2022 Database - General Basics (Database) Question Bank is the new full examination question type of the Database - General Basics (Database) Examination Question Bank! 2022 Dataman-General Basics (Dataman) Test Questions Simulation Examination Platform Operational Based Dataman-General Basics (Dataman) Examination Textbook. Dataman-General Basics (Dataman) mock exam questions can be passed to pass the production safety simulation exam and quickly memorize the questions.

1. [Multiple choice question] Among the following positions, the positions responsible for the quality of safety facilities and equipment are (). (ABCE)

A, position responsible for the design quality of safety facilities

B, position responsible for the completion acceptance of safety facilities

C, position responsible for the quality of safety production equipment

D, position responsible for the factory inspection of safety facilities

E, position responsible for the construction of safety production equipment

2, [Multiple choice question] The picture below is a lighting floor plan of the ground floor of a certain office building (partial), indicating (). (ABC)

A, there are 3 groups of lamps in the room

B, each group of lamps

C, ceiling installation

D, ceiling installation

E, hanging chain lifting

3, [Multiple choice question] According to the provisions of the "Production Safety Law", the rights of practitioners in production safety are (). (ABCD)

A, right to criticize and report, right to accuse

B, right to know

C, right to emergency avoidance

D, right to obtain compensation

E, right to risk reporting

4, [Multiple choice question] Production and operation units have ( ) safety measures for production and operation units. (ABCE)

A, economic guarantee measures

B, technical guarantee measures

C, organization guarantee measures

D, legal guarantee measures

E, management guarantee measures

5, [Multiple choice question] Direct project fees include ( ). (ABC)

A, population fee

B, material fee

C, construction machinery usage fee

D, site fee

E, transportation fee

6, [Multiple choice question] Computer system software mainly includes (). (ABC)

A, operating system

B, language processing program

C, database management system

D, program library

E, software package

7, [Multiple choice question] Construction project management will only be implemented when the project scale reaches the following standards. (ACDE)

A, public buildings above 10,000 m2

B, industrial buildings above 20,000 m2

C, project investment of more than 5 million

D, project investment of more than 50 million

E, industrial buildings above 10,000 m2

8, [Single choice question] CPU refers to ( ). (D)

A, operator

B, controller

C, central processor

D, motherboard

9, [Single choice question] " pricing specification " stipulates: The bill of quantities should be (). (A)

A, comprehensive unit price valuation

B, unit price valuation valuation

C, both

D, neither

D, neither

10, [Single choice question] Among the following statements about waterproofing construction of coil materials, the wrong one is ().(D )

A. Before laying waterproof roll , the base layer treatment agent should be applied. The base layer treatment agent should be made of materials that match (compatible) with the performance of the roll, or the base oil of similar coatings

B. When laying polymer waterproof rolls, do not stretch too tightly to avoid coil in tensile stress state for a long time, which can easily accelerate the aging of the roll

C. The construction process is: leveling layer construction → waterproof layer Construction → Protection layer construction → Quality inspection

D. The overlap joint joints of the coil material should be sealed with a width of not less than 20mm to ensure the overall waterproof performance of the waterproof layer

11. [Single choice question] According to the provisions of the "Guangxi Zhuang Autonomous Region Dynamic Point Deduction Management Measures for the Safety Production of Housing and Construction and Municipal Infrastructure Engineering", construction and supervision enterprises use construction license or the project indicated in the start-up report as the scoring unit, and the total score of each scoring unit is (). (D)

A, 80 points

B, 90 points

C, 95 points

D, 100 points

12, [Single choice question] Among the following statements about the general architectural plan diagram content, the correct one is (). (A)

A. Two methods are generally used to locate new buildings. One is to locate original buildings or original roads; the other is to locate

B according to coordinates. In the total floor plan, the elevation is in meters and retained to three decimal places.

C. The schematic diagram of the wind direction in the area where the newly built house is located is Wind Rose Picture. The wind rose diagram cannot be used to indicate the orientation of houses and land objects.

D. Temporary buildings can exceed the building red line in design and construction

13. [Single choice question] The description of the inspection project before the grader is incorrect (). (A)

A, lighting and audio devices may be incomplete;

B, fuel, lubricating oil, hydraulic oil, etc. comply with the regulations;

C, each connection is not loose;

D, hydraulic system has no leakage;

14, [Single choice question] Among the following related statements about the durability of concrete, the correct one is (). (B )

A. The anti-permeability grade is a standard test piece of 28d-year-old standard test method. Each group of eight test pieces and six test pieces have no seepage. The maximum hydrostatic pressure can be withstanded to determine

B. It mainly includes anti-permeability , freezing resistance, durability, carbonization, alkali-resistant reaction, etc.

