1. Common problems:

Floor heating floor stones are hollow

2. Cause analysis/standard requirements:

1. The ground is not leveled before installing floor heating;

2. The material of the floor heating pipe and the floor heating cushion are soft and easy to deform;

3. The surface stone is too thin and the thickness Not up to standard;

4, the base construction is not up to standard, resulting in cracking of the base layer;

5, the thickness of the filling layer is insufficient, expansion joints are not set , the setting of steel mesh is unreasonable;

6, Cement mortar cannot withstand the hot and cold stress of heating pipes, and the excessive shrinkage ratio causes the cement mortar to separate from the floor tiles, thus forming a hollow;

7, maintenance is not in place.

3. Prevention/solution measures:

  1. In order to prevent the ground base from cracking, lay steel wire mesh before making the floor heating protective layer, and then carry out the protective layer construction;
  2. The thickness of the filling layer should be according to the "Technical Regulations for Radiant Heating and Cooling-JGJ142- 2012》3.2.7 (picture below); Expansion joints must be left when the floor heating installation project is longer than 6m;

Disclaimer: This article only represents the author's own views and is for learning and communication purposes only. - DayDayNews

  1. The stone, adhesive, insulation board and other materials used must meet the requirements, and the product can only be used after it is qualified;
  2. Filling layer thickness 3~5cm, set up 10*10m low carbon steel wire mesh sheets and tie them with heating pipes, and set up expansion joints every 6m;
  3. strengthen concrete curing. Cement hardens in a non-dry or humid environment, which can fully hydrate the cement particles, not only strengthen the hardening speed but also improve the surface strength, effectively preventing dry shrinkage cracks.
  4. After the stone is paved, the finished product should be protected and no one is allowed to use it within 3 days; wet mopping should be avoided during later use.

Disclaimer: This article only represents the author's own views and is for learning and communication purposes only. - DayDayNews

Floor heating floor node diagram

  • Problem picture:

Disclaimer: This article only represents the author's own views and is for learning and communication purposes only. - DayDayNews

  • Correct picture:

Disclaimer: This article only represents the author's own views and is for learning and communication purposes only. - DayDayNews

home Category Latest News