. If the legal person or unincorporated organization as the principal is terminated, the entrusted agency shall be terminated

D . The apparent agent has the right to act as an agent for

6. A general contractor subcontracts the construction of the main structure of the project to a subcontracting unit with corresponding qualifications. During the construction of this project, a safety accident occurred at the subcontracting unit. Regarding the statement about the responsibilities of both parties, the incorrect statement is ().

A. The general contractor shall bear overall responsibility for the safety production at the construction site of the project.

B. The general contractor and the subcontracting unit shall bear joint and several liability for the safety accident.

C. If the safety accident is particularly serious and constitutes a crime, the general contractor shall be held accountable. Responsibilities of the main responsible person of the unit

D. Subcontracting units only bear civil liability

7. Regarding property rights, the correct statement is ().

A. The security right holder and the owner of the same property shall be the same person

B. The usufruct holder may be the owner of the property

C. Without the consent of the rural land contractor, the land owner shall not establish a site on the land. Easement

D. The change of property rights can only be based on the contractual relationship

8. The two units of A and B are adjacent. A needs to enter and exit through B's factory road. A and B agree that A pays a certain fee to B. The rights enjoyed by A in this agreement are ( ).

A. Land contract management rights B. Easements C. Land use rights D. Land ownership

9. According to the "Construction Project Quality Management Regulations", the construction unit shall inspect building materials, building components, equipment and commercial concrete. The following practices are not in compliance with the regulations ( ).

A. If it has not been inspected, it shall not be used in engineering.

B. If the inspection fails, it should be re-inspected until it is qualified.

C. The inspection must be recorded in writing in the prescribed format.

D. The inspection must be signed by relevant professionals.

10. About debt The correct statement is ().

A. The content of the debt is the rights and obligations between the subjects of the debt.

B. The creditor is specific, and the debtor is not specific.

C. The creditor's right is the right of the obligee to request the obligor to perform certain actions.

D. The object of the debt is relative.

11. The following Regarding the prevention and control of air pollution, the correct statement is ().

A. The construction site should install online monitoring and video surveillance equipment and be connected to the relevant local authorities.

B. When the ambient air quality index reaches severe pollution, the construction site should increase the frequency of water sprinkling.

C. The height of the closed enclosure of major road sections within the city It should not be less than 2.2m

D. The ground of the main roads and material processing areas at the construction site should be hardened

12. Regarding the scope of patent protection for construction projects, the correct statement is ().

A. For utility models, the instructions attached to the application shall prevail.

B. For construction engineering inventions, the drawings shall prevail.

C. For appearance designs, the appearance design of the product in pictures or photos shall prevail.

D. All three types of patents shall be subject to claims. The content shall prevail

The professional qualifications of the second-level construction engineer are subject to a unified national syllabus, and each province, autonomous region, and municipality directly sets the topic and organizes the examination system. At the same time, candidates can also choose  - DayDayNews

13. The "Patent Law" protects the patent rights of inventions and creations. In this regard, the following statement is correct ( ).

A. Inventions refer to inventions, utility models and designs

B. The technical contents of patented inventions and creations are kept confidential

C. Patented inventions can be purely theoretical.

D. The term of patent rights is 20 years.

14. Regarding the statement of retention, the correct statement is ().

A. The lien belongs to the creditor's right.

B. The creditor is not responsible for keeping the lien.

C. The construction project contract may apply the lien.

D. The lien is generated based on the law.

15. The equipment purchase contract stipulates that any party that fails to perform the contract shall pay liquidated damages of 50,000 yuan. The purchaser pays a deposit of RMB 80,000 to the supplier as agreed. When the contract performance period expires and the supplier fails to deliver the equipment, the maximum amount the purchaser can request for support from the court is RMB () million.

A. 16B. 5C. 8D. 13

16. Among the following statements about insurance contracts, the correct one is ().

A. The insurance contract can only be signed by the insured and the insurer

B. The insured or the beneficiary must be the policy holder

C. The beneficiary is designated by the insured or the policy holder

D. The insurance contract only uses property as the subject of insurance

17. Regarding the property insurance contract, the correct statement is ().

A. The insurance contract is not transferable

B. The insurer shall not require the policy holder to pay the premium through litigation

C. The insured shall be consistent with the policy holder

D. The dangers in the insurance contract involve the uncertainty of loss

18. About personal insurance contracts The correct statement is ().

A. The insurance contract can only be signed by the insured and the insurer

B. The beneficiary is designated by the insured or the policyholder

C. The insured or the beneficiary must be the policyholder

D. The insurer can use litigation to require the policyholder to pay Insurance premium

19. Regarding joint and several liability related to project contracting activities, the following statement is correct ( ).