C, freezing resistance is 28. Standard concrete specimens for d-age age, conduct freeze-thaw cycle tests under saturation of water. When the compressive strength loss does not exceed 20% and the mass loss does not exceed 10%, the maximum freeze-thaw cycles can be determined by determining the maximum freeze-thaw cycle times that can be used. When there is a erosive medium in the environment in which the project is located, the durability requirement must be put forward for concrete

15. [Single choice question] Among the following basic regulations on the construction process of block masonry, the correct one is ( ). (B)

A. The thickness of the grey joint should be 15mm

B. The grey joints should be horizontal and vertical, and the horizontal grey joints should be full. The vertical joints should be squeezed and slurry to be used. It is strictly forbidden to rinse with water to clean the filling joints

C. At the bottom of the wall, before building the first skin aerated bricks , use solid bricks to masonry, and the height should not be less than 200mm

D. The contact area with the beam should be built with gray sand bricks after the aerated bricks are completed for 14 days. The top is tightened by

16. [Single choice question] Among the following statements about waterproofing projects, the incorrect one is (). (A )

A, waterproof concrete mostly uses a larger water-cement ratio to reduce the cement usage and sand rate , and choose a smaller aggregate diameter

B. According to the different materials used, waterproof projects can be divided into flexible waterproof and rigid waterproof

C, and Project location and use, waterproofing projects can be divided into roof waterproofing projects, underground waterproofing projects, floor waterproofing projects

D, waterproof mortar waterproofing achieves waterproofing requirements by increasing the thickness of the waterproof layer and improving the compactness of the mortar layer

17. [Single choice question] Among the following facilities, which do not belong to vertical transportation means ( ).(D)

A, stair

B, escalator

C, ladder

D, floor slab

18, [Single choice question] Among the following statements about full-time safety production managers, the wrong one is (). (C)

A. The person in charge of the construction unit's safety management organization and its staff are full-time safety management personnel

B. The full-time safety management personnel at the construction site are full-time safety management personnel

C. The full-time safety management personnel refer to the full-time safety management personnel who have passed the safety production assessment of the construction unit and obtained the safety production assessment certificate

D. The full-time safety management personnel should conduct on-site supervision and inspection of safety production

19. [Single choice question] The following comprehensive description of the construction project manager department is wrong (). (D)

A. The construction project manager department is an economic organization to which the enterprise belongs. Its main responsibilities are to manage various economic activities of construction projects.

B. The management functions of the construction project manager department are comprehensive, including planning, organization, control, coordination, command, etc.

C. The management business of the construction project manager department is comprehensive, from a horizontal perspective, including people, finance, materials, production and business activities, and from a vertical perspective, including the main process of the life cycle of the construction project

D. The construction project manager department is led by multiple functional departments of the enterprise

20. [Single choice question] Class II handheld power tool is applicable to the place (). (A)

A,

B in humid places,

C in metal containers,

D in trenches,

21 in pipelines, [Single choice question] According to the provisions of " Construction Safety Inspection Standard " (JGJ59), the on-site fence should be solid, stable, neat and beautiful, and construction sites on general sections of roads should be equipped with a closed fence with a height of no less than (). (B)

A, 1.2m

B, 1.8m

C, 2.5m

D, 3.0m

22, [Single choice question] Thickened welded steel pipe is used to transport pipelines with a working pressure of less than or equal to ( ). (C)

A, 1.4MPa

B, 1.5MPa

C, 1.6MPa

D, 1.7MPa

23, [Single choice question] The distance between the distribution power box and the switch box shall not exceed (). (C)

A, 10m

B, 20m

C, 30m

D, 40m

24, [Single choice question] The heat transfer process carried out between two objects that are in contact with each other and have different temperatures, or between different temperature parts of the same object without a correct macroscopic displacement in the event of a phase correct macroscopic displacement. (A)

A, thermal conductivity

B, transmission

C, correct flow

D, radiation

25, [Single choice question] According to the "Handle-choice Regulations on Safety Management of Construction Projects ", the construction unit shall submit the following information to the construction administrative department or other relevant departments of the local people's government at or above the county level where the construction project is located for filing: (1) Certificate of qualification level of the construction unit; (2) Instructions on demolition of buildings, structures and possible endangering adjacent buildings; (3) Demolition construction organization plan; (4) Measures for stacking and removing waste. When performing blasting operations, the national regulations on the management of civil explosives shall be complied with. (C)

