Last time, I brought you preparations before decoration. This article will continue to let you understand the process after the official start of construction
Before the formal start of construction, you need to report to the property office~
Whether it is the new decoration of a rough house or the renovation of old houses, it inevitably involves the demolition and modification of the house layout.
Therefore, the first step in decoration is to remove and renovate the wall according to the design drawings
Notes on demolishing the wall:
Why is it said that hydropower engineering is the top priority in the home?
Because hydropower projects are also called "hidden projects". Electricity involves personal safety, while water is most likely to cause economic losses. After the subsequent project begins, once you find that there is a "hidden project" that needs to be repaired, then your trouble will come.
What is the main work of water and electricity renovation? You must know that although you don’t do it yourself, you have to have a clear mind for decoration.
ps: For the renovation of old houses, it is best to re-made water and electricity. On the one hand, it is the old water circuit to adapt to the new life, and on the other hand, it is also for safety considerations.
Hydropower renovation stage or before, the purchase of wall tiles and floor tiles can be arranged. After the water and electricity is completed, the following mud tiles can be carried out in time.
Mud tiles include: repairing pits for water and electricity troughs, floor leveling, waterproofing, laying floor tiles and wall tiles, etc.
In the mud and tile project stage, you need to buy the floor drain, because the tiling master needs to install the floor drain and cut and lay the floor tiles according to the shape and size of the floor drain.
After the mud project is completed, custom furniture service personnel such as cabinets and wardrobes can be arranged to go to the door to retest the size. Especially for embedded home appliances, the size of the home appliances must be determined at this time at the latest.
Pay attention to . Before sticking wall tiles and floor tiles, you need to say hello to the neighbor downstairs to conduct a water-closing test on the bathroom and balcony floor to prevent any problems with the waterproofing on the ground.
Carpentry includes the on-site construction and installation of all fixed cabinets in the house, such as:
△△ Cabinets in the kitchen
△△ Cabinets in the kitchen
△ Cabinets in the kitchen
△ △ TV cabinet in the living room
△△ Wardrobe in the bedroom
In addition, there are:
△△ Ceiling
△ The work of the paint part of the ceiling
mainly includes wall treatment, on-site hand-painting cabinet body painting, latex paint spray, or wall paper and wall cloth pasting, etc.
△ Twelve processes for Huaxun wall treatment
Please avoid rainy and humid weather for paint construction~
At this point, the hard decoration construction part of the decoration has come to an end. Below are some interior doors, customized cabinets, hood stoves, lamps, etc. installation and welcome various furniture and appliances:
If the house chooses wooden floor, be careful to lay the wooden floor before installing the interior door to avoid affecting the progress of subsequent processes.
Install indoor doors, curtains, bathroom sanitary ware, kitchen and bathroom integrated ceilings, etc.; furniture, appliances, soft decorations, etc. purchased by
can enter the market!
When all of the above is over, you can ventilate and wait for check-in. However, after checking in, you must still maintain ventilation to release the remaining formaldehyde.
How to ventilate to make formaldehyde dissipate faster? The editor has compiled some tips
√ Plate is a very important formaldehyde-containing body, so while opening the window for ventilation, don’t forget to open the cabinet door drawer
√ √ The best time to ventilate is during the day, and you must close the doors and windows at night
(heavy moisture at night, avoid harm to the decoration when entering the room)
√ is based on the premise that it does not harm the decoration effect itself, so it is not recommended to open windows for ventilation on rainy days; prevent frostbite in the wall in winter, and the best time to ventilate is in the morning: 10:00-4:00 pm
√ √ can use blowers and shaking fans to enhance air convection, but do not blow on the wall furniture all the time
√ High temperature weather is more conducive to formaldehyde evaporation, which is best in summer; in winter, you can turn on the heating equipment at home to increase formaldehyde evaporation (cannot be turned on for a long time)
√
√ √ formaldehyde is dissolved in water. You can also wipe the surface of the cabinet with a wet rag (try to wring it dry). It has a formaldehyde removal effect.
The above is the detailed decoration process. Do you feel a sudden enlightenment after reading it? Taking advantage of the good weather in this way, quickly put the decoration on the agenda~