5 road design bidding

01

Tingzhou Road (Xinzhou Road-Linping Avenue)

project investment estimate is 25.76 million yuan, project budget 2394 Ten thousand yuan, of which the construction and installation cost is 9.8 million yuan. The construction scale starts from Linping Avenue in the south, passes through Hefeng Branch Road, and ends at Xinzhou Road. The total length of the road is about 310m, and the standard section red line is 18 meters wide.

02

Dongzhou Road (Lushuiwan-Hongfeng Road)

project investment estimate is 50.33 million yuan, and the project budget is 27.9 million yuan, of which the construction and installation cost is 20.291949 yuan. The construction scale: the total length of the road is 490 meters, and the standard road width is 18 meters.

03

Tingzhou Road (Tianhe Road-Linping Avenue)

project investment estimate is 28.11 million yuan, and the project budget is 2674 Ten thousand yuan, of which the construction and installation cost is 12.27 million yuan. The construction scale starts from Linping Avenue in the north and ends at Tianhe Road in the south. The end of the project intersects with the already built Tianhe Road. The total length of the road is about 327m, and the standard section red line is 18 meters wide.

04

Shun Road (Kangtai Road ~ Tushanba Road)

project investment estimate is 31.61 million yuan, and the project budget is 15.83 million yuan, of which the construction and installation cost is 10,000 yuan. The construction scale: the total length of the road is 346.46 meters, and the standard road width is 24 m.

05

planned branch road (Xinghe Road-Shunfeng Road)

project investment estimate is 69.29 million yuan, and the project budget is 3782 Ten thousand yuan, of which the construction and installation cost is 31.086879 yuan. The construction scale: the project runs east-west, with Shunfeng Road in the east, the Lansai plot in the south, Xinghe Road in the west, and the transfer plot in the north. The total project area is approximately 11,559 square meters (17.3385 acres).

5 road location indications