In May 2019, there were 6 personal injury accidents in electricity, 7 deaths and 2 serious injuries across the country, with one decrease in the number of accidents and one death toll.

In May 2019, there were 6 personal injury accidents in electricity, 7 deaths and 2 serious injuries across the country, with one decrease in the number of accidents and one death toll. Among them, there were 6 personal casualties in power production and 7 deaths, an increase of 2 and an increase of 2. No personal casualties in power construction occurred, and 3 decreased year-on-year and 3 deaths.

In May, no direct economic losses of more than 1 million yuan occurred, and the number was the same as the year-on-year. There were 1 electricity safety incident, an increase of 1 year-on-year.

In May, there were no major or above personal casualties in power nationwide, no power equipment accidents, no collapse, flooding of dams in the hydropower station dams of the power system, or major impacts on society.

Personal casualties of electric power

1.On May 8, a personal casualties occurred in a Shanxi Jingyu Power Generation Co., Ltd. of Beijing Energy Group, Shanxi Jingyu Power Generation Co., Ltd., and 1 person died. During the overhaul of Unit 1, a staff member of the outsourcing unit Henan Huachen Construction Group Co., Ltd. fell from the main steam pipeline (elevation 52 meters) to the third floor platform (elevation 24 meters) on the No. 1 boiler room, causing one death.

2. On May 10, a personal injury and death occurred in a Lincang Town Kang Power Supply Bureau of Yunnan Power Grid Co., Ltd., with 2 people killed and 1 person seriously injured. An operator of the Lincang Town Kang Power Supply Bureau of China Southern Power Grid Yunnan Power Grid Co., Ltd., was dealing with the special transformer energy meter of the 10 kV umbrella line branch 4 Squadron, and the customer's property rights high-voltage metering box located above the fault meter suddenly exploded, killing 2 people and seriously injuring 1 person.

3. On May 11, a personal injury and death occurred in the Shaoguan Power Supply Bureau of Guangdong Power Grid Co., Ltd. and 2 people died. When the construction of the 10 kV line project of the Shaoguan Power Supply Bureau of Guangdong Power Grid Co., Ltd. of Ruyuan Yao Autonomous County Yinquan Power Industry Co., Ltd. was in the construction of the 10 kV line project of the Shaoguan Power Supply Bureau of China Southern Power Grid Guangdong Power Grid Co., Ltd., the construction personnel did not set anti-wear protection on the crossed low-voltage wires during the tightening process, causing damage to the insulation of the low-voltage line below, causing electric shock accidents and causing two deaths.

4. On May 11, a personal injury and death occurred in the Guojiawan Power Plant in Fugu County, Shaanxi Province, and one person died. During the ultra-low emission transformation project of the Guojiawan Power Plant of Shenhua Shendong Electric Power Co., Ltd., which belongs to the State Energy Investment Group Co., Ltd., during the construction of the small ash hopper at the lower ash hopper of the electrical dust collector of Unit 1, the hanging ears rooted at the upper ash hopper were torn, and the small ash hopper flipped and fell, cutting off the safety belt of the operator, causing two operators to fall from about 32 meters to the 26-meter platform, causing one death.

5. On May 12, a personal injury and death occurred in the Baozishi Hydropower Plant of Jiangxi Ganneng Co., Ltd., and one person died. The maintenance personnel of the maintenance unit Xiushui County Xinghong Construction Decoration Engineering Co., Ltd. fell from the roof insulation layer of the dam water discharge unit of Jiangxi Ganneng Co., Ltd., causing one person to die.

6. On May 20, Sanxia New Energy Pingquan Power Generation Co., Ltd. suffered a personal injury and death, and one person was seriously injured. During the process of handling the tripping fault of Line 3 of the on-site power collection line, the operators encountered an electric shock in the live area of ​​the 35 kV switch cabinet corresponding to the tripping of Line 3, and caused one person to be seriously injured when they checked within the interval of the 35 kV switch cabinet corresponding to the tripping of Line 3.

Power safety incident

On May 6, Chongqing Datang International Pengshui Hydropower Development Co., Ltd., had an incident of shutting down all operating units due to a power grid line failure. At 15:3 on May 6, the secondary cable of the State Grid Chongqing Electric Power Company 500 kV Zhangjiaba Substation failed, causing the 500 kV II and I busbars of the Zhangjiaba Substation to trip one after another, resulting in the entire operation unit of the Datang Chongqing Pengshui Hydropower Plant (installed capacity of 5×350,000 kW) affiliated to Datang International Power Generation Co., Ltd. to be connected to the grid to shut down, reducing the output by 1.48 million kW at a time.