A, 20

B, 10

C, 15

D, 28

26, [Single choice question] The curved part of the heating coil shall not be bent, and the curvature radius of plastic pipe should not be less than ( ) of the outer diameter of the pipe. (C)

A, 3 times

B, 5 times

C, 8 times

D, 10 times

27, [Single choice question] Each side of the cup mouth in a single-story factory should be larger than each side of the column ( ).(B)

A, 70mm

B, 75mm

C, 80mm

D, 85mm

28, [Single choice question] In the quality acceptance of the installation quality of building water supply and drainage pipeline system, the experimental method of horizontal clear distance between the water supply introduction pipe and the drainage pipe is (). (D)

A, observe and open valves, water nozzles, etc. to release water

B, inspect the test report provided by relevant departments

C, observe or local anatomical examination

D, scale inspection

29, [Single choice question] foundation beam will bear the weight of the upper wall and pass it to (). (A)

A, basic

B, base

C, wall

D, pile

30, [Single choice question] During the filling process, the filling personnel should not check the content () (A)

A. Is the pipeline temperature normal;

B. Is there any abnormal sound in the monitor bottle;

C. Is the bottle valve sealing intact;

D. Is the bottle body temperature normal?

31. [Single choice question] Doors, residences, apartments, etc. all belong to (). (B)

A, civil buildings

B, residential buildings

C, public buildings

D, industrial buildings

32, [Single choice question] Construction regulations refer to the general term for laws and regulations formulated by the state legislative body or its authorized administrative organs to adjust various social relations between the state and its relevant institutions, enterprises and institutions, ( ) during construction activities or during construction administrative management activities. (C)

A, community

B, citizen

C, social groups, citizen

D, local community

33, [Single choice question] is used to determine the phosphorus-molybdenum blue colorimetric method on site, and is suitable for water samples with phosphate content (), and the water samples and standard colors should be prepared and developed at the same time. (A)

A,. 2~50mg/L

B,. 5~50mg/L

C,. 10~50mg/L

34. [Single choice question] () is a sign of excessive water loss in babies. (C)

A, edema

B, drowsiness

C, thirst

D, night sweat

35, [Single choice question] The task of construction project control is to carry out four major target controls with project progress control, quality control, cost control and safety control as the main content. The following is not related to the construction project results (). (B)

A, progress control

B, security control

C, quality control

D, cost control

36, [Single choice question] The construction unit should organize experts to demonstrate and review the special construction plan, and the safe production simulation test will be passed, the project is () (D )

A, scaffolding project

B, blasting project

C, template project

D, underground excavation project

37, [Single choice question] The nature of the construction project manager department can be summarized into three aspects, namely ().(A )

A, ① Comprehensive; ② Relative independence; ③ Temporary

B, ① Construction project manager department is the economic organization to which the enterprise belongs; ② The management functions of the construction project manager department are comprehensive; ③ The management business of the construction project manager department is comprehensive

C, ① The construction project manager department has an administrative affiliation with the enterprise and must absolutely obey the overall leadership of the enterprise; ② The construction project manager department is a representative of the independent interests of a construction project, with independent interests; ③ The construction project manager department is responsible for the construction project from the start of construction to the completion of the construction project The management of the entire process of construction, production and operation

D. ① The construction project manager department provides information basis for the project manager's decision-making, implements the project manager's decision-making intentions, and is fully responsible to the project manager; ② Project Manager Department As the project team, it should have team spirit and complete the basic tasks assigned by the enterprise; ③ The project manager department is the main body to perform the project contract on behalf of the enterprise, and is responsible for the project products and construction units

38. [Single choice question] A project started construction in installments, and the developer's second phase project building 3 and 4 still copied and used the first phase project construction drawings. During construction, the construction unit found that the 02 standard drawings used in the drawing have been abolished. According to the provisions of the "Quality Management Regulations", the correct approach of the construction unit is (). (C)

A. Continue to construct according to the drawings, because the construction according to the drawings is the main part of the construction unit

