In the face of the sudden outbreak of the epidemic, the Changdu Branch of China Mobile Tibet Company followed the instructions of the Autonomous Region Party Committee, Group Company and Tibet Company, actively responded to the call of the Changdu Municipal Party Committee and Municipal Government, took the initiative to assume corporate social responsibility, and took action as soon as possible. It immediately formed a "Sanjiang Pioneer" emergency support team with Comrade Zeng Jiang, Party Secretary and General Manager of the branch as the group leader, and a total of 12 party members and backbone employees of the Network Department, fully carrying forward the "Old Tibet Spirit" and "Two Roads Spirit", build a solid security guarantee line for network communication , and make every effort to ensure smooth communication, and contribute mobile power to resolutely win the annihilation war of the epidemic prevention and control battle.
Make every effort to solidify key points network communication guarantee
htmlOn August 10, in order to fully implement this communication guarantee work. The Sanjiang Pioneer Team of the Changdu Branch fully plays the role of an exemplary pioneer and takes the initiative. completed the quality optimization of 4 key hospitals and square hospitals networks as soon as possible, ensuring the smooth operation of nucleic acid detection points network. and organized party member volunteers to assist epidemic prevention staff in information registration, publicity of epidemic prevention knowledge, order guidance and other complicated matters, which improved the sampling efficiency of medical staff, reduced the waiting time for the masses, and calmed down the anxiety mentality.
Volunteers assisted epidemic prevention staff in scanning the code
htmlOn August 11, the Sanjiang Pioneer Team took the initiative to investigate the st square hospital network coverage and formulated a detailed communication guarantee plan. The opening of the new 4G base stations of the A and B cabins of the square hospital were completed at 23:56 that night, eradicating the problem of weak coverage in some areas of the square hospital. On August 12, a special person was arranged to conduct network optimization tests on the A and B cabins of the square cabin hospitals. The A cabin 4G download rate was 81.33M and the 5G download rate was 532.77M. The B-cabin 4G download rate is 88.97M, and the 5G download rate is 621.81M. There are no weak coverage points on site tests, all call services are normal, and there is no call drop. Other Internet services (such as: , Douyin, , Weibo, etc.) can be used normally. On August 16, the Chamdo Branch led the operators to open two dedicated lines in the temporary hospital and placed two gigabit routers on site, so that the temporary hospital could officially connect to the wired Internet network, and medical personnel and patients could share convenience and ergonomic efficiency with WIFI. During this period, the Changdu Branch has opened a total of 2 new base stations, 2 dedicated lines, dispatched 36 support personnel, 12 vehicles, deployed 1.2 kilometers of optical cables, expanded base stations, and optimized 8 points.
Sanjiang Pioneer "Flat Hospital" network test
8 On August 16, Sanjiang Pioneer on-site investigation Maternal and Child Health Hospital network coverage. First, deploy and formulate plans in advance. completed the opening of the 4G base station of the underground first-floor parking lot and the hospital's important equipment cabin at 1:56 am, effectively solving the problem of weak coverage in some areas of the maternal and child health hospital; second is to regularly optimize to prevent problems before they occur. On August 17, a special person was arranged to conduct network optimization tests for maternal and child health hospitals, with an average download rate of 4G of 61.33M and an average download rate of 5G of 532.77M. There are no weak coverage points on the spot. The call service is normal, there is no call drop. The Internet service, watching videos, etc. are normal. Third, the epidemic is the command, and speed is the power. On August 18, the Chamdo Branch took the lead in opening an epidemic prevention cloud video line at the Maternal and Child Health Hospital, providing strong support for the municipal government's epidemic prevention work.
Sanjiang Pioneer Team conducts late-night on-site investigation of the network coverage of maternal and child health hospitals
actively assists China Railway 10th Bureau project construction and epidemic prevention inspection
htmlOn August 23, the signal of the China Railway 10th Bureau Project Department of Jiba Village, Sichuan-Tibet Railway was interrupted, seriously affecting the construction progress of Sichuan-Tibet Railway construction and epidemic prevention inspection work. After learning the news, the Sanjiang Pioneer Team set out again. At 21:00 on the evening of the 23rd, went to , , optical cable failure repair and dedicated line relocation in Jiba Village, Basu County. However, at this time, the staff at the inspection site had already got off work and was unable to issue a 24-hour nucleic acid test certificate to pass the inspection station became a obstacle. Of course, with the support of the branch party committee, everything was ready to set off at 1 a.m. on the 24th.After 5 hours of bumpy road, the support team arrived at the periphery of Jiba Village, Basu County, and happened to encounter the project department of China Railway 10th Bureau being prepared to explode the mountain and expand the road. Because the road is narrow and long, it is only possible to pass quickly in small steps, so everyone has a clear division of labor, including carrying computers, tool kits, optical cables and other equipment.
"Sanjiang Pioneer" team ensures smooth living and residential communications of the Sichuan-Tibet Railway Project Department
Looking at the cracked mountains and falling pebbles, Comrade Song Changjun, who is the team leader, said: "Everyone is moving forward, protect themselves, and arrive at the destination safely." It was already 9 a.m. the next morning.
"Due to the night of travel and high altitude cold and hunger, we are all dizzy and hungry, but when we think of 'the epidemic is an order', we must persist and carry forward the spirit of old Tibet. In a special period, we will do our best to solve the problems of the people and demonstrate the responsibility and responsibility of mobile people," Comrade Song Changjun said with emotion.
So after using mineral water and bread to fill the hunger, the team was quickly divided into two groups. One group went to the mountain to repair the optical cable, and the other group went to the special line of the China Railway 10th Bureau Project Department to relocate. At 11:00 noon on the 24th, the relocation of China Railway 10th Bureau's dedicated line was completed, and a 300-meter optical cable was laid out and a new gigabit router was replaced. At 12:00 noon, after three hours of crossing mountains and ridges and overcoming obstacles, the emergency repair team completed the task of repairing two interruptions in optical cables and laying 200-meter optical cables. The mobile signal and dedicated line of the China Railway 10th Bureau Project Department can be used normally again.
China Railway 10th Bureau expressed his sincere gratitude to the branch's support team. They said excitedly: "I didn't expect that in the case of so strict epidemic prevention and control, the emergency repair and relocation of China Mobile Chamdo Branch was so fast. This made us see China Mobile's efficiency and determination to do practical things for the people." He also expressed his hope that the Chamdo Mobile Branch and China Railway 10th Bureau will work together to build the Sichuan-Tibet Railway and contribute their own strength to the socialist new Tibet. After a short rest, the time limit requirements for the 24-hour nucleic acid test report during the return inspection will not exceed, and social resources will not be wasted. The Sanjiang Pioneer wiped his dusty face a few times, supported his tired body and embarked on the way back. Of course, when I thought of being able to contribute to the "Century Project" Sichuan-Tibet Railway and making due contributions to the epidemic prevention work of Changdu City , my smile and fighting spirit appeared on their firm faces again.
Editor: Zhang Quanli
Editor: Ciren Pingcuo
Source: Changdu Branch
Source: Changdu Branch