Source: CCTV News Client
August 14, the reporter learned from the Traffic Management Bureau of the Inner Mongolia Public Security Department that on August 14, 2022, the bridge on G6 Expressway (K573) was affected by rainfall and mountain torrents, causing safety hazards and does not meet the conditions for safe passage. The traffic management department has implemented emergency traffic control in both directions of Saraqi to Meidaizhao section (K560-K580). All vehicles passing through this section should be passed according to the following traffic organization methods:
1. Vehicles passing from Baotou to Hohhot will be collected by the west of G6 Saraqi (K580). Fei Station will drive off the highway early and detour through National Highway G110;
2. Vehicles passing from Hohhot to Baotou will drive off the highway early and detour through National Highway G110;
3. The traffic management department of the public security organs will adjust specific traffic organization measures in a timely manner based on the actual situation of road traffic and emergency repairs;
4. Please drive motor vehicles passing through this section to drive carefully, avoid traffic controlled sections, and plan the detour route in advance to obey the command of on-site police and managers.

(Central Taiwan reporter Hu He Muren, Wang Xuanao, Ma Yuqing)