B. Continue to construct according to the current drawing collection and revision

C. Timely, make modification opinions to relevant units

D. There are technical personnel of the construction unit to modify the drawings

39. [Single choice question] According to the " Production Safety Accident Reporting and Investigation and Handling Regulations " regulations: accidents that cause 10 or more deaths or more than 30 people, or serious injuries to less than 50 or more than 100 people, or direct economic losses of less than 50 million yuan or more than 100 million yuan belong to (). (C)

A, serious injury accident

B, major accident

C, major accident

D, death accident

40, [Single choice question] The commonly used materials for concrete foundation cushion layer are concrete of C15 and C20, with thickness ( ), and widened on each side ( ). (A)

A, 80~100mm; 80~100mm

B, 60~80mm; 80~100mm

C, 80~100mm; 100~120mm

D, 60~80mm; 100~120mm

41, [Single choice question] New construction of production and operation units. The safety facilities of reconstruction and expansion projects must be designed, constructed at the same time, put into production and use at the same time as the main project. () Investment should be included in the construction project estimate. (B)

A, security facilities

B, security facilities

C, monitoring facilities

D, public facilities

42, [Single choice question] Sintered porous bricks are bricks with hollow rate ( ) based on coal gangue , shale, fly ash or clay as the main raw materials, and are molded and roasted. (C)

A, ≥35%

B, ≥15%

C, ≤35%

D, ≤15%

43, [Single choice question] When the buttocks are slightly red, you can use (). In severe cases, you should go to the hospital for diagnosis and treatment. (C)

A, BB cream

B, eczema cream

C, buttock protection cream

D, moisturizer

44, [Single choice question] According to the "Regulations on Safety Management of Construction Projects", safety protection equipment, machinery and equipment, construction equipment and accessories at the construction site must be managed by a dedicated person, regularly inspected, repaired and maintained, established corresponding (), and scrapped in a timely manner in accordance with relevant national regulations. (A)

A, data archive

B, system archive

C, review archive

D, backup archive

45, [Single choice question] Company A bids to contract a high-end office building project for the general contracting business. The owner approved the professional project subcontracting to Company B with the corresponding qualification level. During the construction of the project, it caused compensation liability to cause 100,000 yuan in losses to the owner.The correct way to deal with this should be (). (B)

A. The owner can only ask B to compensate

B. A cannot refuse the owner's compensation claim of 100,000 yuan, but after compensation, he can claim B

C according to the agreement of subcontract contract . If the owner asks A to compensate, A can refuse

D on the grounds that B is the subcontractor recognized by the owner. B can refuse A's compensation claim

46. [Single choice question] Labor contracts with a fixed term and an unfixed term of more than three years shall not exceed () months. (D)

A, 1

B, 2

C, 3

D, 6

47, [Single choice question] The "Regulations on Safety Management of Construction Projects" stipulates that construction units shall not make requirements for relevant units that do not meet () regulations. (C)

A, construction project safety law

B, construction project safety regulations

C, construction project safety production mandatory standard

D, construction project safety production recommended standard

48, [Single choice question] When a cable is introduced into a building, the protective pipe that is penetrated should exceed the building's water (). (C)

A, 80mm

B, 90mm

C, 100mm

D, 110mm

49, [Single choice question] The connection method of steel structure does not include (). (A)

A, binding and connection

B, welding

C, bolt connection

D, rivet connection

50, [Single choice question] When special equipment operators discover potential accidents or other unsafe factors during operation, they should () immediately. (C)

A. Stop the equipment operation;

B. Leave the site;

C. Report to the on-site safety management personnel and relevant person in charge of the unit;

D. Start emergency plan

51. [Single choice question] Buildings with a height above ( ) have passed the personnel, production, and simulation tests. Evacuation is more difficult. Therefore, shelter layer and shelter (B)

A should be set up, and smoke protection facilities should be set up.

B, 90m

C, 100m

D, 110m

E, 120m

52. [Single choice question] If the main person in charge of a production and operation unit is subject to criminal punishment or dismissal in accordance with Article 91 of the " Work Safety Law of the People's Republic of China ", he shall not serve as the main person in charge of any production and operation unit within () from the date of execution of the punishment or punishment. (C)

A, three-year

B, four-year

C, five-year

D, six-year

53, [Single choice question] (Easy) Rebar grade HRB400 represents ( ) hot rolled ribbed steel bar with ( ) of 400MPa. (A)

A, yield strength

B, tensile strength

C, strength design value

D, proportion limit

54, [Single choice question] Currently, according to the statistics of production safety accidents in the country, the highest proportion is (). (A)