Note: The above statistical data implements the "Regulations on Emergency Response and Investigation and Handling of Electric Power Safety Accidents" (State Council Order No. 599), the "Regulations on Reporting and Investigation and Handling of Production Safety Accidents" (State Council Order No. 493), the "Notice of the National Energy Administration on Issuing Supervision and Management Regulations on the Issuance of Power Safety Incidents in Single Power Supply Cities" (Guo Neng Safety [2014] No. 205) and the "Notice of the National Energy Administration on Issuing the Grade Division Standards for Power Safety Accidents in Single Power Supply Cities" (Guo Neng Electric [2013] No. 255).

Power Safety Supervision Department

July 1, 2019

Related Power Personal Casualty Stories Report

May 10, 2019, a personal casualty accident occurred in Kang Power Supply Bureau, Lincang Town, Yunnan Province, causing a fire in the explosion of a 10kV combined transformer (oil-immersed) customer property rights, causing 2 deaths and 1 serious injury.

1. Brief introduction:

On May 9, Wang Moumou, the power supply service team of the Nanshan Power Supply Station of Kang Power Supply Bureau of Lincang Town, found that the power of the special user Lincang Fourth Squadron of the Armed Police was abnormal in April. After inquiring that there was no significant change in the user load in April, and initially suspected that the power meter was abnormal. So Li Moumou (the power supply service staff member) and he went to inspect the special variable metering device on May 10.

At 16:17 on May 10, Wang Moumou filled out the low-voltage reporting form in the 4A-Production Management System-Fault Repair Module.

At 16:19 on May 10, the allocation center will dispatch workers after receiving the ticket.

At 16:24 on May 10, Wang Moumou received the order, and then Wang Moumou, Li Moumou, Zhou Moumou (meter reader) and three others set off from the power supply station.

16:30, Wang Moumou, Zhou Moumou, Li Moumou and three others arrived at the 10kV nitride umbrella line #2 pole at the installation position of the metrology device.

16:54, Wang Moumou filled out the "Written Form Arrangement and Record" and "Pre-Teacher Meeting Record" on the spot and sent it to Zhenkang Marketing Operations Control Group.

17:12, after reviewing the operating documents by the supervisor of the station (the safety supervisor of the power supply station stationed by the Zhenkang Power Supply Bureau), the on-site personnel agreed to carry out their work.

17 at 24:00, the protection action of the 110kV white rock transformer 10kV nitroum line overcurrent section I tripped, the reclosing failed, and the fault showed a three-phase fault.

17 at 27:00, a passerby found that the 10kV umbrella line #2 pole 10kV combined transformer exploded and caught fire. Someone was injured at the scene and called 120 emergency number.

17 at 40, the 120 ambulance arrived.

17:45, emergency personnel from Zhenkang County People's Hospital determined that Wang and Zhou were dead on the spot and sent Li to the hospital for treatment.

At present, the injured have been transferred to Kunming Hospital for treatment.

2. Equipment failure

Model: JLSW3-10 (oil immersion), Zhejiang South High and Low Voltage Switch Factory, put into production on July 24, 2018. After on-site inspection and confirmation, it was found that at the pole #2 of the 10kV nitroum umbrella line, the front, left and right sides of the 10kV combined transformer burst, and the negative control terminal and the power meter in the meter box have been burned.

10kV combined transformer

burn-in meter box

At present, the investigation of casualties and equipment failure analysis is still in progress.

2. Guangdong Shaoguan Power Supply Bureau’s “5.11” accident notice

On May 11, 2019, Guangdong Shaoguan Ruyuan Power Supply Bureau experienced an outsourcing personal electric shock accident during the construction of a new platform area of ​​the distribution network, killing 2 people.

1, project and project overview

The project volume of this project is a newly built 3-base tower and a platform transformer. It belongs to the bidding project of Guangdong Infrastructure and Distribution Network (Second Batch) Project (Second Section). Party A is Guangdong Shaoguan Ruyuan Power Supply Bureau.

Shaoguan Ruyuan Yao Autonomous County Yinquan Power Industry Co., Ltd. (a enterprise after the reform of employee shareholding of Shaoguan Power Supply Bureau) is the project construction unit. The two parties signed a contract on October 17, 2017.

2. Brief introduction:

: At 18:00 on May 10, Lin Moumou (labor dispatch), the squad leader of the 6th distribution team of Yinquan Electric Power Industry Co., Ltd. (hereinafter referred to as Yinquan Company), arbitrarily adjusted the line laying work of the #3-#1 pole line originally planned to be carried out on June 21 to May 11.

