It coincided with the handover of the house in the community, and I met the owner by chance in the community. I happened to help the owner with the whole house inspection. The owner was quite busy at work, so he usually went to the new house after get off work to discuss the plan

2025/01/0723:36:32 home 1454

happened to be handing over the house in the community, and he met the owner in the community by chance, and happened to help the owner inspect the whole house. The owner was quite busy at work, so he usually went to the new house after get off work to discuss the plan, and the contract was signed smoothly. Sometimes I think that such a smooth signing is really the fate of fate. Later, when I talked about this with the owner, the owner said that it depends on the eyes and the face. I'm so lucky to have a face that catches people's eyes.

The owner originally planned to do only three projects: civil engineering renovation, water and electricity, and bricklaying. However, due to the epidemic, family members came over, and the owner was also anxious to move in. Subsequent projects were also I was asked to take charge. The preliminary construction and communication went very smoothly. We understood each other and we became friends. The subsequent carpentry and painting were all at cost price.

The house is developed by Jinhui Real Estate. Small three-bedroom apartments of 88-105 square meters are very common. The owner purchased a house with a built-up area of ​​89 square meters and a condominium of 71 square meters.

It coincided with the handover of the house in the community, and I met the owner by chance in the community. I happened to help the owner with the whole house inspection. The owner was quite busy at work, so he usually went to the new house after get off work to discuss the plan - DayDayNews

It coincided with the handover of the house in the community, and I met the owner by chance in the community. I happened to help the owner with the whole house inspection. The owner was quite busy at work, so he usually went to the new house after get off work to discuss the plan - DayDayNews

Civil Engineering Renovation

1. Floor removal: Because floor heating was to be installed, the indoor clear height of the house was 2.7 meters. With floor heating, it would be lower. In order to increase the height, the floor was removed. After the floor was removed, the height increased by 7 centimeters, which is still very high. Considerable

2. The location of the outdoor unit on the balcony was removed, and the location of the blinds was removed

3. The kitchen wall was removed

4. The bathroom wet area wall is demolished, and then the red bricks are erected to build the wall. The thickness after painting is 7 cm. Compared with the conventional 13 cm thick single wall , it saves space

5. The dry area wall is demolished

More labor and water The cost of auxiliary materials such as sand, bricks and so on is 4800.00

Water and electricity project

1. The waterway is redone and solar energy is provided. The water supply pipes and sewer pipes are partially modified by Poly

2 circuits. Wire Far East flame retardant wire, wire tube poly flame retardant wire tube

3. Central air conditioning circuit

4. Weak current rearrangement

5. Bathroom drainage redo

6. Water and electricity drilling

or more labor and material costs 8400.00

waterproof

1. Bathroom waterproofing is painted to the top, the floor is flexible, and the walls are rigid.

2. Balcony and kitchen waterproofing brushes are 30 cm high, the floor is flexible, and the walls are rigid. The washing machine and sink are painted one meter high.

Materials and labor above 1 Fee 2600.00

Bricklayer

1. The whole house is paved with 80 floor tiles, only one in the bathroom door stone

2. All wall tiles are 30*60 in size

3. Sewer pipes and flues are included

4. The bathroom is backfilled

or more cement and sand materials Material and labor costs 9400.00

Other costs

Garbage removal freight, material handling fees, and management fees total 1800

The total price of the above five items of 27000.00 is not the cost price, but the transaction price with the owner.The following project expenses are items purchased by the owner

carpentry suspended ceiling

1, living room suspended ceiling with central air conditioning, curtain box

2, main bedroom with suspended ceiling around the central air conditioner, curtain box

3, central air conditioning ceiling in the second bedroom and guest bedroom, ceiling above the bookcase in the guest bedroom

material and labor cost 6000.00

paint

stucco stone Leveling with paste , three coats of putty

All white paint, bay windows without window covers

manual + plaster + putty + two buckets of paint (actually two buckets of paint were not enough, so I removed another bucket and used some, the excess is not included in the cost) Cost 5880.00

The remaining items

1. Central air conditioning 23800.00, first-tier brand

2. Floor heating 14680.00, first-tier brand

3. Ceramic tiles 6000.00, second-tier brand

4. Whole house customization 30900.00, local processing factory

5. Solid wood skirting 680.00, customization together with wooden doors

6. Beautiful seams 1500.00, Oriental Yuhong

7. Integrated ceiling: 1500.00, Lianpu, local brand

8. Three wooden doors + balcony and entrance door door covers 3900.00, second-tier brand

9, kitchen sliding door, bathroom door, shower partition, dry area partition 7000.00, local processing factory

10. Lamps 2800.00, online shopping

11. Electric ultra-thin clothes drying rack 1200.00, Lianpu, local brand

12. Furniture 9100.00

13. Double-door refrigerator 5800.00, TV 3 299.00, washing machine 3690.00, stove 1599.00, online shopping

14. curtains 3200.00, local processing

half package + self-purchased materials + furniture and appliances. The total cost is more than 164,000.