A, high-level fall accident

B, various collapse accidents

C, object strike accident

D, severe injury accident

55, [Multiple choice question] After each scaffolding is erected, () should be corrected according to the technical specifications. (ABCD)

A, step distance

B, longitudinal distance

C, horizontal distance

D, vertical pole verticality

E, vertical pole flatness

56, [Multiple choice question] The number and spacing settings of connected wall parts should meet the following requirements ().(ABD)

A, calculation requirements

B, maximum vertical and horizontal spacing requirements

C, minimum area coverage required for each wall piece

D, maximum area coverage required for each wall piece

E, no coverage area required

57, [Multiple choice question] After the self-inspection and inspection of the inspection by the installation unit, the tower crane user unit shall organize () and other relevant units to conduct joint acceptance. (ABC)

A, property rights (rental) unit

B, installation unit

C, supervision unit

D, construction unit

E, manufacturer

58, [Single choice question] When multiple shovelers work together, the distance between each machine must not be (). (C)

A, greater than 5m

B, greater than 10m

C, less than 10m

D, not less than 20m

59, [Multiple choice question] Regarding template construction and installation, the following statements are correct (). (ABC )

A, vertical formwork and support column support part is installed on frozen soil, and anti-freeze and thawing measures should be taken

B, template and its support During the installation process, temporary fixing facilities must be set up

C, cast-in-place reinforced concrete beam , and slabs. When the span exceeds the specified value, arches should be carried out

D, and when the layer is between When the height is greater than 5m, wooden column support molds should be used. When the height between layers is less than or equal to 5m, truss support molds or steel pipe column support molds should be used. [Multiple choice question] According to the provisions of the "Production Safety Law of the People's Republic of China", production safety work should be people-oriented, adhere to safe development, adhere to the principles of safety first, prevention first, and comprehensive governance, strengthen and implement the main responsibilities of production and operation units, and establish a mechanism of (). (ABCE)

A, the production and operation unit is responsible for

B, the employees participate in

C, government supervision

D, industry management

E, social supervision

61, [Multiple choice question] The reason why the forklift oil pump motor does not work when operating multi-way valve is (). (ABC)

A, oil pump motor switch fails

B, voltage is too low

C, motor failure

D, gantry lubrication

62, [Multiple choice question] During the construction of earthwork , if () phenomenon is found, the latest analysis work should be stopped immediately and corresponding measures should be taken. (ABE)

A, landslide

B, landslide

C, crack

D, water seepage

E, flow sand

63, [Single choice question] The object of the crime refers to the judgment protected by Criminal Law , which is the judgment of the socialist social transfer power of the crime (/) which is not an anti-public security management behavior () (C )

A, punish

B, possession of

C, infringement of

D, dominance of

64, [Multiple choice question] The electrical system of a battery vehicle is composed of () and so on. (ABCD )

A, battery group

B, DC motor

C, reversing switch

D, controller, contactor

65, [Multiple choice question] According to the provisions of the "Regulations on Safety Management of Sub-part Projects with High Risks " in various places, the competent departments of housing and urban-rural construction shall establish an expert database according to professional categories, and the basic conditions that experts in the expert database shall meet are ().(ABE)

A, honest and trustworthy, upright style, academic rigorous

B, engaged in professional work for more than 15 years or have rich professional experience

C, familiar with at least one foreign language

D, age over 35

E, with advanced professional and technical title

66, [Multiple choice question] According to the "Regulations on Safety Management of Construction Projects", the construction unit shall abide by the provisions of relevant environmental protection laws and regulations, and take measures at the construction site to prevent or reduce () harm and pollution to people and the environment. (BCDE)

A, kitchen fume

B, waste gas, waste water

C, solid waste

D, noise, vibration

E, construction lighting

67, [Multiple choice question] safety production management system mainly includes: (). (ABCE)

A, safety production responsibility system

B, safety production fund guarantee system

C, safety production education and training system

D, safety supervision and punishment system

E, safety production accidents and reporting and handling system.

