With the improvement of living standards, people's requirements for doors and windows are constantly increasing. Doors and windows are not only tools for sheltering wind and rain, but also require their technical content, energy-saving and environmentally friendly, and other aspects. To be honest, broken bridge aluminum doors and windows profile industry is very profound for laymen.
decoration doors and windows installation is a small project, but once the decoration is not qualified, it will cause a lot of trouble. So what about those series of problems that need to be avoided?
1, aluminum alloy window slurry installation
Fix the slurry to the aluminum alloy window according to the requirements of the construction drawings, and ensure that the position is correct and the installation is firm.
2. Anti-corrosion treatment
When there are requirements for the anti-corrosion treatment of the outer surface of the door and window frames, the anti-corrosion treatment shall be handled according to the design requirements. If the design does not require it, you can apply anticorrosion coating or paste plastic film for protection.
3. Install the door and windows in place
According to the marked door and window positioning lines, install the aluminum alloy door and window frame. And adjust the horizontal, vertical and diagonal lengths of door and window frames in a timely manner to meet quality standards.
4, Fixation of Doors and Windows
When iron parts are embedded on the wall, the iron feet of aluminum alloy doors and windows can be directly welded firmly with the embedded iron parts on the wall, and the welding area needs to be anti-rust treatment.
Jingmei Aluminum Industry
5. Treatment of gaps between door and window frames and walls
Aluminum alloy doors and windows should be installed and fixed, and the gaps between door and window frames and walls should be processed in a timely manner according to the design requirements after passing the qualification.
6, installation of window sashes and door and window glass
Door and window sashes and door and window glass should be installed after the decoration of the opening wall surface is completed.
After the door and window frames are installed and fixed, the glass-equipped door and window sashes are installed into the frame slide, and the gap between the frame and the fan is adjusted.