Immediately, the equipment was started, the vehicle was marshaled, and the materials were transferred. The armored vehicles drove to the evacuation area along the combat readiness road directly to the national highway. In midsummer, the reporter went to the "Songgufeng Heroes Reg

Source: PLA Daily·PLA News and Communication Center Integrated Media Author: Zhang Yadong, Zheng Yueming, Zhou Yuan, Zhou Bin,

In the morning, mist was shrouded in the mist, and the whistle of emergency gathering broke through the silence. Immediately, the equipment was started, the vehicle was marshaled, and the materials were transferred. The armored vehicles drove to the evacuation area along the combat readiness road directly to the national highway.

In midsummer, the reporter went to the "Songgufeng Heroes Regiment" of a division of the Central Theater Command Army. Just as a battle preparation drill was in progress, the strong practical flavor of the camp came to his face. The division leader introduced: "The troops were dispatched smoothly, and the construction of the camp was an indispensable contribution to the needs of combat effectiveness."

"In the past, we attached importance to ecological indicators such as greening rate, and the residential facilities were constantly improved; now we are more focused on fighting to fight." Du Kaidong, an assistant barracksman who participated in the drill, introduced that the construction of the camp is moving from "residential and life-oriented" to "security practical".

Du Kaidong is an "old barracks". In his memory, in the past, the construction of the barracks was horizontal and vertical and square, and the construction of barracks and roads was more beautiful. Nowadays, in the cross-section camps, the roads are on both sides of the road with direction markers made of different colors of plants and trees, and combat readiness elements such as the gathering of troops, the route of dispatch and the direction of travel are clear at a glance.

"The appearance of the camp today reflects the deeper concept of combat readiness." During the interview, two old soldiers who served in the department in the 1980s returned to the camp and witnessed the changes in the camp. They were filled with emotion: the barracks in the past were neatly arranged, with green trees and flowers in front of and behind the house; but the construction of the camp now first considers the training ground and combat readiness needs, which has a strong sense of war.

At the beginning of the "digital construction of the camp", the delegation urgently needed a new simulation training room. The 38 ginkgo trees in the camp became a "stumbling block" for construction site selection. Someone suggested: move the ginkgo tree out of the camp to facilitate the reconstruction of the training ground. Some people also expressed different opinions: these trees were planted by the troops when they moved defense more than 50 years ago. They were green in summer and golden in autumn. They were not only a beautiful scenery in the camp, but also a "witness" of the development of the troops. How can they be moved just by saying that?

In the face of voices from all parties, the Party Committee of the Youth League decided to continue to promote construction according to the digital construction schedule and properly transplant old ginkgo trees. Soon after, a simulated command and training system covering the three levels of regiment, battalion and company was completed and put into use. Three months later, the digital equipment was equipped, and the officers and soldiers skillfully operated the equipment and went directly to the tactical training ground.

Walking into the armored garage, the reporter's eyes lit up: There is a main road in front of the garage, four branches and two loops, which can enable multiple formations to enter and exit at the same time...Ma Chunxi, the stationmaster of the equipment management station, introduced that although it is now fully functional, spacious and convenient, it looks like a few years ago.

It turns out that the old armored yard was built in a "three-story step-like" style. It was built by generations of officers and soldiers to pick up stones and build nests and build them up on the mountain. Although it looks spectacular, it is not conducive to equipment dispatch.

new quality combat effectiveness construction cannot be built, nor can it be waited for. Resource allocation must be targeted at the needs of war. They changed the construction of the farm on the mountain to the construction of the farm on the mountain, realizing the "integration of the equipment reservoir area and the training ground into one", and the use of equipment in peacetime and emergency dispatch during wartime are organically integrated.

camp is equipped with everything for battle, and the road to combat preparation is unobstructed. The development process of camp construction from "eye-pleasing" to "fostering war" witnesses the focus of our army's construction to preparing for war.

The regiment used the transformed old camp to carry out urban offensive and defensive combat drills. Photo by Zhou Bin

(produced by the People's Liberation Army Daily·People's Liberation Army News and Communication Center integrated media)