Standing on the Hangzhou-Jiahu Plain, looking around, the scenery of "protecting the fields with green" is everywhere. Today, June 25th is the 29th National "Land Day", and the theme of publicity is "strictly protecting arable land, saving and intensive land use."

2025/06/0905:28:38 hotcomm 1943

Standing on the Hangzhou-Jiahu Plain, looking around, the scenery of "protecting the fields with green" is everywhere. This scenery of the fields and the water are connected, and the roads are even more common in Haining . Today, June 25th is the 29th National "Land Day", and the theme of publicity is "strictly protecting arable land and saving and intensive use of land."

In recent years, our city has taken the lead in the province to implement the comprehensive land improvement work of the whole region, helping to protect the quantity, quality and ecology of cultivated land and rural revitalization and development, deepening the construction of the national land conservation and intensive "four innovations" demonstration points for land conservation and intensive optimization and refined management of the life cycle of industrial land, and accelerating the digestion and utilization of batch but not supplied to promote high-quality economic development in the city. In 2018, our city added 5,094 mu of arable land, rebuild 3,156 mu of standard farmland, and built 42,800 mu of high-standard farmland, achieving balance of farmland occupation and total amount for 22 consecutive years. It has been excellent in the assessment of the arable land protection responsibility target for Jiaxing City . The provincial comprehensive land improvement and ecological restoration site meeting was held in our city. Due to the comprehensive land improvement and ecological restoration project in the whole region, the conservation and intensive use of land, the approval of land but not for land digestion and utilization, and the disposal of idle land has been done practically and achieved significant results. It has been commended by the provincial government and will also be rewarded with the new construction land planning indicators.

One place of water and soil nourishes the other people. In the future, our city will continue to adhere to the priority of ecological protection and resource conservation, adhere to the equal emphasis on protecting resources and ensuring development, accelerate the construction of a natural resource management system, mechanism and utilization method to promote high-quality development, and serve to ensure the sustained, stable, healthy and high-quality development of the city's economic and social undertakings.

Standing on the Hangzhou-Jiahu Plain, looking around, the scenery of

Comprehensive implementation of comprehensive land improvement in the whole region illuminates the dream of rural revitalization

Last year, our city took the lead in carrying out comprehensive land improvement and ecological restoration projects in the province. Through comprehensive rectification of all factors such as "field, water, forest villages", we implemented the "six major arable land protection projects" such as urban and rural construction land reclamation, arable land reclamation, and drought-to-water conversion to water to promote the rational layout of production, life and ecological land.

In the process of comprehensive land remediation in the whole region, our city selected plots with excellent public resource allocation such as village layout and community services as the overall relocation gathering point to comprehensively improve the living environment and living conditions of the relocated people, and do a good job in people's livelihood; combined with mine restoration, five-water co-governance, pastoral cleaning, and four-good rural road construction work, coordinate the overall regional protection, systematic restoration, and comprehensive governance, significantly improve the ecological environment within the region, and do a good job in environmental work; effectively revitalize inefficient existing construction land, and invest in the surplus indicators of the increase and decrease of urban and rural construction land generated at a discount to participate in the municipal "enclave" group development project, and do a good job in revitalization. A set of data from

shows that since 2018, our city has approved the implementation of 17 comprehensive land remediation of 83,500 mu of land in the whole region, of which 9,000 mu of reclaimed 9,000 mu of cultivated land was reclaimed and 5,000 mu of cultivated land was reclaimed, and 15,000 mu of permanent basic farmland preparation area could be added. In addition, three projects, Haichang Hengshan, Maqiao Minsheng, and Haizhou Jinlong Zhangdian, were included in the provincial demonstration projects in 2018. This year, six projects, including Maqiao Xintang, Xiqiao Xixi, Xucun Qianjin, Chang'an Xingcheng, Dingqiao Baosheng, and Haichang Yingfeng, were included in the provincial demonstration projects in 2018.

As one of the earliest places for comprehensive land improvement in our city, the total area of ​​the comprehensive land improvement project of Haichang Street Hengshan is 10,303 mu, and the current agricultural land is 7,500 mu, of which 5,300 mu are cultivated land. In recent years, the region has implemented comprehensive remediation of agricultural land, construction land and unused land in the region based on the land reclamation and the linkage platform for the increase and decrease of urban and rural construction land. After the rectification, 1,100 mu of new arable land can be reclaimed for construction land, 1,300 mu of land for land development and reclaimed, 150 mu of "drought water" and 2,500 mu of new permanent basic farmland preparation area; at the same time, the average area of ​​1,077 relocated farmers has dropped from the original 1.03 mu to 0.48 mu, forming concentrated and continuous arable land, greatly improving the concentration and continuous permanent basic farmland and further optimizing the land use structure in this area.

Through comprehensive land remediation across the region, the sleeping land has become the "real money" for rural development. The annual village-level collective economic income of Hengshan Community increased from 3.4981 million yuan in 2017 to 10.5159 million yuan in 2018, achieving a qualitative leap.

Deepen the efficient and intensive use of land to revitalize resources Land to generate gold

Land is an important factor resource for urban and rural development. Our city insists on taking the evaluation of yield-per-percentage benefits as the main line, market-oriented allocation as the theme, and government promotion as the main focus, and implements the "four-complete" new model of refined land management and intensive land use in depth. In June last year, the Ministry of Natural Resources’ Academic Seminar on “Land Saving China” with the theme of “Rural Revitalization, Green Development and Efficient Land Utilization” (2018) was held in our city.

