Announcement on the Pre-examination of Construction Qualifications for the Multimodal Logistics Park Project Information Engineering of Lanzhou International Port Area 1. Bidding conditions This bidding project is constructed by the multimodal logistics park project in Lanzhou In

Lanzhou International Port Area Multimodal Logistics Park Project Information Engineering Construction

Pre-qualification Announcement

1. Bidding conditions

The information construction of the Lanzhou International Port Area multimodal logistics park project information engineering has been approved by the Xigu Park of Lanzhou Economic and Technological Development Zone with the approval of the feasibility study report of the Lanzhou International Port Area multimodal logistics park project (Lanjing Xibanfa [2017] No. 10) and the approval of the increase in the feasibility study investment estimate of the Lanzhou International Port Area multimodal logistics park project (Lanjing Xibanfa [2018] No. 6). The owner of the project is Lanzhou International Port Area Investment and Development Co., Ltd., the construction funds come from self-raised enterprises and bank loans. The project investment ratio is 3:7. The tenderer is Lanzhou International Port Area Investment and Development Co., Ltd. The project has met the conditions for bidding, and public bidding is now underway. Interested potential bidders (hereinafter referred to as applicants) are specially invited to submit pre-qualification applications.

2. Project overview and tender scope

2.1, project name: Lanzhou International Port Area Multimodal Transport Logistics Park Project Information Engineering Construction

2.2. Construction location: Gansu (Lanzhou) International Land Port location

2.3. Construction scale: This project mainly includes a multimodal production and operation service platform including customer service center, multimodal production management platform, handheld cargo receipt terminal system, fork truck terminal system, fork truck terminal system, mini program driver terminal, mini program Server side, intelligent gate integrated end, large data display screen, parking building driver terminal, data docking instructions, service deployment and storage instructions, and single sign-in system; the smart logistics park project includes integrated wiring system, computer network and security system, video surveillance system , modular computer room, comprehensive parking lot management system, border fence monitoring, display system, multi-function hall display equipment, conference room system, medium-sized conference room wireless, medium-sized conference room wired, small conference room, terminal equipment, RFID Construction contents such as procurement list, park automation gate, parking building automation gate, internal and external network separation equipment list, etc.

2.4 Investing amount is estimated: approximately 32.076713 million yuan.

2.5 Source of funds: Enterprise self-raised and bank loan

2.6 Bidding scope: All construction contents within the scope of the construction drawings of this project (specifically, the construction drawings that have passed the review shall prevail).

2.7 Total planned construction period: 180 calendar days. Planned construction time: December 1, 2022, planned completion time: May 29, 2023.