A. The joint and several liability among the members of a consortium contracting project is an agreed joint liability

B. If the subcontracting unit is approved by the owner, the general contractor shall not be jointly and severally liable for its faults

C. The joint and several liability between the general subcontracting units of the project Liability is statutory joint and several liability

D. Each contractor who has joint and several obligations has the obligation to pay off part of the debt

20. Among the following legal responsibilities, the one that belongs to the civil liability method is ().

A. Warn B. Revoke the license C. Order to suspend production and business D. Stop infringement

21. Regarding the construction permit, the correct statement is ( ).

A. The adjustment of the quota for small projects by the construction department of the provincial people's government should be reported to the construction department of the State Council for record.

B. Farmers who build low-rise residences by themselves should apply for a construction permit.

C. Small projects below the quota should apply for a construction permit. Certificate

D. After the construction subcontract is signed, apply for the construction license

22. Regarding the professional activities of the second-level registered construction engineer, the correct one of the following statements is ( ).

A. The second-level registered construction engineer of the construction unit can serve as the person in charge of the construction of two projects at the same time

B. He cannot engage in project general contracting management and engineering technical and economic consulting

C. He can practice beyond the business scope of the employing unit

D. Practice results must be guaranteed Quality and bear corresponding responsibilities

23. Regarding the application, extension and change of construction enterprise qualification certificates, the correct statement is ().

A. When an enterprise applies for qualifications for the first time, it should apply for the lowest level qualification, but the application for additional qualifications does not need to be subject to this restriction.

B. If the qualification licensing authority fails to make a decision on extending the qualification within the time limit, it will be deemed to have been approved.

C. In the event of a merger, a construction company must inherit the original building. If the qualification certificate of a construction enterprise is withdrawn, there is no need to re-examine the qualification level of a construction enterprise.

D. An enterprise whose qualification certificate of a construction enterprise has been withdrawn may, within 6 months after the qualification is withdrawn, apply to the qualification licensing authority for a qualification of the same type that is lower than the original level. Apply for

24. Regarding the statement of contracting engineering business, the correct statement is ().

A. Enterprises that undertake subcontracting projects must obtain corresponding construction enterprise qualifications

B. Construction enterprises that do not have corresponding qualification levels can adopt the same professional joint contracting method to meet the contracting project business requirements

C. The construction enterprise signs an internal contract with the project management department The agreement allows others to undertake projects in the name of the enterprise

D. Natural persons can become the subject of subcontracting project business

25. According to the "Construction Enterprise Qualification Management Regulations", the correct statement about the construction enterprise qualification certificate is ().

A. If the qualification licensing authority fails to make a decision on whether to approve the renewal of the qualification certificate before the expiration of the enterprise qualification certificate, it will be deemed that the renewal is not approved.

B. In the event of merger, division, reorganization, restructuring, etc., the enterprise can directly inherit the original construction enterprise qualifications

C . If the project does not obtain a construction license and the construction enterprise carries out the work without authorization, the qualification licensing authority shall not approve the construction enterprise's application for qualification upgrade and addition.

D. If the qualification certificate expires and no application for renewal is made in accordance with the law, the qualification licensing authority shall withdraw it. Qualification certificate

26. The following are not excluded from all risks for construction projects ( ).

A. Losses and expenses caused by design errors

B. Loss of the insured property itself caused by defects in raw materials or poor workmanship and the costs of replacing, repairing or correcting these defects and errors

C. The mechanical or electrical device itself caused by external forces Loss

D. Maintenance or normal overhaul costs

27. The "Regulations on Quality Management of Construction Projects" stipulates that if a construction project needs to continue to be used after it has exceeded its reasonable service life, the property owner must first carry out the procedures according to law ().

A. Entrust survey and design units to formulate technical reinforcement measures

B. Entrust construction units with corresponding qualification levels to carry out reinforcement, repair and reinforcement

C. Entrust surveyors and design units with corresponding qualification levels for appraisal

D. Apply for appraisal by engineering quality supervision agencies

28. Which of the following statements about bid opening is correct ( ).

A. The bid opening shall be conducted within 3 days after the deadline for submission of bid documents specified in the bidding document.

B. The host of the bid opening is the bidding agency.

C. During the bid opening, the administrative supervision department shall check the sealing of the bid documents.

D. The tenderer requires in the bidding documents. All bid documents received before the deadline for submission of bid documents shall be opened and read to the public when the bid is opened.

29. According to the "Regulations on the Implementation of the Government Procurement Law", if government procurement projects do not require bidding according to law, the procurement methods that can be used are: ( ).

A. Inquiry B. Single source procurement

C. Direct confirmation D. Framework agreement

30. Regarding bid evaluation, the correct statement is ( ).

A. The bid evaluation committee can consult the tenderer to determine the intention of the successful bidder.

B. If the bidding project has a minimum bid, whether the bid price is close to the minimum can be used as a condition for winning the bid.