In recent years, our city has continuously deepened differentiated management of land supply. In 2018, the city supplied 89 land for accessed projects, with a total fixed asset investment of 24.3 billion yuan. The industrial land transfer contract stipulates that the average floor area ratio is 1.36 and the average investment intensity of is 24.18 million yuan/mu. 69 4871 mu industrial projects will implement the per mu investment intensity, per mu sales, and taxed land transfer, and will be included in the "3+5+X" staged property rights management model; 8 307 mu industrial land will implement flexible transfer periods; 5 108 mu industrial land will be supplied by the "rental first and then transfer" method; 18 2559 mu industrial projects with strategic emerging industries, high technological content, and high land conservation and intensiveness, and 15 752 mu key service industries and village-level operating property projects will implement differentiated land price corrections.

If differentiated management of land supply is an important tool, then implementing the reform of the "standard land" system is another important measure. Our city has comprehensively promoted the transfer of "standard land" for industrial land and issued an implementation plan for the reform of "standard land" (trial). Last year, a total of 18 "standard land" were supplied. This year, 28 "standard land" were all sold for 1,401 mu of industrial land this year. The newly supplied industrial land transfer contract stipulates that the average floor area ratio is 1.57, and the average investment intensity is 4.13 million yuan/mu.

In order to further deepen the efficient and intensive use of land, our city promotes the market-oriented redevelopment of low-efficiency land. Last year, 42 1,291 mu of 1,312 mu of transfer and vacancy, court ruling and demolition vacancies were completed, and a total of 156 2,603 ​​mu of low-efficiency land was vacated; the annual database update of the annual low-efficiency land and the preparation of a new round of special plan for low-efficiency land redevelopment (2018-2027) was completed, and 3,042 mu of low-efficiency land redevelopment project registration was implemented.

At the same time, our city has piloted the creation of model towns and streets with intensive land and resources, organized the creation of model streets with intensive land and resources in Maqiao Street , formulated the creation implementation plan and assessment and scoring method, completed the organizational review of the creation of Maqiao Street, and played a demonstration and leading role in the city; exceeded the start-up and completion assessment of the Jiaxing special action, included 100 7,238 mu of Jiaxing special action assessment projects in 2018, 93 cases have been started, 6,837 mu of land has been started, with a plot starting rate of 93%, 110 completed projects with 3,906 mu of completed projects, 90 cases have been completed, 3,068 mu of land has been completed, and the completion rate of 82%, exceeding the assessment target task requirements of 90% of construction and 70% of completion.

Accelerate the digestion and utilization of land that has not been supplied to awaken the "sleepy" land resources

In recent years, as the resource and environmental carrying capacity is becoming increasingly saturated, our city has always attached great importance to tapping its own potential and accelerating the digestion and utilization of land that has not been supplied to. At the beginning of last year, it puts pressure on itself and proposed the goal of digesting more than 2,600 mu of land that has not been supplied to 2017 and previous batches of land that has not been supplied to 2,600 mu, making full use of existing policies and information technology, accelerating the digestion and utilization of land that has not been supplied to be purchased, revitalizing the "sleepy" land resources, improving the level of land conservation and intensive utilization, breaking the bottlenecks and constraints of land factors, and promoting the high-quality economic development of the city.

Last year, the city digested a total of 5,093 mu of land that had not been supplied in previous batches of batches but had not been supplied, and the actual area was reduced by more than 1,200 mu compared with the upper limit of control issued by the superiors. In the "Progress in the Disposal of Approved and Unused Land in the Province" (Issue 5) report, our city was named and praised as the only county-level unit.

This honor is thanks to the city's many measures to accelerate the digestion and utilization of land that has not been approved but has been promoted to promote high-quality economic development in the city.Last year, our city adapted to local conditions and took advantage of the situation, made full use of existing policies and information technology, conducted a detailed survey on the land approved but not supplied land across the city, and completed the land supply situation of nearly 2,000 plots of land approved in batches, separate site selection projects, and agricultural completion projects from 2009 to 2017, so as to ensure that the data is clear and the situation is clear. All data is built into a database and imported into the "one map" management information system of the mobile terminal, so as to facilitate comprehensive, fast and accurate grasp of the progress of the digestion of land approved but not supplied, so that each piece of land can fully utilize its economic and social benefits.

In addition, our city has implemented comprehensive measures to implement "four batches" in accordance with the method of "prescription" of each case and one policy, through improving procedures, accelerating the initial supply of one batch, revitalizing one batch in another, and systematic filing and canceling one batch, improving the speed of land supply approval, accelerating the pace of land supply, strengthening the full-process tracking service of the project, working together to promote the early implementation of imported projects, comprehensively promoting the digestion and utilization of land that has not been approved, and revitalizing "sleeping" land resources. Last year, a total of 5,093 mu of land that had not been supplied were digested throughout the year. In the past two years (2016-2017), the area that had not been supplied was only 500 mu, with a land supply rate of more than 95%, effectively ensuring the supply of land factors for economic and social development in the city. This year, our city will continue to carry out special actions to digest and utilize land that has not been approved, and strive to reduce the amount of land that has not been supplied by the end of 2018 by more than 40%.

hotcomm Category Latest News