The first-time exam has been over a week, but when I think about it, it seems that I was yesterday.
Everyone has different arguments about the difficulty of the test questions . Some people say that the questions this year are biased and they have also tested the knowledge points that they don’t notice in normal times. Some people say that this year is not difficult, and you can review it steadily and carefully, and you will get 60 points.
So what is the level of the test questions this year? The editor specially collected exam analysis ↓↓↓
management subject
overall difficulty has risen, and the difficulty of the test will be significantly improved compared to the previous years' examinations.
overall test paper has increased by , but it is not difficult to test the knowledge points. The questions for are relatively , but the test points for are relatively , but the test points for are fixed. Most test teachers have explained them during the teaching process. It can be said that students who have followed the teacher seriously this year will have no problem with being stable.
specific examination and analysis, the test points cover comprehensive
This set of test papers has a comprehensive coverage of knowledge points, covering the regular test points of in chapters one to six .
1. In principle, there is no over-syllabus or super-textbook;
2. In terms of examination scope, the coverage is relatively wide, and the knowledge point examination is comprehensively penetrated into all detailed fields, paying more attention to the candidates' control over the entire textbook and the integration of knowledge content;
3. In terms of question type settings, increases The test intensity of comprehensive questions is , especially from the examination of the original text of the textbook to the conceptual understanding;
4. Content logic, interference items are designed with flexible design, and there are more questions that are chewed and snuggled with words and words , which emphasizes daily accumulation and understanding;
5. Examination frequency analysis, the distribution of the scores of the 2022 exam and the scores of the 21 years. Chapter 3 and Chapter 6 are the key tests, with a total of 48 points; Chapter 4 and Chapter 5 have fixed scores in previous years, with a total of 29 points; Chapter 1 and Chapter 2 have a relatively small score, with a total of 18 points.
Examination content analysis - for example
Must-test test points is tested every year, but the form and question method are slightly different, and you must master it and be able to apply it proficiently.
high frequency test points has a high frequency of examinations, so you need to focus on mastering them.
new test point has not been tested before, and will not become a high-frequency test point afterwards. The learning level requires understanding.
Importance: Must-test test points>High-frequency test points>New test points
①The total scores of the required test points involved in this set of test papers: 38 points
The required test points involved in the test paper are: Engineering cost (Question 1, Question 61) Project comprehensive cost management (Question 2), bidding and tendering method and its Implementation regulations (Question 6-7) Project composition (Question 11), turnover construction (Question 19-21, Questions 68), Engineering network planning technology (Question 22-24, Questions 69), Project contracting model (Question 15, Questions 66), Equivalent calculation (Question 28-29, Questions 70), Economic effect evaluation index system (Question 30-32, Questions 71), Project capital (Question 39), Project fundraising (Question 40, Questions 73), Project financing (Question 74), and the main methods of project financing (Question 43-44).
For example, Question 66 , which tests "engineering network planning technology" , which is a must-test content every year, with a test score of about 2 to 3 points.
This knowledge point belongs to the annual must-have test point , but the depth of the test is increasing year by year.This question mainly tests the degree of mastery of knowledge points and whether you can apply them proficiently.
②The high-frequency test points involved in this set of test papers are: 44 points
The high-frequency test points involved in engineering cost consulting enterprises are: legal liability for engineering cost consulting enterprises (Question 62), construction permit (Question 63), project quality warranty (Question 5), Civil Code Contract Section (Question 9, Questions 64), Engineering Construction Procedures (Question 12~14, Questions 65), Project Management Organizational Structure (Question 16), Project Construction Contract Management (Question 25~26), Uncertainty Analysis (Question 33, Questions 35), Value Engineering Methods (Question 36~37, Questions 72), Project life cycle cost (Question 38), Capital structure (Question 42),
Taxes related to engineering projects (Question 45~47), Insurance regulations related to engineering projects (Question 75), Project planning (Question 48), Economic evaluation of engineering projects (Question 76), Economic analysis of engineering projects (Question 77), Cash flow statement of investment plan (Question 49), Design plan evaluation (Question 78), Contract clauses in "Standard Construction Bidding Documents" (2007 edition) (Question 50~51), Preparing fund use plans according to project progress (Question 54), Construction cost management (Question 55, 57), cost deviation and its representation method (Question 56).
For example, Question 16 , which tests "Engineering Project Management Organizational Structure Form" . It has been tested three times in the past five years, and the test score is about 1 point.
Over the years, the focus of this knowledge point is relatively fixed. examines the advantages and disadvantages of an organizational form . This question directly gives a schematic diagram to examine the mastery of the schematic diagram of the organizational structure of the project management. The test points are fixed, but the inspection methods are more flexible and closer to reality.
③The new test scores involved in this set of test papers are: 13 points
new test points involved include: engineering cost management development (question 3), quality responsibility and obligations of supervision units (question 4), government procurement law (question 8), construction unit planning system (question 17), construction organization design (question 18 and 67), engineering project information management (question 27), design budget review (question 79), construction bid evaluation and award (question 52~53), project quality deposit reservation (question 58), and project claim management (question 80).
For example, Question 79 , which tests "Design Evaluation Method" , and the predicted test score is 2 points.
design estimate review and evaluation methods include multi-index method, single-index method, and multi-factor scoring method. The single index method is further divided into: comprehensive cost method, full life cost method, and value engineering method . This question examines the comprehensive cost method in the single index method. The questions are not difficult, but the question points are being examined year by year.