C. There are unclear contents, obvious words or calculation errors in the bidding documents. Yes, the bid evaluation committee may require the bidder to make necessary clarifications and explanations

D. If a member of the bid evaluation committee refuses to sign the bid evaluation report, it will be deemed that he disagrees with the bid evaluation results

31. Regarding the bidding price, the correct statement is ().

A. When bidding, you can set a minimum bid price limit

B. When bidding, you can set a maximum bid price limit

C. When bidding, a base price should be prepared

D. Bidding projects should be priced using a bill of quantities

32. According to the "Regulations on the Implementation of the Bidding and Bidding Law" , the upper limit of the performance bond is ( ) of the winning contract amount.

A. 2% B. 5% C. 10% D. 20%

33. Regarding joint bidding, the following does not comply with the provisions of the "Tendering and Bidding Law" ().

A. If the bidding documents stipulate the qualifications of bidders, at least one party in the consortium should have the corresponding ability to undertake the bidding project

B. For a consortium composed of units in the same profession, the qualification level shall be determined according to the unit with the lower qualification level

C . If a consortium wins the bid, all parties to the consortium shall jointly sign a contract with the tenderer. The tenderer shall not force the bidders to form a consortium to bid jointly. Qualified subcontracting unit. Because the subcontracting unit did not obey the safety management of the general contractor, a production safety accident occurred in the subcontracting project during the construction process. Regarding the statement about the responsibilities of both parties, the incorrect statement is ().

A. The general contractor shall bear overall responsibility for the safety production at the construction site of the project

B. The general contractor and the subcontracting unit shall bear joint and several liability for the safety accident

C. The general contractor shall independently complete the entire project, and subcontracting is not allowed

D. The subcontracting unit shall be primarily responsible for the accidents caused.

35. Regarding the general contracting of the project, the correct statement is ().

A. With the consent of the construction unit or in accordance with the contract, the general project contracting enterprise can directly subcontract the design or construction business of the project to the enterprise with corresponding qualifications.

B. The construction unit must invite bids in accordance with the law when choosing a general project contracting enterprise. Construction Project Management and practice

C. The comprehensive evaluation method should be used for the general contracting bid evaluation. The main factors for evaluation include the general contracting quotation, project management organization plan, design plan and project performance, etc.

D. The general project contracting project manager must have a registered engineering construction practice Qualification and technical title of senior engineer

36. Material supplier A sells unqualified materials to the construction company through material buyer B of the construction company, and promises to give B a rebate based on a certain percentage of the contract price. The construction company will use the batch of materials Applying it to the project will directly lead to the substandard quality of this part of the project. The contract belongs to ( ).

A. An invalid contract where one party concludes a contract through fraud or coercion, thereby harming the interests of the country.

B. An invalid contract where malicious collusion harms the interests of the country, the collective or a third party.

C. An invalid contract where illegal purposes are concealed in a legal form.

D. Which harms society. Invalid contract in the public interest

37. A construction company won the bid for the construction task of a residential community project and entered into a written contract with the tenderer with a total contract value of 20 million yuan. Due to the tight construction schedule, the construction tasks of some of the projects were transferred to other construction companies and profited from them. In this regard, the legal consequences that the construction company will face do not include ().

A. was fined from 5‰ to 10‰ of the transferred project amount

B. The illegal income was confiscated according to regulations

C. Was ordered to suspend business for rectification and even had the business license revoked

D. The corporate legal person was criminally punished

38. A project under construction, construction In order to facilitate the transportation of materials, the company entered into a contract with a chemical factory and paid a certain fee to transport the materials through the roads in the factory area. In this contract, the rights of the construction company are ().

A. Land contract management rights B. Easement rights

C. Land lease rights D. Construction land use rights

39. Regarding the form of the contract, the correct statement is ( ).

A. The contract must be in written form

B. Oral forms are other forms of contracts

C. Contracts that are not concluded in written form in accordance with the law are invalid

D. The contract can be in the form of data messages

40. Among the following statements about the legal provisions of lease contracts, the correct one is ( ).

A. The establishment of a lease contract requires the delivery of the leased property.

B. If a third party claims rights to the leased property, the lessee can request a reduction in rent.

C. During the lease period, the lessee can sublet

D. The lease contract is double Service contract

41. Regarding the change of construction contract, the correct statement is ().

A. Changes in the contract must be approved and registered.

B. If the content of the contract change is not clear, it is presumed to have not been changed.

C. Engineering changes will inevitably lead to contract changes.

D. Changes in non-substantive terms of the contract do not require consensus between the parties.

42. A The company purchases 50 tons of steel bars from Company B. Later, A informed B that he needed to change the purchase quantity, but the specific quantity was never specified. When the delivery date expires, B delivers 500 tons of steel bars to A, but A refuses to accept it on the grounds that he has been notified that he wants to change the contract. Regarding the contractual relationship between A and B, the correct statement is ().

A. B bears the loss

B. A can partially receive

C according to the actual situation. If A refuses to accept it, he shall bear the liability for breach of contract

D The contract between the two parties has been changed, and B's delivery constitutes a breach of contract

43. Regarding the method of resolving labor disputes, the correct statement is ( ) .

A. If there is a labor dispute between the employer and the employee, the employee should first apply for mediation by the labor dispute mediation committee of the employer.

