2022 Level 1 Construction Engineer Examination , the most important issue for candidates in Level 1 Construction Engineer is how many points they can get. In order to facilitate candidates to understand their exam situation in a timely manner and make good work or study arrangements for the next step, Dali Education will promptly organize the latest information on the answers to the real questions after the first-level construction engineer "Mining Practice" exam for candidates to check the answers and estimate their own scores. Candidates are advised to continue to pay attention to the first-level construction engineer channel of Dali Education.

"Mining Practice" Answer Analysis

1. During winter construction, the time after concrete mixing should be compared with the time after concrete mixing at room temperature ()

A. Shorten 25%

B. Shorten 50%

C. Extend 25%

D. Extend 50%

[Answer] D

[Analysis]

0 low-temperature concrete mixing time is usually 1.5 times the room temperature mixing time.

[Examination point] Working characteristics of concrete materials in mining engineering

(P36)

2. When filling soil in layers, each layer of filler can choose the water content that meets the requirements ()

A. gravel soil

B clay soil

B clay soil

C. Sand soil

D. Expanded soil

[Answer] B

[Analysis]

Clay soil with water content meeting the compaction requirements can be used as fillers in each layer; silt and silt soil are generally not used as fillers. In the soft soil layer area, if it meets the requirements, secondary parts can be filled.

[Examination test point] Basic requirements for filling and pressing implementation (P60)

3. The limit of the probability of quality inspection and sampling error judgment for important items is ()

A.1%

B.3%

C.5%

D.10%

[Answer] C

[Analysis] There is a probability of misjudgment or misjudgment in sampling and judgment. In the inspection of important items, the probability of misjudgment (marked as a, called the risk of the producer) and the probability of misjudgment (marked as β, called the risk of the user) are both limited to less than 5%.

4. In the underground belt conveyor tunnel, the branch pipe and valve are set up in the fire pipeline separation ().

A.50m

B.100m

C.150m

D.200m

D.200m

[Answer] A

[Analysis] Branch pipes and valves must be set every 100m in the underground and fire-fighting pipeline systems, but branch pipes and valves should be set every 50m in the belt conveyor tunnel.

5. The wellbore stressed steel bar The reinforced concrete component arranged on the upper part of the cross section is ()

A Ground beam

B. Zhouliang

html l1C.C cantilever beam

D. Liner beam

[Answer] C

[Analysis] The main reinforcement bars are arranged in the tensioned parts of the component, such as the lower part of the beam and the upper part of the cantilever beam.

6. Total price measures The basis for determining project fees is ()

A. Construction organization design

B Design estimate

C. Material price information

D. Feasibility study report

[Answer] A

[Analysis] For construction technical organizational measures, you can refer to the construction organization design and related documents of a single project, and prepare it in combination with the actual situation of the project.

7. The project to be monitored for the slope project of the required mine with a safety level of Class I is ()

A surface horizontal displacement

B. Support structure stress

C. Groundwater

D. Rainfall

[Answer] A

[Analysis] The surface horizontal displacement belongs to the slope project of the required mine with a safety level of IⅢ, and the project to be monitored.

8. The main and secondary vertical shaft of a certain mine is located in the center of the well field, and the return air inclined shaft is located at the northern border. The mine's development method is ()

A. Vertical well development

B. inclined shaft

C hybrid development

D. Comprehensive development

[Answer] D

9. The construction period of a new mine is 14 months, and the construction task of the first working face is completed in 20 months. After 3 months of operation and 6 months of trial production, the mine is officially put into production. The production period of the mine is ()

A.23 months

A.23 months html l5

B.26 months

C.29 months

D.43 months

[Answer] C

[Analysis] From the official start of the project (the mine starts with any wellbore on the key line), to the completion of part of the working face, and after trial operation, the formal production is the mine starts.

10. Fixed in the lower layer of the well-drilling hanging tray and applying the most common rock grabbing equipment ()

A long rope rock grabbing machine

B. Ring track rock grabbing machine

C. Center rotary rock grab machine

D. Wall-type rock grab machine

[Answer] C

[Analysis] Currently, the central rotary rock grab machine is most commonly used, and it is fixed on the lower plate or rope tray of the hanging disk. grab uses variable mechanism for radial movement, rotary mechanism for circular movement, and uses lifting mechanism to move the grab till up and down through suspended steel ropes to grab rock.

11. The mining area measurement control network should adopt ()

A. National 3-degree Gaussian plane rectangular coordinate system

B. Inner mining area coordinate system

C. Independent coordinate system

D. Building coordinate system

[Answer] A

[Analysis] A mining area should adopt a unified coordinate and elevation system. In order to facilitate the mutual utilization of measurement results, the National 3-belt Gaussian plane cartes coordinate system should be used as much as possible to form part of the national level control network. Under special circumstances, the mining area coordinate system of any central meridian or average elevation surface of the mining area can be used. When the mining area is less than 50km and there is no possibility of development, an independent coordinate system can be used.

