2022 first-class construction engineer economic gold test site construction drawing budget review method, first-built academic master notes, long press and like + forward + evaluation continue to be updated, click on my avatar on the Wendang version and send a private message to me: 2022
construction drawing budget review Methods of
1. Comprehensive review method—full review, detailed but flexible
2. Standard budget review method—using standard drawings, it is indeed fast
3. Group calculation review method—similar group review, small workload
4. Comparative review Method - There is a similar project there...
5. Screening and review method - I found that there are abnormalities in quantity and price engineering indicators and then check it in detail
6. Key review method ——For those with high volume and high price, focus on
7, decomposition and comparison review method—not mentioning the method of
construction drawing budget review
1, comprehensive review method—full review, detailed but flexible
6, focus review method—counter quantity Those with high prices focus on
2. Standard budget review method - using standard drawings
standard budget review method is to focus on preparing standard budgets for projects that use standard drawings or general drawings to review the project budget. A method. For projects constructed according to standard design drawings, the superstructure is generally the same, and only partial changes are made to the foundation part.