1. Foundation treatment (1) Verify the raw material qualification certificate, on-site inspection record and re-examination report and actual on-site materials (2) Approve the construction plan of foundation treatment (3) Check the inspection method, quantity and results of found

1. foundation processing

(1) Check the raw material certificate of conformity, on-site inspection records and re-examination reports and actual on-site materials

(2) Approve the construction plan of foundation processing

(3) Check the detection method, quantity and results of foundation processing effect

(4) Check the issuance foundation processing acceptance records

(5) Inspection or inspection of the processing process or stand by

2. Pile foundation project

Check the prefabricated pile material certificate and re-inspection report; check the prefabricated pile product certificate . Accept the physical objects entering the site with the certificate of conformity and record the

Check the prefabricated pile pile material certificate, re-inspection report and physical objects. Check the re-examination report, make a good acceptance record, and review the pile foundation construction plan

inspect the pile driving process or inspect the side station, and review the pile driving records and hidden acceptance records

review the pile foundation bearing capacity and pile body quality inspection plan, and inspect the inspection report

review the pile foundation quality acceptance record.

3. Foundation engineering

Check whether the raw material qualification certificate is consistent with the entry materials, witness sampling pass the re-examination, sign the entry inspection record

inspects, parallel inspections, and stands for construction processes such as axis and elevation, steel bar production and binding, masonry, and waterproofing, sign relevant acceptance documents

testifies to the mortar and concrete test blocks, and checks whether the strength report meets the requirements

reviews the special construction plan;

signs the foundation engineering quality acceptance record

0000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000 4. cast-in-place concrete structure

Check whether the raw material certificate is consistent with the on-site material, witness whether the sampling and re-examination passes, sign the on-site inspection record

inspects, parallel inspections, and side stations for construction processes such as axis and elevation, steel bar production and binding, connection (mechanical connection, welding, binding), masonry, waterproofing, etc., signs relevant acceptance documents

tests mortar and concrete test blocks, and checks whether the strength report meets the requirements, and whether the assessment is qualified.

reviews the construction plan for special projects (format production, steel bar binding, concrete curing, etc.);

checks the premixed concrete certificate , mix ratio and measurement

5. prefabricated structure

verifies the raw material certificate and re-examination report; the component factory certificate and actual prefabricated components and signed component entry acceptance records

Review the lifting plan

Inspection of the lifting process, parallel inspection, side station inspection, signing the lifting record and concealed acceptance records

6. Masonry structure engineering

Verify the certificate of conformity of bricks and other raw materials and physical objects entering the site, witness the sampling and re-examination, conduct parallel inspection of the appearance, sign the acceptance record of the site

Check whether the laboratory mortar mix ratio is consistent with the actual ratio on site, check the on-site measurement

inspect the assembly, jointing, tie reinforcement , structural columns, etc., and sign relevant acceptance records.

test the mortar test block indwelling, check whether the test pressure strength meets the requirements

7. Steel structure

Check whether the raw materials (steel, welding materials, high-strength bolts, anticorrosion coating , fireproof coating, etc.) and the semi-finished product certificate and the actual materials entering the site are consistent, witness whether the sampling and re-examination pass, sign the on-site inspection record

Check whether the on-the-job personnel are consistent with the on-the-job certificate , check the steel structure trial welding test report and welding quality, check the welding working conditions

Check the drying record and use records of flux , and sign the

Check whether the manufacturer's test report and pre-installation re-inspection report are consistent with the high-strength bolt connection friction surface, check the high-strength bolt torque coefficient re-inspection report

conducts parallel inspections or on-site inspections on welding, high-strength bolt installation, coating and other processes and quality, sign relevant acceptance records

reviews the first and second-level weld flaw detection and testing plans, check the test results

8, curtain wall engineering

checks the raw materials ( aluminum profile , steel, expansion Swelling bolts, , glass, structural glue, , sealant, etc.) certificate of conformity, performance test report and entry materials are consistent with the compatibility of structural glue, weather-resistant glue, and substrate, the bending strength and radioactivity of stone, the three properties of curtain wall engineering, and the removal resistance of the rear embedded parts meet the requirements.

The embedded parts are embedded, the node connection of components, fire protection, lightning protection treatment, plate installation and fixation, peripherals and deformation joints, etc., inspect the quality of the on-site inspection, and sign relevant acceptance records

9. Decoration and decoration project

(1) Certificate of conformity of raw materials and components, acceptance records, and re-examination report;

(2) Base layer processing;

(3) Waterproofing treatment of exterior walls and floors;

(4) Installation of doors and window frames and spelling materials;

(5) Decoration quality and bonding strength test report of decorative panels and bricks;

(6) Indoor environment testing data.

(7) Quality acceptance record of decoration and decoration project.

10. Waterproofing project

(1) Raw material certificate, on-site inspection record, and re-examination report;

(2) treatment of base layer or leveling layer;

(3) construction quality of waterproof layer;

(4) construction quality of insulation layer (including the setting of exhaust duct);

(5) construction quality of detailed structure;

(6) functional test or inspection record;

(7) quality acceptance record of waterproofing project.