Decoration is indeed a very professional thing, with complicated processes and many details. Even if you are careful, you will inevitably step on the minefield. After seeing it for too much, you will find that the pain points of some families have in common. Today, the 8-year-old

decoration is indeed a very professional thing, the process is complicated and there are many details. Even if you are careful, you will inevitably step on the minefield. After seeing it for too much, you will find that the pain points of some families have in common. Today, let html'18-year-old "old supervisor" sort out the "common problems" of decoration in four major Chinese families . The most common and easiest to ignore. Let's see if you are stepping on ?

common problems1.

Low floor Rebate

Rebate

Rebate

Rebate till the water is often seen in many families on the first and second floors. Once the water is blocked, the phenomenon of rebate at home always reminds me of the phenomenon of rebate water at home, and regrets why I chose the lower floor!

[Supervisory experience talk]

only need to do this during decoration tricks , so you can completely avoid the trouble of reflux:

) Renovate the sewer pipe during decoration, and can do independent drainage ;

) If it is not possible to do independent drainage, add an check valve to the kitchen sewer pipe position . It is recommended to choose the transparent style, which can be observed in a timely manner. Once the water rebate occurs later, close the valve immediately, which can effectively prevent the sewage from returning to the home.

▲Transparent check valve

*Note: High-rise owners do not have to worry about it. Ineffectively adding valves or remodeling is also a "waste".

common problems 2.

drawings are fast to construct, and only use scroll wheel

The importance of waterproofing is known to everyone, and they even watch the scene in person, for fear that problems will cause trouble to themselves and their neighbors in the later stage.

But everyone often focuses on the selection of waterproof material . ignores the construction details , which eventually leads to waterproofing in the corners of the gaps and not leaking well.

[Supervisory Experience Talk]

Although the roller construction speed is fast, the details are the easiest to be ignored. The reason is that the brushing construction uses rollers to apply a large area of ​​paint, and does not use a brush to repair the details!

Large-area waterproof coating House of wall and floor Be sure to allow waterproof construction workers to use brushes to brush them all according to the process requirements, so as to ensure bonding, better firmness, and no mistakes in waterproofing.

common problems3.

wall paint without drying open windows for ventilation

Open windows for ventilation is recognized as the best way to remove odor. But when doing this, it is easy to have a "common problem" of : wall paint has not dried out yet, so the windows are opened too early to ventilate, which speeds up the drying, causing cracking.

[Supervisory Experience Talk]

Do not rush to open the windows for ventilation after the wall material is painted, but should close the windows for a few days, Wait until all the wall paint is dried naturally, and then ventilate and disperse the smell , which will not cause the wall paint to crack, which is a "win-win".

common problems4.

Balcony Insulation layer tile directly posted on

Landscape balcony usually has an exterior insulation layer when building a house. However, many people choose to use it as a living balcony when decorating it. When repaving the tiles, they feel that there is no need to remove the insulation layer, and they can continue to play the role of the insulation of the wall.

Little do you know that such an operation directly violates the "common problem" of Chinese home decoration. The quality of tiles cannot be guaranteed and will gradually fall off later.

[Supervisory Experience Talk]

If you want to re-paint tiles on the balcony wall floor, you must remove the original insulation layer of the wall before construction, expose the original wall cement mortar surfaces, and do a good job of base layer before laying the tiles.