2023 Supervision Engineer case golden test site quality responsibility and obligations of construction units, the director must test site, long press and like + forward + evaluation continue to be updated, click on my avatar on the Wendang version and send a private message to me: 2022
(1) When contracting a construction project, the contractor shall not be forced to bid at a price lower than the cost, and shall not arbitrarily compress the reasonable construction period. It is not allowed to express or imply that the design unit or construction unit violates the mandatory standards for engineering construction and reduces the quality of construction projects.
(2) Construction drawing design documents shall not be used without review and approval. The specific methods for reviewing construction drawing design documents shall be formulated by the State Council’s construction administrative department and other relevant departments of the State Council.
(3) Construction projects that are subject to supervision shall be entrusted to supervise the project supervision unit with the corresponding qualification level, or the design unit of the project that has the corresponding qualification level of engineering supervision and has no affiliation or other interests with the construction contractor of the project being supervised.
The following construction projects must be supervised:
1) National key construction projects;
2) Large and medium-sized public utilities projects;
3) Residential community projects developed and constructed in large areas;
4) Projects that use loans and aid funds from foreign governments or international organizations;
5) Other projects that must be supervised by the state.
(4) Before the construction project starts, the project quality supervision procedures shall be handled in accordance with relevant national regulations. The project quality supervision procedures may be handled in conjunction with construction license or start-up report.
(5) If building materials, building components and equipment are purchased in accordance with the contract, it shall ensure that the building materials, building components and equipment comply with the design documents and contract
requirements. It is not allowed to express or imply that the construction unit uses unqualified building materials, building components and equipment.
(6) Decoration projects involving changes in the main body and load-bearing structure of the building, the original design unit or the design unit with corresponding qualifications shall be entrusted to propose the
design plan before construction; if there is no design plan, construction shall not be carried out. During the decoration process, users of house buildings shall not change the main body and load-bearing structure of the house buildings without authorization.
(7) After receiving the completion report of the construction project, shall organize the design , construction, engineering supervision and other relevant units to conduct completion acceptance. The following conditions shall be met:
1) Complete the construction project design and the contents agreed in the contract;
2) Have complete technical files and construction management materials;
3) Have entry test reports on the main building materials, building components and equipment used in the project;
4) Have quality certificates signed by survey, design, construction, engineering supervision and other units;
5) Have project warranty signed by the construction unit.
construction project can only be delivered and used if it passes the acceptance inspection.
(8) shall strictly follow the relevant national archive management regulations, collect and organize documents and materials of all links of construction projects in a timely manner, establish and improve construction project archives, and after the completion and acceptance of the construction project, transfer construction project archives to the construction administrative department or other relevant departments in a timely manner.