Before decorating, make sure to punch 5 holes first, and leak a lot of troubles in the later stage~
Don’t wait until the master reminds you to do it. In all likelihood, it’s too late. We can make it in advance. Doing a good job of preparation will save you worry and effort in the follow-up.
※The air-conditioning hole
must remember to open the air-conditioning hole in advance, regardless of whether you choose on-hook or cabinet!
If wall covering is pasted on the wall in the later period, when I think about drilling the air-conditioning hole, it will cause damage to the wall, especially the wall covering is easy to roll into the drill bit. If you pull a large piece of it, do you feel distressed? Distressed.
Although latex paint on the wall is a bit easier, but after repainting, it may not be 100% without color difference, especially when punching holes, most of the masters will use them to protect the bricks and walls. Water, latex paint walls are difficult to protect themselves.
※Gas pipeline embedded pipeline
involves the installation of gas water heater and stove, it is necessary to bury the pipeline in the wall in advance, with a diameter of at least 3.5cm.
If you don't let it be buried in the dark, you can only install it in the open. You need to punch through the cabinet or use the skirting line. For the specific situation, you can consult the property. Don't take it for granted.
※The hood hole
This point needs to be laid before the kitchen tiles, and the check valve will be installed later,If a hole is punched after tiling, it will easily collapse and increase the risk of falling off in the later stage. Generally, it needs to be 18~20cm in size.
If the developer has reserved it, there is no need to worry, but if the pipeline is reserved and there is no hole, you must handle it yourself. It is best to place it above the ceiling, which is more clean and beautiful. Well, it will not occupy the space in the wall cabinet.
※Bathroom Yuba
To install the bathroom heater, you need to open the hole before the ceiling and reserve about 10cm to install a check valve to facilitate the bathroom heater exhaust and ventilation, but this The point is not unique. After all, many bathrooms do not have this condition and need to be adjusted according to the actual situation.
※TV wall pipe
A good TV wall, no one wants to be damaged by the messy electric wires. In view of this, the master can embed pipes in the wall in advance. Make a 50cm hole and let the wires go inside, which will be more visually refreshing.
.