At 8:05 on May 11, the work leader Liu Moumou led a total of seven people including Li Moumou (deceased, 54 years old), Deng Moumou (deceased, 57 years old), Li Moufang, Ye Moufang, Wang Moumou, Lin Moumou and others to carry out the work of opening up the line. All of the above personnel are labor dispatch employees.

release range from the #3 public distribution transformer #3 pole to the branch line #1 pole, where a 380V live insulated low-voltage line with user ownership needs to be spanned in the middle of the pole #2-#1.

When Liu Moumou was working on the site, he directed the on-site construction personnel to install a PVC pipe about 0.67 meters long on the 380V low-voltage user line, and lay the lines in a working way that people climb the pole and pull it through the line.

8:35, the work leader Liu Moumou was putting the line on the line plate, Li Moumou and Deng Moumou pulled the line in front, and pulled it to the #3 of the town area to turn the branch line #1. After the wires in place, Liu Moumou used a seat belt to board the low-voltage user pole and was responsible for crossing the wire. Li and Deng pulled the wire rotation head of the branch line #1 pole to below the low-voltage user line (about 50 meters), and then crossed the upper part of the low-voltage user line PVC pipe.

9:17, when preparing to release the second wire, the release plate failed. Liu left the user line low-voltage rod to check the release plate, and arranged for Li Moufang to pass the wire on the rod, Li Moumou was responsible for dragging the wire, and Deng Moumou was responsible for delivering the wire.

Li Moufang asked to follow the method of the first wire, but Li Moumou pulled the wire about 10 meters below the low-voltage line that was spanned by the distribution transformer, but before pulling it to rod #1, he turned his head and pulled it below the low-voltage line, and then crossed from above the low-voltage user line PVC pipe.

9:20, because the force on both ends of the wire was too high, Li Moufang took off his hand, and the wire ran off the wire, directly touched the insulated contact of the low-voltage user line and discharged, causing Li Moumou and Deng Moumou to be pulled.

The work leader Liu Moumou, Li Moufang and other staff took the risk to save people with bare hands without cutting off the power supply of low-voltage live line and without taking safety measures to prevent themselves from being electrocuted.

9:23, work class member Ye Moufang called 120 for emergency number, and 120 suggested that before the ambulance arrives, the person who was electrocuted should be sent to the nearby No. 16 Health Center for treatment as soon as possible.

9:33, Liu Moumou and Li Moufang carried the electric shocked person Li Moumou onto the tool truck and sent it to the No. 16 Health Center, and Li Moufang continued to perform cardiopulmonary resuscitation on the tool truck. At 9:45, he arrived at the 16th Health Center, and the 16th Health Center immediately carried out first aid measures such as cardiopulmonary resuscitation on Li Mouyang.

9:40, working class members Ye Moufang and Lin carried Deng Moumou to the location of the accident and performed cardiopulmonary resuscitation.

9:49, after Liu returned, he and Ye Moufang and Wang Moumou took Deng Moumou to the No. 16 Health Center with tool trucks, and Wang Moumou continued to perform cardiopulmonary resuscitation on the tool truck.

9:53, he arrived at the 16th Health Center, and the 16th Health Center immediately carried out first aid measures such as cardiopulmonary resuscitation on Deng Moumou.

10:02, the 120 ambulance arrived at the 16th Health Center.

10:17, the rescue of the 16th Health Center was invalid, pronounced Li Moumou dead.

10:27, the rescue of the 16th Health Center was invalid, and Deng Moumou was declared dead.

12:00, Shaoguan Power Supply Bureau initiated a Level IV response to the personal accident.

3, preliminary cause analysis and exposure problems

preliminary analysis, the accident exposed the following problems:

, first, change the operation plan without authorization. did not report to the owner and changed the work plan without authorization.

Second, it is a serious violation of procedures. Before the work leader was released, he knew that the cross-cross line operation needed to apply for a power outage, but did not apply for a work ticket for the power outage, nor did he take measures to set up a leap frame in accordance with the requirements of the "Power Safety Work Regulations" to operate wildly.

Third, the on-site organization is chaotic. construction force is insufficient, the work leader and the safety officer are involved in the work, and they lose full-time supervision; the infrastructure line operation instructions have not been prepared, and the construction personnel have not given written safety technical briefings; the construction personnel do not obey the command and are greedy for saving speed.

Fourth, take risks to rescue. construction team members lack safety awareness for emergency rescue. Without cutting off the power supply of low-voltage live line and taking safety measures to prevent their own electric shock, they risked to save people with bare hands.

registration is about to end Scan the code (read the original text) to learn more ....

Comprehensive Energy Service Special Training (Issue 4)

7-18-19·Tianjin

Teacher Ma 18833801856

More

Highlights