B. If there is a labor dispute between the employer and the employee, the employee can apply for mediation, arbitration, or file a lawsuit in accordance with the law, or he or she can Reconciliation

C. The enterprise labor dispute mediation committee is composed of employee representatives, employer representatives, trade union representatives, and labor administrative department representatives

D. If an employer has a labor dispute with an employee, it may apply for arbitration to the arbitration committee at the employee’s place of residence.

44. A The unused engineering equipment was sold to B. The two parties agreed to deliver the equipment three days later. The next day, A sold the equipment to C and delivered the equipment to C. After investigation, C did not know that there was a contractual relationship between A and B. Regarding the validity of the contract between A, B, and C, the correct statement is ().

A. The contracts between A and B and C are valid

B. The contract between A and B is invalid, and the contract between A and C is valid

C. The contracts between A and B and C are invalid

D. A and B The contract between A and C will expire after it first takes effect. The contract between A and C is valid

45. Regarding the rights and obligations of the parties to the contract, the correct statement is ().

A. The ordering party shall not change the requirements of the contracted work midway.

B. The ordering party may terminate the contract at any time, causing losses to the contractor, and shall compensate for the losses.

C. If the materials provided by the ordering party do not comply with the agreement, the contractor may replace the materials on its own.

D. If the contractor delivers the work results to the orderer, the orderer shall accept the work results.

46. Regarding the statement that the seller delivers the subject matter, the correct statement is ().

A. If the buyer keeps the over-delivered subject matter that he refuses to accept, the seller may refuse to bear the storage costs

B. The seller shall deliver the subject matter in the usual packaging method

C. If the contract does not stipulate an inspection period, the buyer may Inspect the subject matter at any time

D. If a delivery period is agreed upon, the seller may deliver the subject matter at any time within that period

47. Among the following practices of construction workers, ( ) is a legitimate exercise of emergency rights.

A. Based on experience, A judged that the scaffolding might be unstable and evacuated the site

B. B found a large number of cracks on the surface around the foundation pit and earth and rocks falling, and evacuated the site after speeding up the work.

C. C took emergency measures after discovering the danger. After being invalid, he evacuated the site

D. Ding found that there was a huge safety hazard at the construction site and refused to work on the job

48. According to the "Environmental Noise Pollution Prevention and Control Law", regarding the prevention and control of environmental noise pollution in construction projects, the correct statement is ().

A. If a construction project may produce environmental noise pollution, the construction enterprise must submit an environmental impact report

B. The environmental impact report should include the opinions of the construction enterprise

C. The environmental impact report should be submitted to the environmental protection administrative department for approval

D. Environmental Impact The report must obtain the consent of the unit and residents where the construction project is located

49. According to the "Measures for the Management of Permits for Urban Sewage Discharge into Drainage Pipe Networks" regarding the permit for urban sewage discharge into the drainage pipe network Construction Project Management and Practice, it is correct is ( ).

A. Urban sewage discharge permits are charged based on the concentration of discharged pollutants

B. If drainage is required for construction operations, the validity period of the drainage permit shall not exceed the construction period

C. Drainage households can pressurize urban drainage facilities to discharge sewage as needed

D. During construction operations , the construction unit shall apply for a drainage license

50. The construction unit shall organize the completion inspection and shall not issue a ( ) report if it does not meet the mandatory standards for energy conservation of civil buildings.

A. Passed the completion acceptance

B. Passed the building energy saving

C. Passed the building energy saving standard

D. Passed the energy consumption acceptance

51. The "Green Construction Guidelines" stipulate that a construction waste reduction plan should be formulated. For example, for residential buildings, every 10,000 square meters Construction waste should not exceed ( )t.

A.200 B.400

C.500 D.600

52. Regarding the compensation losses in the construction contract of the construction project, the following losses that are not borne by the contractor are ().

A. Losses caused by transferring and lending qualification certificates, etc.

B. Losses caused by subcontracting and illegal subcontracting

C. Losses caused by cutting corners, etc.

D. Losses caused by failure to promptly inspect hidden projects

53. In accordance with the provisions of the "Cultural Relics Protection Law", Carrying out other construction projects or blasting, drilling, excavation and other operations within the protection scope of national key cultural relics protection units must be approved by ( ). classic 100 questions

A. Cultural relics administrative department of the State Council

B. Cultural relics administrative departments of provinces, autonomous regions and municipalities

C. State Council

D. People's governments of provinces, autonomous regions and municipalities

54. According to the "Construction Project Quality Management Regulations", for decoration projects involving () , the construction unit should entrust the original design unit or a design unit with corresponding qualification levels to propose a design plan before construction.

