Using Beijing Jiabowen Biotechnology Co., Ltd. National Technology Invention Award technology, Zhangjiakou City’s only harmless disposal project for kitchen waste collection and transportation. With the joint participation of Zhangjiakou City Urban Management Comprehensive Administrative Law Enforcement Bureau and the participating units, a 72-hour performance assessment test was carried out from September 28 to September 30, 2022. This marks that the Zhangjiakou project has officially entered the completion acceptance stage.
Performance Assessment Site Witness Sampling
Zhangjiakou kitchen treatment project, as one of the supporting projects of Winter Olympics , undertakes the processing and guarantee of kitchen residues in the Zhangjiakou competition area of the Winter Olympics, and provides strong support for the construction of the "two zones" of the Zhangjiakou capital water source conservation functional zone, the ecological environment support area, and other fields.
The Zhangjiakou kitchen processing PPP project , jointly invested, constructed and operated by Zhangjiakou Chengjie Environmental Protection Group Co., Ltd. and Beijing Jiabowen Biotechnology Co., Ltd., adopts the BOT method, and the project cooperation period is 30 years. The Zhangjiakou project team of Jiabowen is mainly responsible for the project planning approval, equipment procurement and processing, engineering construction and installation, project debugging and operation, etc.
In the early stages of the 2021 project construction, the domestic epidemic situation is still serious, and the opening of Beijing Winter Olympics is getting closer. The project team is facing the dual pressure of preventing and controlling the epidemic and reducing construction periods. To this end, the team comprehensively sorted out and analyzed the overall project tasks, and gradually decomposed and implemented them in the planned task table, concentrating advantageous resources for key nodes and difficult tasks one by one.
In terms of project planning approval, we will increase coordination efforts among government departments, make good use of policy advantages, reasonably optimize various approval processes, shorten the approval time, and strive to start the project as soon as possible.
In terms of equipment procurement, we actively connect with various suppliers, keep a close eye on the progress of equipment processing, increase the intensity of contract fund guarantee, and ensure that the equipment is delivered on time.
Equipment entry
In terms of engineering construction and installation, due to the epidemic, personnel entry and equipment transportation are greatly restricted. The team reasonably adjusted the personnel entry method and equipment transportation route according to the prevention and control policies of the local project and between the various departure points, and ensured the timely investment of personnel and materials while meeting the requirements of epidemic prevention and control. During the equipment installation process, distributed construction methods are adopted, and the construction preparation threshold is greatly reduced in accordance with the principle of "blocked entry and gradual integration". On the premise of ensuring epidemic prevention and control, construction safety and project quality, intersecting operations with each construction unit will concentrate on breakthroughs as long as the construction conditions are met, greatly shortening the overall construction period, and completing the entry and installation of all equipment in less than 2 and a half months.
Equipment installation
In terms of project debugging and operation, debugging and training plans were scientifically specified, ensuring the completion of the entire process, accelerating the speed of operators to get started, and smoothly taking the project through a critical step from construction to use.
system delivery
With the full support of the company's leaders and other departments, and the efficient cooperation and unremitting efforts of colleagues in the team, the Zhangjiakou kitchen leftover treatment project, which is responsible for the Zhangjiakou project team, officially received kitchen leftovers from Chongli District, Zhangjiakou, the host of the Winter Olympics, on September 24, 2021, marking that this project officially entered the service stage of the Beijing Winter Olympics.
project officially operates
With the steady progress of the trial operation of the Zhangjiakou kitchen residue treatment project, the daily processing volume is also gradually increasing, the equipment of each system is running steadily, and all operating indicators are normal. The Zhangjiakou project team applied to the Zhangjiakou Urban Management Comprehensive Administrative Law Enforcement Bureau that, with the joint participation of the construction units, conducted a 72-hour performance assessment test from September 28 to September 30, 2022. This marks the official entry of the Zhangjiakou project into the completion acceptance stage.
The smooth implementation of the Zhangjiakou kitchen leftover treatment project has made up for the gap in harmless disposal of Zhangjiakou kitchen leftovers, and at the same time it has also achieved the Grand Slam of the international competition of Jiabowen kitchen processing service. Through the professional project management and technical services of the Jiabowen Zhangjiakou project team in the past two years, the local government authorities and owners have recognized Jiabowen's outstanding contributions to improving garbage sorting and standardized collection and disposal of kitchen residues, and have won a good reputation and reputation for the company.
Original title: The Winter Olympics kitchen processing project completed 72 hours of performance assessment test-Jiabowen team service was praised
Source: Jiabowen
Statement: Source: Jiabowen Copyright belongs to the original author! The Lingdong Core Environment Service Platform reprinted this article is to spread more information. If the text and pictures are infringed, or the source is marked incorrectly, or the reprint is not allowed, you can send a private message to us on today's headlines, and we will delete and process it as soon as possible!