Renovate and renovate 20 congested road sections and 17 congested nodes; improve the road network construction around congested nodes; renovate and renovate 20 congested road sections and 17 congested nodes; accelerate the construction of rail transit and optimize the ground bus

2024/05/2305:46:33 hotcomm 1952

Renovate and renovate 20 congested road sections and 17 congested nodes; improve the road network construction around congested nodes; renovate and renovate 20 congested road sections and 17 congested nodes; accelerate the construction of rail transit and optimize the ground bus  - DayDayNews

Renovate and reconstruct 20 congested road sections and 17 congested nodes

Improve the construction of road networks around congested nodes, renovate and reconstruct 20 congested road sections and 17 congested nodes; accelerate the construction of rail transit, optimize the ground bus line network; improve and improve the road pedestrian system , non-motor vehicle commuting system, pedestrian crossing facilities; improves the highway and expressway information release system and intelligent guidance system.

Renovation and construction plan for some congested road sections

Continuation of the second phase of the eastward expansion of Weiqi Road : Starting from the west bank of Xiangshui River in the west, and connecting Gaoqiaomen Interchange and the ground roundabout in the east

Continuation of the southern section of the second airport channel : Starting from the ring expressway in the north , to Dazhou Road in the south

Tiexinqiao overpass reconstruction: the original up and down ramps on the north side of the interchange are abolished, the upper ramp is moved west to to connect with Fengning Road , the down ramp is moved east to connect with Dengfu Road , and the northwest quadrant ramp is adjusted to connect with Fengning Road is connected to

Airport Expressway - Software Avenue node: reduce the green island in the middle of the intersection, widen it by 3 meters from south to west, and add a left turn lane

Longxi Interchange Phase II: Hongyun Avenue Three additional ramps will be added to intersect with the Airport Expressway.

The first phase of Hongshan South Road will be extended to the east. The first phase will start from Hongshan Road in the west and end at Jingwu Road in the east.

The west extension of Hongshan South Road will be continued. will start from Central North Road in the west and end at Huangjiawei in the east. Road

Hongshan Road-Heyan Road rapid reconstruction Phase I: Starting from Xinzhuang Interchange in the south and ending at Weiyi Road in the north, two tunnels will be set up along the entire line to pass through Hongshan South Road and Mai Yao Road respectively

Renovate and renovate 20 congested road sections and 17 congested nodes; improve the road network construction around congested nodes; renovate and renovate 20 congested road sections and 17 congested nodes; accelerate the construction of rail transit and optimize the ground bus  - DayDayNews

to control 64 black and odorous roads including Mingyu River Water body

In terms of water environment improvement, we focus on the improvement of black and smelly rivers, control sources and intercept pollution, and pay equal attention to construction and management. We will quickly promote comprehensive improvement of the water environment and transformation of flooded areas, improve the sewage collection system in the main city, and reduce the intensity of sewage discharge. Control 64 urban black and smelly water bodies including Mingyu River. Part of the black and smelly river management plan

Tangjiashangou : rectification of sewage discharge from river outlets and forestry universities and other units, increasing water diversion and replenishment

Youyi River : construction of peripheral main pipes, river dredging and rectification, interception of sewage at river outlets, Ecological restoration

Mingyu River : river dredging and regulation, interception of sewage at the river outlet, ecological restoration

Inner Qinhuai River (north, east, middle and south sections): river dredging and regulation, interception of sewage at the river outlet, Ecological restoration

Xiangshui River: Accelerate the cleanup of garbage and river floating objects on both sides of the river, and implement sewage interception and transformation of industrial and industrial units along the river

Inner Jinchuan River mainstream : Improve the rainwater and sewage diversion of Nanrui Road, implement river dredging, and add large trees Root gate water diversion

Chengnan River: Dredging, maintenance and repair of the river interception system along the river, sorting out the main and secondary sewage pipes, improving the collection system, intercepting and collecting sewage; adding artificial oxygenation and ecological floating islands

Crescent Lake : River dredging and improvement, sewage interception along the river outlet, ecological restoration, partial flooded area improvement plan

Youyi River area : Comprehensive improvement, estuary pumping station construction, high water regulation and storage, high discharge channel

Guanmen North Village : New pump station

Ziyang Road : Pipe network renovation

Yikang Street area : Pipe network renovation, new pump station

Yangzijiang Avenue Huanghe Road, Huaihe Road pump station : Pump station cabinet upgrade and equipment maintenance

Forte Xindu , Anhuai Village East Road intersection : Add 200 meters of rainwater main pipe, 30 meters of rainwater branch pipes, and 10 water collection wells

Xishanqiao Old Street : Build flood control embankments, renovate Xinhe pumping station, and dredge the drainage pipe network

Outside Zhongshan Gate Main Street Wukesong: New flood channel, expansion of drainage pipe network, reconstruction of Wukesong Reservoir spillway. Zhonghua Road and Zhanyuan Road intersection: replacement of rainwater management pipe Pukou Avenue flooded area: reconstruction of drainage pipe network focusing on the Olympics