A. Improve the internal look and feel of the project B. Change the main body and load-bearing structure of the building

C. Increase the total project cost D. Change the local use functions of the construction project

55. Regarding the safety production license of construction enterprises, the correct statement is ( ).

A. Engaging in construction activities without a production safety license will not incur administrative liability

B. When applying for a replacement production safety license, you should declare in the public media that the original license is invalid

C. Only after re-examination, the validity period of the production safety license may be extended

D .Whether a construction enterprise has a safety production license does not affect the issuance of a construction license

56. Among the following statements about the safety responsibilities of the project leader, the incorrect one is ().

A. The project leader is the first person in charge of the quality and safety management of the project

B. Be fully responsible for the safety of the construction project

C. Develop a safety production responsibility system, safety production rules and regulations and operating procedures

D. Organize and formulate safety according to the characteristics of the project Construction measures to eliminate potential safety accidents

57. According to the "Interim Measures for Construction Site Leadership by Persons in Charge of Construction Enterprises and Project Leaders" regarding the construction site guidance system for responsible persons of construction enterprises, the correct answer is ().

A. The person in charge of a construction enterprise refers to the legal representative and general manager of the enterprise, excluding the deputy chief engineer in charge of quality, safety and production work.

B. The person in charge of the construction enterprise must lead regular inspections, and the inspection time every month shall not be less than 20% of the working days

C. If the person in charge of an enterprise group with a branch cannot go to the site for some reason, he can verbally entrust the person in charge of the branch where the project is located to conduct a shift inspection of the construction site

D. When the person in charge of the construction enterprise leads a shift inspection, he should Make inspection records carefully and file them in the enterprise and project for future reference.

58. According to the "Work Injury Insurance Regulations", the circumstances that cannot be recognized as work injuries are ().

A.

B who suffered injuries due to a traffic accident for which he was primarily responsible on the way to work.

C who suffered from occupational diseases.

D who had an accident due to work reasons while away from work and whose whereabouts are unknown.

59 who suffered injuries from a fall while working at height. According to the "Construction According to the "Regulations on Engineering Safety Production Management", if the construction site in the urban area is not closed and enclosed, the legal liability that may be borne under normal circumstances is ().

A. Impose a fine of 200,000 yuan B. Order the construction company to make corrections within a time limit

C. Revoke the business license of the construction company D. Reduce the qualification level of the construction company

60. Regarding the implementation of the special safety construction plan, the correct statement is ( ).

A. The project manager shall also serve as the inspector of the implementation of the special plan to supervise the on-site implementation.

B. The supervision unit shall prepare supervision implementation details in conjunction with the special construction plan for dangerous major projects.

C. If construction is found not to be carried out in accordance with the special plan, it shall be reported to the construction unit and rectified.

D. When a potential hazard endangering personal safety is discovered, immediately organize workers to evacuate.

61. A scaffold collapsed at a construction site, causing serious injuries to 10 people. According to the "Regulations on Reporting, Investigation and Handling of Production Safety Accidents", the level of the accident is ().

A. Extraordinarily serious accident B. Major accident

C. Major accident D. General accident

62. According to the "Regulations on Production Safety Management of Construction Projects", if a construction safety accident occurs in a subcontracted project of a general contracting project, it is responsible for reporting to the government safety supervision department The person who reported the accident to the relevant departments was ( ).

A. General contractor B. Subcontractor

C. Construction unit D. Site safety person responsible

63. Among the following matters, the one that falls under the responsibility of the construction safety accident investigation team is ( ).

A. Identify the indirect economic losses caused by the accident

B. Investigate the legal liability of the responsible person

C. Submit an accident investigation report

D. Propose a compensation plan for the injured

64. Among the following statements about joint and several liability related to engineering contracting activities, which one is correct? ( ).

A. The joint and several liability among the members of a consortium contracting project is an agreed joint liability

B. If the subcontracting unit is approved by the owner, the general contractor shall not be jointly and severally liable for its faults

C. The joint and several liability between the general subcontracting units of the project Liability is statutory joint and several liability

D. Each contractor with joint and several obligations has the obligation to pay off part of the debt

65. The "Regulations on Quality Management of Construction Projects" stipulates that if a construction project needs to continue to be used after it has exceeded its reasonable useful life, the property rights The first procedure that everyone should carry out according to law is ().

A. Entrust the survey and design unit to formulate technical reinforcement measures

B. Entrust the construction unit with the corresponding qualification level to carry out reinforcement, repair and reinforcement

C. Entrust the survey and design unit with the corresponding qualification level for appraisal

D. Apply for the appraisal by the project quality supervision agency

66 . According to the "Regulations on Supervision of the Implementation of Compulsory Standards for Engineering Construction", the following situations do not fall within the scope of mandatory standard supervision and inspection ().

A. Whether the planning, survey, design, and construction phases of the project comply with the mandatory standards

B. Whether the materials and equipment used in the project meet the mandatory standards

C. Whether the project management personnel are familiar with the mandatory standards

D. Whether the safety and quality of the project are Comply with the mandatory standards

67. According to the "Tendering and Bidding Law", the host of the bid opening is ().

A. Construction administrative department B. Tenderee

C. Tendering agency D. Representative selected by the bidder

68. Regarding the quality responsibility of the general subcontracting unit, the correct statement is ( ).

A. The subcontracting unit shall be responsible to the construction unit for the quality of the subcontracted project.

B. The subcontracting unit shall accept the quality management of the general contractor.

C. The general contractor and the subcontracting unit shall each bear corresponding responsibilities to the construction unit for the quality of the subcontracted project. Responsibility

D. If quality problems occur in a subcontracted project, the construction unit can only request compensation from the general contractor.

