Qian Zhongshu said: With the door, we can go out. With the window, we don’t have to go out.
windows bring beautiful scenery into our eyes, but the old windows also bring hot air, humidity and rain into the house.
Especially in Shenzhen’s long summer, glass cannot block the exposure, the air conditioner is turned on very low, and the power consumption is too high. When it comes to typhoon season, there are storms from time to time. When the window is closed, the water flows in, and the house becomes wet and stuffy.
The owners living in Yuandong Garden encountered the above problems. When searching for window replacement products, they learned that the 8-hour lossless window replacement process of the builder uses the method of not removing the old window foundation and not damaging the wall to achieve the goal of "demolition on the same day, delivery on the same day, and installation on the same day". The replacement of new windows in 8 hours will not affect the normal life of the owner.
Lossless window replacement not only ensures that the original walls and decorations are not damaged, but also reduces construction waste and waste on site. It is not only environmentally friendly, but also greatly reduces the unsafe factors of falling objects from high altitudes.
The entire process of building home lossless window replacement:
1
on-site measurement, formulate a detailed plan
After accepting the customer's demand for changing balcony and bedroom windows, the builder and the customer make an appointment with the customer to arrange a professional master to measure the size, and customize the design according to the customer's decoration style and personal needs, formulate a detailed plan and quote.
2
was put into production, and an appointment was made to install
Builder and the builder communicated repeatedly with the customer, and finally put the determined plan into production. After production is completed, the customer will be notified and the installation time will be made.
3
8 hours to change windows, which will not affect your life
Before installing the window, the builder installation master will first protect the appliances and furniture near the windows. During the installation process of
, the master will remove the old window, install the window frame, do a waterproofing treatment and install the window sash. Afterwards, on-site debugging will be carried out to ensure that the windows are in use normally. After the installation of
is completed, the builder will clean the site to keep your home clean before changing the windows. The entire installation process of
is completed in 8 hours, so that the customer still has old windows when he goes out in the morning and has new windows when he goes home at night. The whole home feels refreshed, and the fatigue of working all day instantly dissipates. After the new windows such as
and other new windows started to be used for a while, Zhuzaojia customer service conducted a follow-up visit to the customer. The customer said that the new windows are very classy and more suitable for the decoration style. Without opening the windows, there is no leakage, especially the air conditioner no longer needs to be turned on, and the cooling effect is also very good.
Customer satisfaction, Zhujiazhuo is also full of pride. It is Zhujiazhuo’s service purpose to serve every user with care.