Now our country is vigorously advocating environmental protection and conservation, and conservation has always been our traditional virtue. After continuous innovation and development in the construction industry, more and more new materials have emerged. Among them, as an important plastic building formwork in construction construction, how can we achieve the multiple use of building formwork ? This time, the hollow plastic construction template manufacturer - Gu'an Plastic Industry, will talk to you.
If we want to make the plastic building formwork have a longer service life and can be recycled repeatedly, we must pay attention to it in terms of storage and maintenance, construction and installation, mold removal, etc.
First of all, in order to enable customers to use it better, when storing hollow plastic building forms on construction sites, it is necessary to note that plastic building forms should be stored on flat and dry ground. There should be no less than 3 horizontal wooden brackets of 10*10cm at the bottom. Avoid storing it in places with high temperature and humidity. You can also apply a layer of template paint to make its surface not easy to corrode and reduce the wear of the template. After applying and painting, it can not only play the above role, but also effectively isolate some debris and some concrete sand, so as to greatly increase the service life of the template. Another thing is that for some painted templates, they can not only achieve a good effect, but also have a beautiful effect, making the panel look cleaner and smoother.
Again, plastic building formwork must be operated in standardized manner during construction and carefully inspected the project. During the construction process, the support of the formwork must be correctly built and firm. When installing screws, the tightness of each screw must be consistent to ensure construction safety. It is necessary to build firmly and avoid bad weather for construction. Hollow plastic building formwork manufacturers friendly reminders that they do not accurately grasp the standard loading of the formwork when considering the support standard load, which in turn causes serious loading; and the other equipment used is of poor quality and cannot effectively achieve the due effect.
Finally, things to note when decomposing the mold. When removing the mold, it is disassembled from both ends of the scaffolding at the same time and falls. Be sure to keep it horizontal when falling, and do not let the corners fall vertically against the ground. Remove the mold from the small formwork while disassembling the support while removing the template to prevent large-scale falls. It is best not to let the corners directly hit the ground, and try to clean the hard construction waste on the ground such as iron nails, scrap steel bars, etc. to prevent damage to the surface of the formwork and affecting the next use.
If we want the hollow plastic template to achieve an extremely high turnover life, we must carry out construction according to the standards in our daily use to avoid violent demolition. Regarding the method of using plastic building templates multiple times, the above article will be explained here, hoping to help you.