69. The following are not subject to suspension of the statute of limitations: ().

A. Force majeure

B. No heir or estate administrator has been determined after the inheritance has begun.

C. The right holder is controlled by the obligor or other persons.

D. The right holder reports the case to the public security organ and requests protection of his civil rights.

70. According to the "Construction Project Quality Management Regulations" , regarding the quality responsibilities and obligations of the project supervision unit, the correct statement is ().

A. The supervision unit shall not have any interest in the design unit of the project being supervised.

B. The supervision unit shall supervise the construction quality and bear supervision responsibility for the construction quality.

C. Building materials shall not be used in the project without the signature of the chief supervision engineer.

D. Construction drawing deepening documents are the main basis for supervision work

71. According to the "Construction Project Quality Management Regulations", when the construction administrative departments and other relevant departments of the people's governments at or above the county level perform their supervisory and inspection duties, the measures they have the authority to take are ().

A. Require the inspected unit to provide a project quality deposit

B. Enter the construction site of the inspected unit for inspection

C. When problems that seriously affect the quality of the project are found, order the company to suspend operations for rectification

D. Investigate the bank statements between the construction unit and the construction enterprise

72 . The following disputes fall within the scope of labor disputes ( ).

A. Disputes between individual craftsmen and helpers and apprentices

B. Disputes between workers requesting social insurance agencies to pay social insurance benefits

C. Disputes between families or individuals and domestic service personnel

D. Disputes arising from the confirmation of labor relations

73. According to the "Construction Project Quality Management Regulations", after the construction project is completed, the main body that organizes the completion acceptance of the construction project is ().

A. Construction unit B. Construction administrative department

C. Project quality supervision station D. Construction enterprise

74. In the following situations, except (), all subcontracting activities are prohibited by law.

A. The scope of the professional contractor's contract is all the projects contracted by the contractor, and the total project payment except the "management fee" paid is calculated.

B. The construction general contractor directly contracts it in the name of cooperation or joint venture.

C. The general contractor dismembers the contracted project and hands it over to others in the form of subcontracts.

D. The subcontractor subcontracts the contracted project again.

75. Determination of the defect liability period The correct statement is ().

A. The construction contract can stipulate that the defect liability period is 26 months

B. Due to the contractor's reasons, the project cannot be completed and accepted, and the defect liability period is calculated from the date of actual completion and acceptance.

C. A certain project was completed on June 11, 2018 Construction project acceptance record, the defect liability period of the project starts from June 11, 2018

D. Due to the contractor's reasons, the project cannot be completed and accepted within the specified time limit. 60 days after the contractor submits the acceptance report, the project automatically enters the defect liability Issue

76. Regarding the following statement about the validity of the arbitration award, the correct one is ().

A. The arbitral award is enforceable. If one party fails to perform, the other party may apply to the Arbitration Commission for enforcement.

B. The arbitral award cannot be directly recognized and enforced in all contracting countries or regions of the Convention on the Recognition and Enforcement of Foreign Arbitral Awards.

C. The parties may apply to the Arbitration Commission for enforcement. If the People's Court requests to revoke an award, the award will have no legal effect

D. Once the award is final, the party's application for arbitration or lawsuit to the People's Court regarding the same dispute will not be accepted.

77. The contractor has submitted the completion acceptance report, but the contractor delays For acceptance, completion date ( ).

A. The completion date stipulated in the contract shall prevail

B. It shall be postponed accordingly

C. The date when the contractor submits the completion report shall prevail

D. The completion acceptance date shall prevail

78. Regarding arbitration, the correct statement is ( ) .

A. If there is no arbitration agreement or the arbitration agreement is invalid, the court shall accept the dispute between the parties

B. For arbitration cases with a valid arbitration agreement, the court still has jurisdiction

C. As long as one party applies for arbitration, the arbitration committee shall accept it

D. After the arbitration award is made, if the parties bring a lawsuit to the court regarding the same dispute, the court should accept it.

79. Regarding reconciliation, the correct statement is ().

A. The settlement agreement has contractual effect

B. Reconciliation can only occur before litigation

C. After the parties apply for arbitration, they cannot settle on their own.

D. The settlement agreement must be made in writing

80. Regarding the general geographical jurisdiction of civil cases , the following statement is wrong ( ).

A. Civil lawsuits filed against citizens shall be under the jurisdiction of the People's Court of the place where the defendant has his domicile.

B. If the defendant's place of domicile is inconsistent with his usual place of residence, the People's Court of the place of habitual residence shall have jurisdiction.

