2023 supervision engineer case gold test points Claims caused by force majeure, director must test points, long press to like + forward + comment for continuous updates, click on my avatar in the Wendang version and send me a private message: 2022
(1) Permanent project, has been shipped to the construction site Damage to materials and engineering equipment, as well as third-party casualties and property losses caused by project damage shall be borne by the employer;
(2) Damage to the contractor's construction equipment shall be borne by the contractor;
(3) The employer and the contractor shall bear their respective personal casualties and property losses. Loss;
(4) If force majeure affects the contractor's performance of its obligations under the contract and has caused or will cause a delay in the construction period, the construction period shall be postponed. The cost and loss caused by the contractor's suspension of work shall be reasonably shared by the employer and the contractor. The workers' wages that must be paid during the suspension period shall be borne by the employer. ;
(5) If the construction period is delayed due to force majeure or will be caused, and the employer requires rush work, the increased rush costs shall be borne by the employer;
(6) During the shutdown period, the contractor's costs of taking care of, cleaning and repairing the project according to the employer's requirements shall be borne by the employer.
[Typical test method]
Event 5: In the 8th month of project construction, a force majeure event occurred. The confirmed losses are:
① loss of 200,000 yuan for the permanent project under construction;
② loss of 32,000 yuan for equipment entering the site to be installed;
③ loss of 80,000 yuan for idle construction machinery and equipment;
④ project cleanup cost 50,000 yuan.

Question:
4. Regarding event 5, point out the parties responsible for each loss one by one (not considering project insurance ). How many million yuan of losses should the construction unit bear? (Calculation results are kept to
2 decimal places)
answer:
4. (1) ① The loss of 200,000 yuan for the permanent project under construction should be borne by the construction unit;
② The loss of 32,000 yuan for equipment entering the site to be installed should be borne by the construction unit;
③ The loss of 80,000 yuan for idle construction machinery and equipment should be borne by the construction unit;
④ The cost of project cleanup is 5 Ten thousand yuan should be borne by the construction unit;
(2) The loss borne by the construction unit = 20 + 3.2 + 5 = 282,000 yuan