[ Suzhou Decoration] Wujiang District·Taihu Lake East Bank Water and Electricity Completed and Prepared for Air Conditioning to Come in, Home Decoration, 6 Things Others Will Not Tell You About Water and Electricity
1. Water and electricity work is relatively complicated It's trivial. Many people think that the cost of water and electricity is not low. First, there are many positions for water and electricity, including some additions and changes in the later period. Because water and electricity is a hidden project, after the water and electricity air conditioner is installed, the plumber and electricity master has to come to wire the air conditioner and the power supply line of the air conditioner. After the installation is completed, After that, the plumbers will come over to install switch panels, downlights and other installations. Plumbing is a work from beginning to end
2. The outdoor terrace, because now ht The of the ml1 sunroom has not been sealed yet, so now the wire pipes like this are all covered with PVC glue to prevent water from pouring in. There is no pipe leading indoors, including indoors. Where does this line come from? It is 30 kilometers from the ground indoors. It is a wire that is led through the wall, so the closer you get to the balcony, the more attention you have to pay attention to that this wire cannot be drilled out of the ground to prevent water from seeping into the room in the future. If the surface is waterproofed, the effect will be very good, and it can prevent from returning to moisture. , it doesn't matter even if the sun room is not sealed. Of course, the owner still has to seal it.
3. There are embedded linear lights on the wall next to the stairs. Originally, the owner used step lights, but he didn’t like it because the tread surface couldn’t be illuminated under the steps. He felt it wasn’t bright enough, and an extra wall light was needed in the aisle. So this way, all the wall lights were eliminated, including those downstairs. Some corners are like this. The plumbers fixed it very thoughtfully. They first used PVC pipes to support it to keep the wall flat. Later, they could just scrape it off with putty.
4. Why is there a water pipe running on the ground in the middle? This is the location of an island. Water pipes must be buried from the ground. They are hidden inside through this pipe. It is ensured in the later stage that the floor paving cannot be seen. The location of the island, water, electricity, and three-piece sewerage set must not be left behind. All must be planned in the early stage, including its positioning, its guide, and the position of the basin. The left one should be placed on the left, and the right one should be placed on the right. These must be positioned in advance.
5. The bathroom is for a bathroom that is only half sunk. In this case, special attention should be paid to the difference between the drainage point and the other side. There must be a slope. So now we open the grooves from the ground, and all the PVC 50 pipes are grooved. Raise the middle part of the local position and put the slope over. It is normal advice. If the position cannot be raised very high like this, we recommend lifting 1 centimeter per meter. Like here, it is about three or four meters, so it needs to be raised about 3 centimeters to keep the water flowing smoothly. Including the position of the spout, the inclined tee to prevent water backflow, so that the drainage of the double basins will not be affected. Make a P bend here, and make the two basins deodorant. It can make it sway randomly, because the position is very tight, and only the fasteners and fittings exposed on the wall of the finished product can be stuck together, so the cement is first used to paste the pipe embedded parts tightly, so that the position is stuck. If it is installed later, it should be within the adjustable range, and then the installation is carried out. After laying the tiles, the maximum finished surface cannot exceed the max line, otherwise it will not be installed later, so it is not only the plumber who has to take this into consideration. When the bricklayer is laying the tiles, even if the wall is painted and leveled, this matter cannot be missed