C. The place of habitual residence refers to the continuous period of time between the citizen leaving his place of residence and the time of filing the lawsuit. Place of residence for more than 6 months

D. If several defendants in the same lawsuit are domiciled in the jurisdiction of two or more people's courts, these people's courts have jurisdiction

2. Multiple choice questions

81. The following events occurred during the performance of the construction contract Under the circumstances, the parties can terminate the contract: ( ).

A. The construction unit delayed the payment of the project payment and agreed to provide guarantee after being urged.

B. Without the consent of the construction unit, the construction company replaced the on-site technician's

C. The construction company's completed construction project quality was not up to standard and refused to repair it.

D . During the construction process, the construction company was dissatisfied with the construction unit's instructions, evacuated all workers and construction machinery from the site, and started construction of other projects. The construction company's poor construction organization resulted in repeated delays in the construction period, making the project no longer worth putting into production.

82. Regarding the description of the statute of limitations for civil actions, the following errors are ().

A. The statute of limitations for claims against the carrier for maritime cargo transportation is 1 year.

B. The period of ordinary statute of limitations is usually 2 years.

C. The period of special statute of limitations is usually 3 years.

D. Disputes arising from international goods sales contracts and technology import and export contracts The limitation period is 4 years

E. The maximum protection period of rights is 20 years

83. Regarding the provisions of the "Regulations on the Implementation of the Bidding and Bidding Law" regarding the opening of bids, the following statements are correct ( ).

A. If the bidder has any objection to the bid opening, it shall raise it at the bid opening site, and the tenderee shall respond on the spot and make a record

B. If the bidder has any objection to the bid opening, it shall raise it within 3 days of the bid opening day, and the tenderer shall make a Reply and make a record

C. If there are less than 3 bidders, the bid shall not be opened.

D. If there are less than 5 bidders, the bid shall not be opened.

E. The tenderer shall open the bid at the time and place specified in the bidding documents.

84. The following is about the protection of property rights. The incorrect expression of the method is ().

A. If there is no right to possess real estate or movables, the obligee may request to eliminate the obstruction or eliminate the danger.

B. If it impedes or may impede real rights, the obligee may request the return of the original property.

C. If the real estate or movables is damaged, the obligee may Request to repair, redo, replace or restore the original condition

D. If the infringement of property rights causes damage to the right holder, the right holder can only request damages

E. If a dispute arises over the ownership and content of the property rights, the interested party may request confirmation of the rights

85. According to "Construction Project Quality Management Regulations" stipulates that if a project supervision unit has a subordinate relationship or other interest relationship with the project being supervised ( ), it shall not undertake the supervision business of the project.

A. Building material supplier B. Survey and design unit

C. Construction company D. Construction unit

E. Equipment supplier

86. If there is no person with the right to dispose of the property of others, in the case of (), the contract is valid.

A. Approved by the right holder B. Appropriate to his age

C. Appropriate to his intelligence D. Appropriate to his mental health condition

E. The person without the right to dispose of has obtained the right to dispose after the conclusion of the contract

87. In the following circumstances of terminating the labor contract, the employer The units that should pay economic compensation to workers include ( ).

A. The fixed-term labor contract is terminated when the labor contract expires but the employee does not agree to renew it according to the original labor contract conditions.

B. The labor contract is terminated because the employer fails to pay labor remuneration in full and on time.

C. The employer proposes and

D where the labor contract is terminated by consensus with the employee.

D where the labor contract is terminated because the employee is not qualified for the job and is still unable to do the job after training or adjusting the job position.

E where the labor contract is terminated because the employee establishes a labor relationship with others at the same time and seriously affects his or her own job.

88 of the labor contract. The circumstances under which the production safety license issuance and management agency or its superior administrative agency may revoke the production safety license that has been issued include ().

A. Staff members of the production safety license issuance and management agency abuse their authority to issue production safety licenses

B. Employees who exceed their legal authority to issue production safety licenses

C. Employees who violate legal procedures to issue production safety licenses

D. Those who do not meet the conditions for safe production

E when a construction company is issued a production safety license.

89 when a major safety accident occurs to a construction company that has obtained a production safety license. Among the following statements about bidding methods, the correct ones are ( ).

A. The announcement of public bidding should be released through the media designated by the state.

B. The invitation to bid should be issued to three or more legal persons with corresponding qualifications.

C. The project must be procured from the original winning bidder, otherwise projects that cannot meet the functional supporting requirements can be carried out. General contracting bidding

D. Large-scale projects can be subject to two-stage bidding

E. General contracting bidding refers to the general contracting bidding for all or part of the project and related goods and services

90. Company A used domestic equipment as samples and lied It is said that the imported equipment was imported. After the

equipment sales contract was concluded with construction company B, construction company B became aware of the truth. Regarding the handling of disputes in this contract, which statement is correct ( ).

