The review points for the special qualification of highway engineering construction general contracting are divided into four categories: credit ability, personnel requirements, scientific and technological progress level, and representative project performance requirements. Let’

2024/04/2709:05:34 finance 1081

The review points for special qualifications for general contracting of highway project construction are divided into four categories: credit ability, personnel requirements, scientific and technological progress level, and representative project performance requirements. Let’s take a look at the details:

The review points for the special qualification of highway engineering construction general contracting are divided into four categories: credit ability, personnel requirements, scientific and technological progress level, and representative project performance requirements. Let’ - DayDayNews

Guangdong Zhurong Enterprise Service Co., Ltd.

1. Credit ability

(1) The registered capital of the enterprise is more than 300 million yuan.

Review content: Enterprise business license Original and duplicate copies (including annual inspection records).

(2) The company’s net assets are more than 360 million yuan.

Review content: The "Total Owners' Equity" column in the audited financial statements of the year before the company applies for qualifications or the current period.

(3) The company has paid more than 50 million yuan in highway project business tax every year in the past three years.

Review content: Business tax stamps for highway engineering projects provided by the enterprise; the highway engineering business tax paid by the enterprise in each of the past three years has not been less than 50 million yuan.

Note: Construction industry business tax is calculated at a tax rate of 3%. Annual tax payable = annual highway project turnover × tax rate; value-added tax is calculated based on actual payment.

If the declaration is based on overseas project settlement income, it can be converted into domestic project settlement income based on the current settlement period (day) exchange rate , and the business tax can be calculated according to the domestic tax rate. The enterprise should also provide overseas project settlement information, the current (daily) exchange rate of the country (region) where the project is located, and relevant materials or contracts from the economic and commercial offices of the embassy and consulates where the project is located, as well as relevant materials provided by the owner. If the information is in a foreign language, a Chinese translation should be attached.

(4) The credit line of corporate banks has been more than 500 million yuan in the past three years.

Review content: The annual credit agreement or approval document signed by the enterprise and the bank. The maximum annual credit limit of a single bank in the past three years shall not be less than RMB 500 million. The annual credit limits of multiple banks are not calculated cumulatively.

2. Personnel requirements

(1) The enterprise manager has more than 10 years of experience in project management .

Review content: Company manager’s employment documents, ID card , pension insurance payment materials; resume of more than 10 years of experience in project management in the "Construction Enterprise Qualification Application Form".

(2) The technical person in charge (vice president in charge of technology, chief engineer or deputy chief engineer) has more than 15 years of experience in engineering technology management, and has a senior professional title in this profession and a first-class registered construction engineer or registered engineer qualification; presides over (As a project manager or chief engineer ) Have completed two or more technical works of representative projects required by general contracting first-level qualifications, representative projects required by first-class design qualifications, and highway projects with a contract value of more than 200 million yuan. general contracting project.

Review content: The company’s employment documents, professional title certificates, ID cards, and pension insurance payment materials; copies of the first-class registered construction engineer or registered engineer certificates stamped with professional seals; personal performance materials (including appointment documents, construction or design engineering projects Contract and completion (delivery) materials, design performance and construction drawings need to be submitted) and more than 15 years of experience in engineering technology management in the "Construction Enterprise Qualification Application Form".

If a personal representative project performance is completed in another unit, he must provide the appointment documents of the original unit, the contract and completion (delivery) information of the construction or design project, or construction drawings.

(3) The financial person in charge (corporate chief accountant, deputy chief accountant or financial director) has the title of senior accountant and certified public accountant qualification.

Review content: Enterprise employment documents, professional title certificates, ID cards, pension insurance payment materials; certificate of passing the National Unified Certified Public Accountant Examination.

(4) The enterprise has more than 50 first-level registered construction engineers.

Review content: ID card, pension insurance payment materials; first-class registered construction engineer certificate with professional seal.

Note: The total number of first-class registered construction engineers owned by an enterprise shall not be less than 50, including not less than 15 first-class registered construction engineers specializing in highway engineering.

(5) Engineering designers

1) Enterprises must have professional and technical personnel required by the Grade A qualification standards of the highway engineering design industry.

2) In accordance with the " Construction Project Survey and Design Enterprise Qualification Management Regulations " ( Ministry of Construction Order No. 160), " Engineering Design Qualification Standards ", "Construction Project Survey and Design Qualification Management Regulations Implementation Opinions" (Jianshi [ 202) and other regulations, engineering designers should fill in the "List of registered personnel engaged in engineering survey and design", "List of non-registered personnel engaged in engineering design (leading majors)" and "List of non-registered personnel engaged in engineering design (non-registered personnel)". Leading major)".

