For people who have no decoration experience, they will think that custom furniture ( cabinet , wardrobe, etc.) is installed after the basic decoration is completed, so there is no need to rush to place an order. After all, it is installed later. However, this idea may cause you to delay construction period or overturn the decoration! The main reason is the design and installation node of the cabinet, which is easily overlooked by decoration novices. Let’s talk about the precautions for ordering customized cabinets and customized furniture!
Generally speaking, the cycle of customized cabinets from ordering production to installation takes about 15-30 days, depending on whether the manufacturer is busy. If you are more in a hurry to build the construction period, it is recommended that the merchant be notified after the kitchen wall tiles and floor tiles are completed and the final design plan is determined.
Although the compound ruler is completed after the wall tiles and floor tiles are completed, the cabinet can be placed before placing an order. It requires a deposit before placing an order before the water and electricity construction is required, and the general design plan is determined in advance, so that the cabinet customization company can first produce a good kitchen water and electricity diagram! Because the embedded appliances in the kitchen need to be combined with the cabinets, where laminates and shelves need to be installed, and which spaces need to be placed and which appliances are placed, the cabinet company needs to plan, and then set up socket power supply according to this plan.
If you meet the plumber in the person in charge, he will ask you how to keep the water potential in the kitchen. At this moment, you are confused and then go to find a custom cabinet, which will delay the construction period for several days.
If you meet a plumber who has "more ideas", ask you a few questions and leave a socket for you according to his experience. After the kitchen is tiled, you may have a situation where the kitchen appliances are not enough, the location is inaccurate, and the car will overturn!
But it should be noted that the cabinet is placed before the water and electricity construction, and is actually installed after the order is placed, and there is a long decoration cycle between them. In order to avoid passiveness (such as running away, paying attention to later changes, etc.), it is recommended to place an order only a small amount of deposit, and give a certain proportion of the amount when the tiles are finished after the tiles are finished, and some final payment is reserved before the installation is finished.
Bathroom cabinets are generally production cycle for about 215 days. This cabinet may be made together with customized furniture, or it can be made separately.
Bathroom cabinets are available in standard sizes and customized styles. Different standard sizes are available in different manufacturers, and also in different sizes (usually an integer multiple of 5 or 10). The width is generally 60cm-80cm.
If the installation location of the bathroom cabinet you reserve is non-integrated, for example, 73cm wide, if you want to make seamlessly embedded installation on both sides, you need to buy a customized model. Customized bathroom cabinets can be purchased offline or online.
What you should pay attention to when buying a bathroom cabinet online is to buy a style with the same width as the cabinet body, and measure the upper, middle and lower sizes; then the countertop of the cabinet body is 3-5mm smaller than the reserved size, and leave a 2-3mm gap on both sides to apply a glass glue to close the mouth.
In addition to cabinets, furniture that requires customization also includes wardrobes, shoe cabinets, sideboards, tatami , etc. If there are many furniture, the production cycle will take about 30 days. You can choose the same brand as the cabinet. In this way, you can get a greater discount when negotiating the total price, and can also be uniformly allocated after installation.
Usually, custom furniture must be ordered after the foundation is hard-decorated before the foundation is completed, while the cabinet must be placed before the water and electricity construction. If you choose the same house to customize the cabinet and whole-house, you can ask the merchant to measure the plan at this stage. After the foundation decoration is completed, you can place an order as soon as possible to produce the order as soon as possible to reduce the delay in construction period.
The cabinets in customized furniture are a relatively special existence because they are related to the socket power supply of kitchen appliances. Therefore, when decorating, you must pay attention to the ordering node of the cabinet to avoid the occurrence of renovation overturns!