Central air conditioner\Tivision machine
Purchase time: Before starting construction
If you choose to install central air conditioner and duct light equipment, you need to communicate with the designer during the design stage, determine the total price of the installation, and avoid additional items.
bridge aluminum doors and windows
purchase time: Before construction starts
bridge aluminum doors and windows have a production cycle, so you need to communicate with the manufacturer in advance to install the frame and the time to install the glass (double-layer or other).
Temporary toilet\door cover protection
Purchase time: Before construction,
Generally, there are few public toilets in the community, and temporary toilets are very convenient. If the entrance door is not changed, you need to be protected.
Cabinet Customized
Purchase time: Before starting construction
Considering the design of functional partitions, the brand should be determined before the water and electricity transformation, so that the designer can initially measure the size and determine the location, electrical appliances and waterway locations.
wall tiles floor tiles
Purchase time: Before the water and electricity enter the market,
After the water and electricity trough is completed, you can start ordering the tiles before the tiles are laid on them, so you must choose a very good tiles.
pre-filter
Purchase time: Before the water and electricity enter the market,
pre-filters must be installed. You must buy them before the water and electricity master enters the market, so as to determine the installation location, and there will be additional charges for installation.
Wires\Water pipes
Purchase time: Before the water and electricity enter the market,
communicate with the water and electricity master and need to reserve sockets and water and electricity solutions. Then you can purchase water pipes and wires according to the list you have opened (both online and offline)
waterproof material
Purchase time: Before the tileworker enters the site
shower area should be brushed above 1.8 meters in other areas, brushed more than 30cm, at least twice, one horizontal brushed and one vertical brushed.
Floor Heating
Purchase time: Water and electricity end
You need to look at the entrance door height to see if the door height is to increase or backfill-free floor heating to prevent additional items.
check valve
Purchase time: Before the bricklayer enters the site,
Buy a flue check valve in advance to prevent the neighbors from cooking later, and your house is filled with oil smoke. The tiler must install the bricks immediately after laying them.
Floor drain
Purchase time: Before the tiler enters the site, small hardware such as
Floor drain can be selected and purchased online, and the tiler can be installed directly when laying tiles.
sound insulation cotton
Purchase time: Before the bricklayer enters the site,
sound insulation cotton is really important. It can effectively reduce the sound of water in the sewer. You can pack it yourself, which can save a lot of money and the operation is very simple.
Embedded home appliances
Purchase time: Before whole house customization
If you want to embed home appliances into the cabinet, you need to reflect the purchase of good home appliances and inform the designer of the size of home appliances to avoid the inappropriate size during later installation
Making cabinet materials
Purchase time: Before making a cabinet
Purchase time: Before making a cabinet
Purchase time: Before making a cabinet
Purchase time: Before making a cabinet
Purchase materials
Purchase time: Before making a cabinet
Purchase materials
Purchase materials
Purchase materials
Purchase materials
Purchase materials
Purchase materials
Purchase materials
Purchase materials
Purchase materials till the cabinet are prepared, and you need to buy the materials for making the cabinet in advance, such as cabinet body, door panel, edge sealing strips, hardware, etc.
Putty\Latex Paint
Purchase Time: Before the oil worker enters the site,
Purchase putty, latex paint, etc., be sure to buy it at the official authorized store. Do not buy it in stores that sell many brands, as it may be fake.
Floor protective film
Purchase time: Before ceiling
Be sure to buy floor bread protective film in advance. After floor tiles are laid, they can effectively protect the tiles and prevent scratches on the ceiling from being scratched by furniture.
Ceiling material
Purchase time:Ceiling material
If the floor height is less than 2.8 meters, it is recommended that you do not make suspended ceilings, or simple ceilings, such as double eyelid ceilings. Drywall, keel, etc.
Light strip aluminum groove
Purchase time: Before ceiling
If you are sure to have a ceiling and install a light strip, you must first buy aluminum lamp groove and downlight spotlight so that workers can open holes and slots according to their size.
Glass glue\Seaming agent
Purchase time: Installation stage
Select large brands of glass glue and seam-beautifying agent, the quality is guaranteed, cheap glass glue has a strong irritation, formaldehyde content exceeds the standard, and the time is long It is easy to yellow and mold
switch panel\Lighting
Purchase time: Installation stage
Purchase panel and lamps. It is recommended to buy it online, with many types, many styles, and it is also cheap. Choose an official store, and the quality is guaranteed.
Home appliances\Furniture
Purchase time: Installation stage
Smart toilet, water heater, TV, bathroom. Cabinet, refrigerator, washing machine, range hood gas stove, bed, sofa, dining table, etc., all soft furnishings enter