Plate air preheaters are often used in many industries such as petrochemical, metallurgy, electricity, food drying, and medicine. The flue gas produced is preheated and recovered, especially in the power generation industry, which is prone to white smoke plumes. The installation

2025/03/2915:11:35 home 1279

plate air preheater is often used in many industries such as petrochemical, metallurgy, electricity, food drying, medicine, etc. The generated flue gas is preheated and recovered, especially in the power generation industry, which is prone to generate white smoke plume . The installation of plate air preheater can greatly reduce the export of Wendy and improve the heat exchange efficiency. Installation steps of

plate air preheater: The installation of

air preheater requires strict compliance with the installation drawings. Pay attention to the installation direction of each module during the installation process. When installing, first lift the supporting steel structure of the equipment to the civil construction foundation, connect anchor bolts, and calibrate the equipment to ensure stability. Then lift the heat exchange module and maintenance section in order from bottom to top, adjust the position to ensure the sealing of the equipment, and connect the position bolts first and then weld them.

Plate air preheaters are often used in many industries such as petrochemical, metallurgy, electricity, food drying, and medicine. The flue gas produced is preheated and recovered, especially in the power generation industry, which is prone to white smoke plumes. The installation  - DayDayNews

Plate air preheater

sequentially lifts the short sections of the medium inlet and outlet, seals and welds with the frame, and the structure has been insulated internally when it leaves the factory. After installation, check the insulation condition and repair it, and connect the corresponding instrument pipeline. Before leaving the factory, the equipment will generally choose to apply anticorrosion primer . If it is not applied, it should be applied after the equipment is installed, and the interface should also be repaired.

The basic installation has been completed so far. The connection surfaces of each module are inspected according to the relevant acceptance standards, and can only be used after passing the acceptance.

or above is the full introduction to the installation steps of the plate air preheater. I hope the editor’s article will be helpful to you. If you know more about air preheater knowledge, please keep paying attention.