A. If the sales contract is revoked, the relevant dispute resolution clauses will also be invalid

B. Construction company B has the right to decide independently whether to exercise the right of cancellation

C. Construction company B has the right to claim to cancel the contract within 1 year from the date of conclusion of the contract

D . After the sales contract is revoked by the court, the contract will have no legal binding force from the beginning.

E. Construction company B has the right to request the revocation of the contract within 1 year from the date when it knows that the equipment is domestically produced.

91. Some quality problems were discovered when a construction project was completed. Defects, some of which are caused by the behavior of the contractor, shall be borne by the contractor.These behaviors include ( ).

A. The design provided is defective

B. Agree with a certain subcontractor selected by the general contractor in accordance with the law to subcontract professional projects

C. Directly designate a certain subcontractor to subcontract professional projects

D. The building components provided do not meet the mandatory standards

E. The designated equipment purchased did not meet the mandatory standards

92. The following incidents occurred in a construction company: employee Li lost his ability to work due to a work-related injury; employee Wang was given an administrative penalty by the public security organ for stealing a bicycle; employee Xu was She became pregnant while living with others; employee Chen was sent overseas and failed to return overdue; employee Zhang was sentenced for major engineering safety accidents. In this regard, the construction company can terminate the labor contract at any time ().

A. Li B. Wang

C. Xu D. Chen

E. Zhang

93. According to the "Construction Project Quality Management Regulations", the conditions that should be met for the completion acceptance of construction projects are ().

A. Project warranty letter signed by the construction unit

B. Project supervision log

C. Complete the construction project design and various contents agreed in the contract

D. Complete technical files and construction management information

E. The main building materials, building components and accessories used in the project Equipment field test report

94. Regarding the legal effect of mediation, the correct statement is ().

A. The court mediation agreement shall have the legal effect of enforcement after being signed by both parties.

B. The arbitration mediation agreement shall be legally effective after being confirmed by the People's Court.

C. The mediation agreement reached through mediation by the People's Mediation Committee shall be legally binding.

D. The mediation agreement reached through mediation by a mediation organization has the legal effect of enforcement

E. The mediation agreement reached through mediation by a professional organization has legal binding force

95. Among the following construction project construction contracts, the ones that are invalid contracts are ().

A. A construction project construction contract signed by a contractor who exceeds the qualification level

B. A construction project construction contract signed by a contractor based on the advance payment requirements of the contractor

C. A construction project construction contract signed by a contractor who borrows the qualifications of others

D. The contractor and A construction project construction contract signed directly by the employer through negotiation for a project that must be subject to bidding but not tendered.

E. A construction project construction contract signed by the contractor who subcontracts all the labor services of the project to a labor service company.

96. Projects that are subject to public bidding include the following: Under certain circumstances, those who can invite bids with approval include ( ).

A. Projects with complex technology

B. Projects with only a few potential bidders to choose from due to regional environmental restrictions

C. Projects where the cost of public bidding accounts for a large proportion of the contract value

D. Projects requiring two-stage bidding

E . National, provincial and municipal key projects

97. Among the following statements, the one that reflects the independence of arbitration is ().

A. The arbitration committee is independent of the administrative agencies and has no affiliation with them.

B. The arbitration committees have no affiliation with each other.

C. The arbitration is based on the principle of non-public hearings. One of the important features

98. Regarding the prevention and control of environmental noise pollution at construction sites, the correct statement is ().

A. The environmental noise emission limit at the construction site has nothing to do with the time period

B. "Night" refers to the period between 22:00 and 8:00 the next day

C. In urban areas where noise-sensitive buildings are concentrated, it is prohibited to Construction operations that generate environmental noise pollution other than emergency repairs and emergencies are carried out at night.

D. The buildings of scientific research units are noise-sensitive buildings.

E. The environmental protection administrative department has the right to conduct on-site inspections of construction units that emit environmental noise.

99. Regarding civil affairs The correct statement about the litigation jurisdiction system is ().

A. After the grass-roots court in District A accepted a dispute over a technology transfer contract, it found that it had no level jurisdiction and transferred the case to the Intermediate People's Court of City A for trial, which was a transfer of jurisdiction.

B. When a lawsuit is filed over a dispute over a house sales contract, the house will definitely be able to file a lawsuit. The jurisdiction of the local people's court

C. Cases involving house sales contract disputes cannot agree on the jurisdictional court

D. The transfer of jurisdiction may be caused by the court accepting the case violating the regulations on the level of jurisdiction

E. The parties can change the level of jurisdiction of the case through an agreement

100. About engineering construction defects The correct statement about the responsibility period is ().

A. The defect liability period is generally 1 year, and the maximum shall not exceed 2 years.

B. The defect liability period starts from the date when the contractor submits the completion acceptance report.

C. The defect liability period starts from the date the project passes the completion acceptance.

D. Contractor If the completion is delayed for any reason, the project will automatically enter the defects liability period

E 60 days after the contractor submits the completion acceptance report. If the completion is delayed due to the contractor's reasons, the defects liability period will start from the date of actual completion acceptance.