12. immersed tube casting pile construction, the technical requirements for immersed tube are ()

A. High-enhancing and heavy-pressing

B. Secret hammer low-pressing

C. Secret hammer slow-pressing

C. Secret hammer slow-pressing html l3

D. Back-inserting multiple

[Answer] C

[Analysis] When immersing the tube, it is required to low hit the hammer and "low lift and heavy hit the hammer"; when is extracted, requires·手机 (vibration) and slow pumping", requiring uniform speed during the tube extraction, and at the same time, keep the concrete in the tube slightly higher than the ground.

13. Compared with detonation tube detonation method, the advantages of the power detonation method are ()

A. Not affected by stray current

B. There will be no premature explosion burst

C. Detonation segmentation is flexible, the network is simple

D. The network can be checked by instruments and

[Answer] D

[Analysis] The biggest feature of the power detonation method is that before explosion, the instrument can be used to check electric detonator and test the network to check the construction quality of the network, thereby ensuring the accuracy and reliability of the network; in addition, the power detonator network can be detonated from a long distance and control the detonator time, adjust the detonator parameters, and realize segmented delayed detonator detonator detonator detonator detonator.

14. The distribution room 's waterproof level is ()

A. First-level

B. Second-level

B. Second-level

C. Level 3

D. Level 4

[Answer] A

[Analysis] The waterproof level of the distribution room should be first-level waterproof.

15. The depth of the gun hole in the underground blasting operation of coal mines is 2000mm. The length of a certain sealing hole should not be less than () A.250mm

B.300mm

C.450mm

D.500mm

[Answer] D

[Analysis]

① When the depth of the gun hole is less than 0.6m, medicine should not be charged or blasted; under special conditions, such as digging the bottom, brushing the rack, picking the top, etc., when the blast hole with a depth of the gun hole is less than 0.6m, the gun mud should be covered and safety measures should be formulated.

② When the depth of the gun hole is 0.6~10m, the length of the sealing should not be less than one-half of the depth of the gun hole.

④ When the depth of the gun hole exceeds 1.0m, the length of the mud sealing should not be less than 0.5m.

④ When the depth of the gun hole exceeds 25m, the sealing length should not be less than 1.0m

16. The excavation of the bedrock section of the inclined shaft should be marked ()

A. The pneumatic pick is not used rock breaking

B. The inclination angle of the bottom gun hole should be appropriately greater than the inclination angle of the inclined shaft

B. l3

C. The groove eye and the surrounding eye should be detonated at the same time

D. The loader cannot be used to discharge slag

[Answer] B

[Analysis] Pay attention to the hole drilling and blasting method of drilling and blasting in the bedrock section of the inclined shaft. The inclination angle of the blast hole at the bottom of the inclined shaft should be appropriately greater than the inclination angle of the inclined shaft to prevent the bottom plate from being dug.

17. The sub-projects in wellbore construction include ()

A. Well neck

B. Excavation

C. Freezing

D template

D template

D template

html ml0E. Concrete support

[Answer] B, D, E

[Analysis] The sub-projects of the well body project are excavation, formwork, steel bars, concrete support, anchor support, prestressed anchor cable support, jet concrete support, reinforced mesh jet concrete support, steel fiber jet concrete support, precast concrete support, stone support, etc.

18. In mine engineering, special operations include ()

A. Blasting work

B. Ventilation work

C. Mechanical work

D. Gas drain work

E.Transporter operator

[Answer] A.B, D

[Analysis] Gas inspector, blasting worker, ventilation worker, signal worker, can holder, electrician, metal welding (cut) mine pump worker, gas pump worker, main fan fan worker, main hoist worker, winch worker, Conveyor Operators, tailings miners, safety inspectors and motor vehicle drivers in the mine should receive special technical training. Only after passing the assessment and obtaining the operating qualification certificate can you take up the job

19. Determine the inspection method according to the sampling form, which can be divided into ()

A. Full inspection

B Sampling inspection

B l5

C. Exempt inspection

D. Random inspection

E. Develop inspection

[Answer] A.B, C

[Analysis] According to the inspection method determined by the sampling form, it can be divided into full inspection, random inspection, and exemption.

20. In the design stage of mining engineering projects, the factors affecting project investment include ()

A total floor plan design

B. Unit project** Project design

C. Construction location selection

C. ml5

D. Process design

E. Architectural design

[Answer] A.D, E

[Analysis] The factors that affect engineering investment in the project design stage include overall graphic design, process design, and architectural design.