Living room line
pipeline is not very standardized and a bit messy.
bathroom pipeline
bedroom dual control
cement wall, it is a bit difficult to slot, cutting machine can't cut.
bedroom dual-control switch design
bathroom pipeline
bedroom heating pipeline
living room TV wall line
Afterwards, I felt that the sockets were installed a little too much, and I couldn't use too much. Why didn't I expect it at that time?
Restaurant heating pipeline
Radiator is installed later, and the width reserved by the pipeline is not very standard.
Kitchen Socket
Afterwards, I felt that the kitchen socket was designed a little small, but it was not so much used.
Kitchen pipeline
Bedroom dual control line
Bathroom
Bedroom socket
Bathroom door
Bathroom door
Construction building materials
Look back now, the original plan was not designed properly in some places.
Many things were thought to be reasonable when they were doing it. After finally completing it, I looked back and found that some places were not designed reasonably, and some were redundant.
So, friends who plan to decorate must study more before decorating. Deduce more, wherever you put and where you need to put, so that you can design according to your needs.
Many things are like this. Those in the authorities are confused and regret it after doing it.
is just like the water and electricity transformation plan we designed. Now it feels unreasonable, but there is nothing we can do, so we can only regret it.
didn’t find a professional designer at the beginning, but at that time, even if you were looking for a professional designer, there would definitely be some dissatisfaction afterwards.
is now taken out to recall it, hoping to inspire everyone’s decoration. Welcome to leave comments and decoration experience.