68. [Multiple choice question] Branch projects are also called construction projects. (×)

69. [Multiple choice question] It is strictly forbidden to fix the formwork bracket, cable wind rope , pumped concrete and mortar conveyor pipe on the scaffolding. (√)

70. [Judgement Question] The State Council’s construction administrative department implements comprehensive supervision and management of the safety work of construction projects across the country. (√)

71. [Multiple choice question] There is the option of [Selective stickiness, safety production simulation exam one-point pass, post] in Excel. (√)

72. [Multiple choice question] "Auxiliary brake" is a brake that is used to prevent the car from slipping. Its function is equivalent to the car handbrake. (√)

73. [Multiple choice question] Both ends of the accompanying cable and the non-moving part should be reliably fixed. (√)

74. [Judgement Question] In factory buildings, the skeleton composed of components supporting various loads becomes a structure. (√)

75. [Multiple choice question] The principles of openness, fairness, justice and non-discrimination should be followed in the setting and implementation of administrative licenses. (√)

76. [Multiple choice question] According to GB16899-2011 "Safety Specifications for the Manufacturing and Installation of Escalators and Automatic Sidewalks": the brake stop distance of the additional brake does not have to be guaranteed to be the same as the brake stop distance required by the working brake. (√)

77. [Multiple choice question] The fireproof coatings for the wire troughs and conduits of the fire protection system should be evenly painted. (√)

78. [Judgement Question] liquefied natural gas is abbreviated as LNG in English. () ( √ )

79. [Judgement Question] When excavating a foundation pit, frequent re-testing and inspection should be carried out on plane control piles, level points, foundation pit plane location, horizontal elevation , slope slope , etc. (√)

80. [Judgement Question] The labor and personnel departments of construction enterprises shall put forward handling suggestions and opinions on persons who violate the safety production management system and labor discipline. (√)

81. [Judgement Question] There should be no oil on the surface of the traction wire rope. If there is oil, the wire rope will slip. (×)

82. [Multiple choice question] The chassis is used to support itself and receive the power generated by the engine, "safety production simulation test pass" and ensure that the vehicle can drive normally. () ( √ )

83. [Multiple choice question] When a vehicle is filling fuel, it is strictly forbidden to use various containers or other self-flow methods to fill fuel into carburetor on the engine. () ( √ )

84. [Judgement Question] The wall rod should adopt a flexible structure that can withstand tension and compression loads. () ( × )

85. [Multiple choice question] The purpose of adding complementary food is to supplement human milk or cow milk inadequate nutritional components. () ( × )

86. [Multiple choice question] The stroke limit switch shall not be used as the control switch for the construction elevator stops running.(√)

87. [Judgement Question] The energy conversion process in hydraulic transmission is that the pump wheel converts mechanical energy into the kinetic energy of the liquid, and the kinetic energy of the liquid is converted into mechanical energy through the turbine. () ( √ )

88. [Multiple choice question] Ignition temperature is an important basis for dividing the levels of explosive substances. () ( √ )

89. [Judgement Question] The fifth category of geotechnical engineering classification is time-stone . (×)

90. [Judgement Question] When setting up safety protection facilities, they must be approved by the relevant departments, and temporary power outages of the line or other reliable safety technical measures are adopted, and electrical engineering technicians and full-time safety personnel are supervised. (√)

91. [Judgement Question] In the architectural plan, the contour lines of the sections of the wall and columns that are cut into are drawn with thick solid lines, the other visible contour lines are used as medium solid lines or thin solid lines, the dimension marking and elevation symbols are used as thin solid lines, and the positioning axis is drawn with thin single points and long lines. (√)

92. [Multiple choice question] The removal order and installation order of templates are the same, that is, the template installed first is removed first, and then the one installed is removed later. () ( × )

93. [Judgement Question] Color steel plate doors and windows are doors and windows made of colored galvanized steel plates and are mechanically processed. (√)

94. [Judgement Question] House construction drawings are the final result of the engineering design stage, and are also the main basis for project construction, supervision and calculation of project cost. (√)

95. [Judgement Question] The "Special Equipment Usage Management Rules" are applicable to the safety and energy-saving management of special equipment within the scope of " Special Equipment Catalog ". () ( √ )

96. [Judgement Question] At the intersection of the slab, secondary beam and the main beam, when there is a ring beam or a pad beam, the steel bars of the main beam are underneath. (×)

97. [Judgement Question] When building the corners of the plate, the main large angle should not exceed 5 leather bricks, and should be built as soon as possible. (√)

98. [Multiple choice question] Waterproof concrete uses a larger water-cement ratio. (×)

99. [Multiple choice question] The function and structure of the ceiling layer are basically the same as that of the ceiling of the floor slab layer, and are divided into direct plastered ceilings and suspended ceilings. (√)

100. [Multiple choice question] Project management refers to the general term for the planning, organization, control, and coordination activities of the project by project managers using system theories and methods to achieve the project's goals. (√)