3) Registered personnel shall be assessed based on their ID cards, pension insurance payment materials, and registered practice qualification certificates stamped with practice seals.

4) Non-registered leading professionals should have presided over no less than 3 medium-sized or above projects in the applied industry as the professional technical leader, including no less than 1 large-scale project (see Appendix 2 for the project design scale), and fill in the " The basic information and performance table of professional and technical personnel, as well as ID cards, academic certificates, professional title certificates, social security payment materials, etc. are the basis for assessment.

Non-registered non-leading professionals are assessed based on their ID cards, academic certificates, professional title certificates, pension insurance payment materials, etc.

5) Technical personnel’s personal performance needs to provide unit description, design drawings and other materials. Enterprises that provide false information or units that provide false information for reporting units will be punished in accordance with relevant regulations such as qualification management and credit management in subsequent work.

6) Professional and technical personnel and registered practitioners who are transferred to the enterprise must provide dismissal materials from the original employing unit, and retired personnel must provide retirement materials.

3. Level of scientific and technological progress

(1) The enterprise has an enterprise technology center at the provincial and ministerial level (or equivalent to the provincial and ministerial level) and above.

Review content: Approval documents or certification certificates from the review and approval department.

Note: National enterprise technology centers (including branch centers) are in compliance with the " Nationally Recognized Enterprise Technology Center Management Measures " (National Development and Reform Commission, Ministry of Science and Technology , Ministry of Finance, General Administration of Customs , State Administration of Taxation Order No. 53) and certified enterprise technology centers (including branch centers).

Provincial and ministerial enterprise technology centers are enterprise technology centers recognized by relevant provincial authorities in accordance with the "Management Measures for Nationally Recognized Enterprise Technology Centers" and formulated corresponding policies and procedures.

(2) The average expenditure on scientific and technological activities of enterprises in the past three years has reached more than 0.5% of turnover.

Review content: In the "Expenditure for Science and Technology Activities" column in the company's financial statements or the special audit report on science and technology funds, the funding investment must be no less than 8 million yuan per year in the past three years.

Note: The company’s funding for scientific and technological activities in the past three years shall not be less than RMB 8 million per year, which is calculated based on the minimum business tax required by the qualification standards, that is, RMB 50 million ÷ 3% × 0.5% = RMB 8.33 million, rounded to an integer The latter is 8 million yuan; (50 million yuan is the minimum requirement for special-grade qualifications for enterprises to pay construction industry business tax in each of the past three years; 3% is the construction industry business tax rate; 0.5% is the expenditure for scientific research activities of enterprises for special-grade qualifications in the past three years. The lowest proportion of the average turnover);

scientific and technological activity funds include scientific and technological development funds (generally including new product design fees, process specification formulation fees, equipment adjustment fees, various test fees, technical data purchase fees, research institution personnel salaries and other funds related to scientific and technological research or expenses for entrusting other units to carry out scientific research and trial production), information construction funds, scientific and technological training funds and scientific and technological development reward funds.

(3) Information construction

written review content: information construction materials.

On-site inspection content: Members of the on-site inspection team will give scores based on the "Informatization Assessment of Special Qualifications of Highway Construction General Contracting Enterprises".

4. Representative project performance requirements:

has undertaken general engineering contracting, general construction contracting or main project contracting for more than 3 of the following 4 projects in the past 10 years, and the project quality is qualified.

(1) A total of more than 100 kilometers of first-class highway roadbeds have been built;

(2) A total of more than 4 million square meters of high-grade pavement has been built;

(3) A total of single bridges with a length of ≥500 meters or a single span of ≥100 meters have been built. More than 6 highway bridges;

(4) More than 3 highway projects with a single contract value of more than 200 million yuan.

If you have questions about qualification agency, please feel free to consult Zhurong Enterprise Service. Guangdong Zhurong Enterprise Service Co., Ltd. is an agency company specializing in new, added, upgraded, and extended qualifications for various construction projects. It also handles safety production licenses. Certificate , a business management consulting company that provides construction enterprise talent services (first-level , second-level construction engineer , intermediate and senior engineers, technician certificate , etc.). It has been specialized in handling construction qualifications for more than ten years. No fee for failure!

finance Category Latest News