House water and electricity decoration is a hidden project and a relatively tedious job. It is also the easiest project for decoration companies. At the same time, it is also a project related to our safety and the convenience of later move-in. I don’t think I need to say that you all know how important hydropower is to us, but we are not very clear about the installation of hydropower, and because most people don’t know much about hydropower, they just hand it over to the decoration company. In fact, this is wrong. We can only listen to what the decoration company says without knowing it.
So there are some things to pay attention to when decorating, so let’s introduce today what are the precautions for house water and electricity decoration?
01
clear line layout of the house before the water reform
first Understand the construction drawings of the hydropower layout, and know the location of the hydropower pipelines, the number and location of the sockets, and the layout of the downpipe and the uppipe to avoid problems with the layout of the upper and lower pipes during decoration.
02
installation wires
we generally when installing wires,They all like to pursue the so-called horizontal, horizontal and vertical, but this is of no use to the house, and once there is a problem, the installed wire may become a dead wire, and if the wire needs to be changed, it may not be able to be drawn out. Note: Do not use 16 for the wire tube. The tube is too thin, it is easy to jam. I prefer to use a tube with a diameter of 20 to thread the wires smoothly and without damaging the wires when changing the wires. quality
03
selection of material
buy water and electricity materials is extremely important, and now we The water pipes on the market are generally made of PVC because of the long use time. When we choose, we try our best to choose the brand, so that the quality is more guaranteed. If the water pipe without quality assurance is installed, it will be very troublesome to repair if there are problems in the future.
04
kitchen, bathroom selected
wire
Except for the bedroom,The kitchen and bathroom are the places we often use, so we must pay special attention. Try not to use 2.5 flat wires in both of our places. This type of wire is easily overloaded and dangerous. I prefer to recommend that they all use 4-plane wires. The load capacity is too large and it is not easy to overload (too much or not). If you need to use a thermal electric water heater, we can choose a 6-square-meter wire. The same is true.
05
drainage
some of our family have this problem , that is, drainage It's easy to jam and it's very annoying. In fact, we are very simple. Try not to make a right-angle bend for the drainage pipe. Try to make an oblique bend. It is best to use a 45-degree drainage bend. This is relatively smooth and not easy to block.
06
kitchen socket
kitchen outlet Do not leave the stove too close,Not only is it difficult to clean up, it is also inconvenient to use. It is recommended that you may consider making a socket with a switch 1.3 meters above the ground.
07
toilet water and electricity installation
we compare the headache is the bathroom where, if accidentally If there is a water leak, the neighbors downstairs will complain. Therefore, when we install the water and electricity in the bathroom, we must be careful not to walk on the ground, and choose to walk on the roof as much as possible. This installation can prevent water leakage from affecting the relationship between neighbors, because it will flow away along the floor drain in your home.
08
laundry room floor drain
Although we have separate laundry room washing machine Of drainage,So we generally don't leave a floor drain here. But in case the washing machine leaks, and we did not find out in time, it is easy to accumulate water. So don’t remove the floor drain next to the washing machine, leave a floor drain, so it doesn’t matter if we don’t find it in time, the floor drain can quickly drain the water away.
09
carry out the supervision work
hydropower engineering work is hidden, in order to avoid decoration After the problem occurs, when the construction master is doing the water and electricity decoration, we must do a good job of supervision to prevent them from cutting corners. After
10
final acceptance
hydropower projects completed,The initial acceptance is required. The acceptance criteria include: pipeline joint inspection, tightness inspection at corners, etc., and check whether the overall layout is the same as the design drawing, and whether the layout of water pipes and electric pipes are correct. If problems are found, they should be submitted to the construction in time The master responded and revised it in time.
Source: The above pictures are from the Internet. If there is any infringement or falsehood, please contact us to delete it in time.
.